CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.

Slides:



Advertisements
Similar presentations
Rodent Habitat (RH) & Rodent Research (RR) Concept of Operations December 2013 ARC/Cecilia Wigley Rodent Research Operations Manager JSC/Brienne Shkedi.
Advertisements

Navigating SSEP Experiments from Selection to Flight SSEP National Conference 2012 July 2, 2012 Dr. Harri Vanhala National Center for Earth and Space Science.
C2V2 Technical Requirements and Constraints
International Space Station: National Laboratory Development Brad Carpenter Space Operations Mission Directorate NASA Headquarters.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
NASA Bioculture System Capabilities Provides 10 individual cassettes containing hollow fiber bioreactors with media perfusion for a no shear cell culture.
Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold.
5-1 Constellation Space Suit System Government Capabilities and Facilities Crew and Thermal Systems Division.
Manager of the International Space Station U.S. National Laboratory The Center for the Advancement of Science in Space National Design Challenge Pilot.
Transition to 6-person crew ASE conference, Praha Oct 8, 2009 Andreas Schön, ESA All dates used in this presentation are examples only, they do not necessarily.
1 SpaceX proprietary data constituting “Confidential Information” under applicable agreements. Tim Hughes Vice President & Chief Counsel.
1 Commercial Crew Program The Next Step in U.S. Space Transportation Brent W. Jett October 11, 2012 Commercial Crew Program - Same Crew…New Ride.
Suborbital Experiment Platform Presented to National Council of Space Grant Directors Executive Committee October 30, 2007 James E. Ball Spaceport Development.
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
National Aeronautics and Space Administration Lyndon B. Johnson Space Center ISS Payloads Office Utilization / Research Cargo Familiarization April 2005.
The final Space Shuttle has landed… Now what??. The Space Shuttle Since 1981, NASA space shuttles have been rocketing from the Florida coast into Earth.
KSC Ground Operations Timeline. KSC CGSE TIM A Technical Interchange Meeting regarding the Cryo Ground Support Equipment was held at KSC November 1 st.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Preliminary Advanced Colloids Experiment – 2.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama BRIC-17 TIR Overview Aug 28, 2012 Tony Cox EO20.
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR Overview Charts August.
Rodent Research-1 POIWG #35 Splinter. ARC Rodent Research (RR) Points of Contact Mission Overview On-orbit Operations Rodent Research Flight Rules Off-Nominal.
Introduction to Payload Planning Will Kirby (256)
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
1 POIWG #38, July 2015 POIWG #38, July 2015 BIOTESC USOC, Switzerland Martin Haag & Jeannine Winkler BIOTESC
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR overview for UBNT.
NanoRacks, LLC Michael D. Johnson (832) Page No. 1 NanoRacks, LLC Cube Lab Cube Lab Ops TIM – Cube Lab Introduction 11/19/2009 Michael D. Johnson.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Cell Bio Tech Demo TIR Overview Aug 28, 2012.
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
Payload Launch Campaign Planning and Expectations Sponsoring Org/Office Code: OZ POIWG Date: July 2015 OZ/Brienne Shkedi SPX4/SPX5 Lead RIM
GRAVI2 POIWG #34, July 24 th 2013 Abdul Basit Mohammad N-USOC-NOT-ABM-028, Abdul Basit Mohammad1.
NON-PROPRIETARY July NASA Ames Research Center ARC ISS Utilization Office Cell Bio Tech Demo Payload Overview POIWG MSFC July 25, 2012.
APEX-04 SpaceX-10 Shawn Stephens – ESC Project Lead Colleen Huber – TOSC Project Lead.
November 29, Frankie Jernigan MSG Integration Investigation Operations Lead EO
POIWG#38 ARTE - Thermal Exchange Presenter: Valerio Di Tana (Argotec)
1 INTERNATIONAL SPACE STATION Sally Robinson TIM #1-2 Crew Training Curriculum Development/ PTU Planning Coarsening.
National Aeronautics and Space Administration Fruit Fly Lab – 01 Op TIM Payload Team Kevin Martin Matthew Lera Sharmila Bhattacharya Zhe Lu Ops Lead Crissy.
Microgravity User Support Center (MUSC) Payload Overview POIWG, July Chart 1> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013.
Chip Scale Atomic Clock Contact Info: Captain Ruiz Perez (281) John Merk (617) Paige McClung (281)
Increment 25/26 Cube Lab Ops TIR Overview Oct. 6, 2010 Four* new Modules (3 Aluminum Modules, 1 LMA pack) MSFC Ops Lead: Andrea Wade,
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Cindy Grant SPACE-X & Orbital Lead POD Office/EO
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
CBSE Cold Stowage Hardware Overview William Crysel UAB/CBSE
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Delta Training Strategy.
National Goals and Objectives
The International Space Station (ISS)
LSG Capabilities LSG nomenclature: WV - Work Volume AL - Air Lock
International Space Station Providers
Series 5300 Lithium Cell Formation System
Presentation transcript:

CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1

Overview CPCG-HM Objectives Hardware Overview Launch/Landing Scenarios Flight Operations Pre-Flight/Post-Flight Processing 2

CPCG-HM Overview What is CPCG-HM (Commercial Protein Crystal Growth-High Density Modified)? – NLO (National Laboratory Office) investigation to clearly demonstrate the scientific and commercial value for protein crystallization on a long-duration microgravity mission – Samples will be high-value proteins whose structures can not be determined through terrestrial methods – Will consist of over 2,000 investigations of up to 100 different protein complexes – Will require continuous power during all mission phases in order to maintain stable thermal environment for protein samples 3

MERLIN Hardware Overview Microgravity Experiment Research Locker Incubator (MERLIN) Features Advanced Single Middeck Locker Incubator / Freezer / Refrigerator (Heat exchanger designed for both rear-air (AAA) or ISS water loop (MTL) heat rejection) Provides thermal control for temperature sensitive items from approximately -20 o C to o C on ISS Interfaces to Dragon and ISS EXPRESS rack Supports Crew Galley Operations and Cold Stowage Science Operations Currently (3) MERLINs on ISS – (2) MERLINs utilized for galley stowage needs – (1) MERLIN utilized as backup for science stowage Crew Activities – Setup in ER and Dragon Flight History STS-118 (Shuttle-sortie) STS-123 (Shuttle-sortie) STS-126 (Shuttle-ISS) STS-131 (Shuttle-sortie) STS-133 (Shuttle-ISS) STS-135 (Shuttle-ISS) 4

CPCG-HM: Hardware Description EXPRESS Rack payload consisting of two MERLINs (in ER1 and ER7) with set-point temperatures of 4⁰C and 22⁰C Each MERLIN will contain a combination of PCG Experiments – High Density Protein Crystal Growth (HDPCG) Trays containing vapor diffusion investigations in Growth Cell Assemblies – Tray containing Protein Crystal Growth (PCG) Straws for liquid/liquid experiments Liquid/Liquid Experiments Vapor Diffusion Experiments 5

HDPCG Hardware Overview 4 tray- structure previously flown inside CRIM-M – Later upgraded structure to fit MERLIN; project was cancelled post Columbia (no flights inside MERLIN) Accommodates up to 1008 Vapor Diffusion Experiments – 4 Tray Assemblies per MERLIN – 42 Growth Cells per Tray – 6 Samples per Growth Cells Design allows for multiple PI teams in 1 system Shuttle Middeck and ISS-EXPRESS Certified – 4 flight trays, 4 ground trays available for use Simple Crew Activation and Deactivation HDPCG Hardware Flight History Inside CRIM-M – STS-100 to STS-105 (Increments 2-3) – STS-110 to STS-111 (Increments 4-5) – STS-107 (Shuttle) 6

Flown on Soyuz and ISS Russian Module to house Liquid/Liquid PCG experiments Passive Aerogel insulated container that maintains proteins within Tygon Tubing in frozen state until µg is reached Design new structure (in tray format) to provide same thermal insulation but will fit footprint of existing HDPCG tray structure Liquid-to-Liquid Samples (Tygon tubing with crimped ends) Sample Transport Container (STC) Overview 7

Hardware Modifications to Accommodate both PCG Experiment Types Remove 2 center trays from existing HDPCG Tray structure Replace with new insulated tray design (similar to STC) to contain liquid/liquid experiments Final Design – 2 HDPCG trays for Vapor Diffusion samples – 1 passive insulated tray for Liquid/Liquid samples – Accommodate 504 vapor diffusion experiments and 1200 Liquid/Liquid experiments per MERLIN

Launch/Landing Scenario Launch on SpX-3 (Increment 36) – Late Stow (L-24 hr for installation or later) Land on SpX-4 (Increment 37) – Early retrieval (R + 28 to 32 hrs) Powered launch, powered landing – limited on Dragon (75W each unit) Launch scrub turn-around scenarios supported by SpaceX to replace samples in event of extended launch delays Support launch delay of 48 hrs 9

On-Orbit Operations Power transfer from Dragon to ISS EXPRESS Rack – 30 minute power off limit – 1 hr 30 min crew time for transfer, set-up, and activation of both MERLINs ER Prep- Establish power and data cable connections first Remove from mounting configuration in Dragon Power down MERLINs, transfer to ER Cable connections, power-up Mount to ER Sample activation – Operate in continuously powered ER (AAA Cooling), 1 Set of MTL fluid lines on orbit if necessary 10

On-Orbit Operations Power transfer from ISS EXPRESS Rack to Dragon – 30 minute power off limit – 1 hr 30 min crew time for deactivate, transfer, and Dragon Install both MERLINs Sample deactivation Remove from mounting configuration in ER Power down, transfer to Dragon Cable connections, power-up Mount to Dragon Cargo Panel 11

Operations- Crew Activities HDPCG Tray Actuation Handle Growth Position (ACTIVATED) Landing Position (DEACTIVATED) Launch Position Chromex Barrier PPT Reservoir Protein Insert Using an Actuation Handle that attaches to the tray structure At launch, the Cell Block Assemblies will be in the “Launch” position After being mounted in ER- “Activate” (growth) position Prior to removal from ER-”Deactivate” position 12

Flight Operations Weekly 2 hour command/downlink operations Anticipated Flight Rules, P/L Regulations, and Ground Rules & Constraints – Rear mounting captive fastener torque cycle limit (5) – Power loss time limit (30 min) – Twice daily crew status checks during extended LOS of 24 H or longer 13

Pre-Flight Processing – Liquid-to-liquid samples loaded by PI and frozen (weeks to months prior to launch) – Ship hardware and samples to launch processing site – Offline processing at launch processing facility Configure hardware per flight specific configuration Load vapor diffusion experiments Hardware assembly Final ADP closeout (Verification, safety) Turnover to NASA and/or SpaceX reps (T/O time TBD) Installation into vehicle 14

Post Flight Processing Timeline Return Events for Early Access Cargo 15 Search and recovery operations 5 hrs Early access retrieval 1 hrLoading on fast boat for return 1 hrFast boat return to port ~ 21 hrsExpected turnover to NASA rep then PD R + 28 hrsEstimated hardware return to UAB R + 40 hrs

CPCG-HM Notes of Interest The PCG hardware inside the MERLIN is passive – Primary interface to the crew and vehicles is the MERLIN system To streamline cost and expedite integration data products, we will use existing MERLIN products when possible The CPCG-HM hardware will be designated as MERLIN4 and MERLIN5 for command and data handling inputs as well as for EXPRESS Rack Laptop Application Software --There are no changes to the MERLIN software required to support this experiment hardware The CPCG-HM experiment is a stand alone assembly flown under the National Lab Office 16