Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.

Slides:



Advertisements
Similar presentations
Accelerator Division Sergei Nagaitsev Scientific Advisory Council 6 April 2015.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
PIP Update June 26 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Proton Improvement Plan (PIP) William Pellico PIP and MI 700 kW review 21 – 22 January 2015.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Accelerator Operations and PIP Sergei Nagaitsev DOE OHEP briefing 6 March 2014.
High Power Proton Facilities Sergei Nagaitsev APS April 2015 meeting 11 April 2015.
Report from Fermilab Presentation to ICFA Symposium Daegu, Korea September 2005 Pier Oddone.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
Accelerator Status and Plans
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for LSCS-DBI-APP Dennis Box June
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Objectives of the Proton Improvement Plan Stuart Henderson Fermilab Proton Source Retreat Dec. 7-8, 2010.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
PAC Meeting, December 12, Prebys 1 The Problem.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Fermilab Project Overview Michael Lindgren 2014 EVMS Surveillance Review 10-Dec-2014.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Status of FNAL accelerator complex Sergei Nagaitsev 47th Annual Fermilab Users Meeting 11 June 2014.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
Computing All Hands Meeting Rob Roser 20 February 2015.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
INTRODUCTION PASI 2015 Swapan Chattopadhyay. ACKNOWLEDGMENT Steve Geer Steve Holmes Ken Long Peter McIntosh Sergei Nagaitsev Vladimir Shiltsev Alexander.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Strategic Planning Process Erik Gottschalk Fermilab Physics Advisory Committee Meeting – June 22-25, June 2015.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
A Post P5 Planning Exercise at Fermilab Greg Bock Fermilab PAC July 24, 2014.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
Accelerator Operations and GARD Sergei Nagaitsev OHEP Budget Briefing 4 March 2015.
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
News and brief overview of Beamline plans for the next few months
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015

6/16/2015S. Nagaitsev | AD View2 Fermilab Accelerator Complex Linac: MTA BNB: MicroBooNE NuMI: MINOS+, MINERvA, NOvA Fixed Target: SeaQuest, Test Beam Facility, M-Center Muon: g-2, Mu2e (future) Fabrication, Test and R&D facilities. ~16 km of accelerators and beamlines, second largest accelerator complex in the world. About 700 FTE accelerator-related workforce.

Accelerator and Technical Divisions AD: 450 FTEs, of which 115 FTEs are working on various projects (including 24 FTEs on PIP-II) in various stages of completion. TD: 230 FTEs (highly project-oriented) –Two core technology competencies: SCRF and Magnets (sc and warm) Several projects end starting in FY17 and we are planning to redirect the workforce to PIP-II. 6/16/2015S. Nagaitsev | AD View3

6/16/2015S. Nagaitsev | AD View4 Adapting the division organization Muon department replaced Tevatron and Pbar departments New PIP-II department Accelerator Physics Center: –Missions: PIP-III R&D (>2 MW), Modeling, MAP, Education and Training New Target Systems department –Responsibility for NuMI, BNB, g-2, Mu2e target stations –LBNF target design –R&D in high-power targets and radiation damage in target environments (Multi We are preparing the organization for high-power neutrino projects (LBNF and PIP-II)

6/16/2015S. Nagaitsev | AD View5 Priorities Priorities help us decide what to work on Importance x Criticality = Priority (strategy) x (time) Importance is the overall strategic value Criticality is a time issue…must this be done now based on schedule, external commitment, or a window of opportunity? Common sense, good judgment, emergency response, … always needed of course (employees & supervisors)

6/16/2015S. Nagaitsev | AD View6 Importance rankings for lab-wide Priorities 1.LBNF + DUNE 2.LCLS-II (we must deliver….and we are) 3.PIP-II 4.LHC Upgrades (CMS, LARP, …) 5.Muon g-2 (go go go) (high criticality here) 6.Mu2e (go go go) and associated AIPs 7.Operations in order: 1.NOvA 2.MicroBoone 3.Everything else 8.SBN (small but fast track) 9.Cosmic projects and ops (small but leveraged) 10.R&D (a core competency) accelerators & detectors May 2015

6/16/2015S. Nagaitsev | AD View7 Proton Improvement Plan Goals and Scope (Established in 2011) Increase the Booster beam repetition rate from the present ~7.5 Hz to 15 Hz –Need at least 9 Hz for NOvA 12-batch slip-stacking –Requires refurbishment of Booster RF cavities Eliminate major reliability vulnerabilities and maintain reliability at present levels (>85%) at the full repetition rate Eliminate major obsolescence issues Increase the proton source throughput, with a goal of reaching >2E17 protons/hour –Presently operating at <1E17 protons/hour Ensure a useful operating life of the proton source through at least 2025 (now extended to 2030 to accommodate PIP-II schedule)

6/16/2015S. Nagaitsev | AD View8 Booster RF cavities July 1970 Flatbed semi delivering Booster RF cavity pair Cavities built by GE

6/16/2015S. Nagaitsev | AD View9 PIP – Booster Cavity Refurbishment First new tuner – built & tested Has been a challenge but now almost complete (17 th of 22 stations this month) East gallery complete and running 15 Hz tests After 2+ years vendor able to produce suitable ferrite for new tuners Old cavities had many problems - especially the tuners: Water Leaks Burnt RF Fingers Connection Flange Additional 20 th cavity being tested 15 Hz (salvaged original cavity – major rebuild)

Goals for the next couple of years Ramp up beam power to 700 kW for NOvA (FY16) Achieve 15 Hz Booster beam pulse repetition rate as soon as possible by carrying out Proton Improvement Plan (FY16) Complete Muon Campus construction on budget and on schedule and commission g-2 experiment in FY17 Finish PIP in FY19 and move on to PIP-II 6/16/2015S. Nagaitsev | AD View10

6/16/2015S. Nagaitsev | AD View11 Only remaining original hardware in Booster will be the magnet system and some small fraction of utilities –All other systems will either be relatively new (<10 years) or significantly upgraded Linac upgrades will allow reliable delivery (>85 % uptime) of beam till 2023 –Plans for longer lifetime operations, 2025 and beyond, will not be pursued such as the replacement of high power 7835 triode Once PIP Completed

We are fully committed to make the jump! 6/16/2015S. Nagaitsev | AD View kW PIP II 1.2 MW

6/16/2015S. Nagaitsev | AD View13 R&D toward multi-MW beams and targets at Fermilab costs/kiloton versus costs/MW –Strategy after PIP-II depends on the technical feasibility of each option and the analysis of costs/kiloton versus costs/MW –R&D on cost-effective SRF, control of beam losses in proton machines with significantly higher currents (Q SC ) and on multi-MW targets –Establishing IOTA facility to explore novel approaches to rings PIP-II Beyond PIP-II (mid-term)

Summary Fermilab delivers the highest-power proton beam for neutrinos now. We are fully committed to maintain our leadership in the future. We are fully capable of executing complex accelerator projects. We will make what is necessary to make PIP-II project executed on budget and on schedule. 6/16/2015S. Nagaitsev | AD View14