I NDUSTRIAL W ASTEWATER P ERMITS 2016 E NVIRONMENTAL T RADE F AIR S HANNON G IBSON E NVIRONMENTAL P ERMIT S PECIALIST (512) 239-4284.

Slides:



Advertisements
Similar presentations
What are TMDLs? and What Might They Mean to MS4 Permittees?
Advertisements

Module 6 Effluent Monitoring and Receiving Water Monitoring.
Water Quality Standards and MS4 Storm Water Permitting.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
Discharge Monitoring Reports (DMRs)
National Pollutant Discharge Elimination System -NPDES Permit Process-
IDEM TMDL 101 Everything you wanted to know about Total Maximum Daily Loads.
An Introduction To The Use Of Modeling of Surface Waters For TPDES Permits Mark A. Rudolph, P.E. WQ Modeler, TCEQ WQ Division.
DID YOU KNOW? – Cuyahoga River on Fire in Cleveland, Ohio – Raw wastewater spewed in the San Francisco Bay – City of Columbia Discharged Raw Wastewater.
Kara Denney Industrial Wastewater Permit Writer Water Quality Division.
1 Module 6 Effluent Monitoring and Receiving Water Monitoring Seattle, Washington April 24-25, 2012.
CENTRALIZED WASTE TREATMENT 40 CFR 437 Lessons Learned.
6 th Edition CCCWP Management Committee February 15, 2012.
WQBELs Karen Holligan May 6, WQBELs – A Four-Piece Puzzle Numerical criteria (toxic pollutants) Water body quality Effluent fraction Bioavailable.
EDMR Electronic data submittal system Jeffrey A. Ewick, Section Chief Data and Information Services Section Electronic Discharge Monitoring Report.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Where to find Information About Facilities. Overview of Title V Permits.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
Planning Processes/Permits “From Pre-application meeting to Board of Aldermen Approval.” “From Pre-application meeting to Board of Aldermen Approval.”
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Implementation Procedures (IPs) Brittany Lee Standards Implementation Team
How do 210 Water Reuse Authorizations relate to O&G Development? Jaya Zyman-Ponebshek, P.E. Assistant Director Water Quality Division.
SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER TREATMENT WORKS GARY SOLDANO, P.E. SOUTHEAST REGIONAL OFFICE SUPERVISOR TECHNICAL SERVICES UNIT.
Presented to Georgia Airports Association Conference October 21, 2009 EPA Spill Prevention Control and Countermeasures – Update Also – What’s Coming with.
R ESIDENTIAL P LACEMENT A PPLICATION /25/
1 Public Involvement, Access, and Petitions DJ Law EPA Region 8.
NPDES Wastewater Permitting Update 2015 NCMA Workshop Tom Belnick DWR/NPDES Permitting.
Eric Agnew Environmental Regulations February 15, 2006.
Report of the NPDES Subcommittee. Conference Call Meetings July 8 and August 19 Mercury Discharges – Utility Request to Address Permit Requirements for.
TIP D EVELOPMENT Swinomish Tribe and Open Burning Provisions Scott Andrews Swinomish Tribe.
Biosolids Annual Report A Step by Step Guide to Submittal.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Procedures to Implement the Texas Surface Water Quality Standards
1 Industrial Waste Data Tracking: Surveys & Other Information Collection Presented by: Melissa Reboul LDEQ Pretreatment MODULE 3.
1 US EPA Straw Proposals for Modifying the 12/2005 draft Policy Statement Jim Hanlon, Director Office of Wastewater Management, OW Expanded Steering Committee.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
Changes to Contested Case Hearing Requirements and Procedures Janis Hudson Environmental Law Division Texas Commission on Environmental Quality Advanced.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
The Rezoning Process CHARLOTTE-MECKLENBURG PLANNING.
WQBELs Karen Holligan September 23, WQBELs – A Four-Piece Puzzle Numerical criteria (toxic pollutants) Water body quality Effluent fraction Bioavailable.
Revisions to: The Procedures to Implement the Surface Water Quality Standards Mrs. Brittany M. Lee Standards Implementation Team Phone:
HB 2031 and HB 4097: Marine Seawater Desalination Rulemaking Trade Fair / May 2016 Office of Water Water Availability Division Water Quality Division.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
permitting.
P ESTICIDE NPDES P ERMIT – D O Y OU N EED O NE ? Darin LeCrone & Leslie Lowry Illinois Environmental Protection Agency.
Aggregate Advisory Board
Mining and Reclamation Advisory Board
Industrial Wastewater Permits
NRC Export and Import Licensing 10 CFR Part 110
Industrial and Hazardous Waste Easier, Better, Faster Permitting
Dennis Stottlemyer WVDEP DMR Mitigation Coordinator
5 Steps to file your objections/ suggestions on KUDA Master Plan 2041
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
John Tinger U.S. EPA Region IX
Clean Water Act (CWA) Purpose
Spencer Bohaboy Policy Development Specialist Water Quality Policy
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
North Carolina Division of Water Resources
Bianca Cooper & David James May 17, 2017 Water Quality Division
2018 Environmental Trade Fair
Industrial Wastewater Permits
TCEQ Environmental Trade Fair Water Quality Division
Municipal Wastewater Permits
Multi-Sector General Permit: MSGP
Update on Whole Effluent Toxicity (WET)
INDUSTRIAL WASTEWATER PERMITS
EPA’S ROLE IN APPROVING BASIN PLAN AMENDMENTS
Municipal Wastewater Permits
Presentation transcript:

I NDUSTRIAL W ASTEWATER P ERMITS 2016 E NVIRONMENTAL T RADE F AIR S HANNON G IBSON E NVIRONMENTAL P ERMIT S PECIALIST (512)

O VERVIEW W HO NEEDS A PERMIT P ROCESSING T IPS FOR C OMPLETING THE APPLICATION

P URSUANT TO THE T EXAS W ATER C ODE §26.121: F ACILITIES ( MOBILE OR STATIONARY ) CANNOT DISCHARGE WASTEWATER INTO OR ADJACENT TO ANY WATER IN THE STATE WITHOUT APPROPRIATE AUTHORIZATION. T YPES OF P ERMITS I NDIVIDUAL AUTHORIZATIONS FOR DIRECT DISCHARGES AND LAND APPLICATION G ENERAL PERMITS P ERMITS BY R ULE W HO NEEDS A PERMIT

Q UESTIONS ? N EED HELP ? C ALL THE TCEQ AT (512) AND SPEAK WITH AN INDUSTRIAL PERMIT WRITER C ALL THE SMALL BUSINESS AND LOCAL GOVERNMENT ASSISTANCE HOTLINE AT (800) W HO NEEDS A PERMIT

P ROCESSING THE APPLICATION A PPLICATION P ROCESSING T IMEFRAMES T HE P ERMITTING P ROCESS

A PPLICATION P ROCESSING T IMEFRAMES N EW A PPLICATION – 330 DAYS M AJOR A MENDMENT M AJOR F ACILITIES – 330 D AYS M INOR F ACILITIES – 300 D AYS R ENEWAL M AJOR F ACILITIES – 330 D AYS M INOR F ACILITIES – 300 D AYS

A PPLICATION P ROCESSING T IMEFRAMES T IMEFRAMES MAY BE EXTENDED IF : EPA ISSUES OBJECTIONS TO THE DRAFT PERMIT TCEQ RECEIVES REQUEST ( S ) FOR A PUBLIC MEETING OR CONTESTED CASE HEARING

T HE P ERMITTING P ROCESS A DMINISTRATIVE R EVIEW 1 ST P UBLIC N OTICE – NORI ( PUBLIC COMMENTS ) T ECHNICAL R EVIEW P ERMIT DEVELOPMENT 2 ND P UBLIC N OTICE - NAPD ( PUBLIC COMMENTS ) (EPA REVIEW / OBJECTIONS ) (P UBLIC M EETING / C ONTESTED C ASE H EARING ) A GENCY D ECISION – ISSUANCE OR DENIAL OF PERMIT

A DMINISTRATIVE R EVIEW A DMINISTRATIVE REPORT A PPLICATION CONTACT AND SITE INFORMATION N OTICE INFORMATION L ANDOWNER INFORMATION R ESPOND PROMPTLY TO REQUESTS FOR ADDITIONAL INFORMATION. D ELAYING YOUR RESPONSE DELAYS YOUR PERMIT.

1 ST P UBLIC N OTICE - NORI NORI – N OTICE OF R ECEIPT OF A PPLICATION AND I NTENT TO O BTAIN A W ATER Q UALITY P ERMIT M AILED TO APPLICANT FOR PUBLICATION AFTER THE APPLICATION IS DEEMED ‘A DMINISTRATIVELY C OMPLETE ’ P UBLISH PROMPTLY AND RETURN DOCUMENTATION TO THE C HIEF C LERK ’ S O FFICE (CCO) A DRAFT PERMIT CANNOT BE FILED WITH THE CCO IF THE NORI P ROCESS IS INCOMPLETE DELAYS IN PUBLICATION OR DOCUMENT SUBMITTAL DELAYS YOUR PERMIT

T ECHNICAL R EVIEW W ATER Q UALITY S TANDARDS U SES AND CRITERIA A NTI - DEGRADATION E NDANGERED S PECIES C RITICAL C ONDITIONS C RITICAL FLOWS OR MIXING CONDITIONS M IXING Z ONE DEFINITION

T ECHNICAL R EVIEW D ISSOLVED O XYGEN (DO) M ODELING I MPACT OF DISCHARGE ( S ) ON DO OF RECEIVING WATER ( S ) W ATER BODY IMPAIRMENTS C OMPLETED TOTAL MAXIMUM DAILY LOADS (TMDL S ) B IOMONITORING W HOLE EFFLUENT TOXICITY (WET) TESTING OR LIMITS S PECIES, F REQUENCY, DILUTIONS

T ECHNICAL R EVIEW A GRONOMY C ROPS S OIL TESTING H YDROGEOLOGY P OND LINER REQUIREMENTS B UFFER ZONES G ROUNDWATER M ONITORING

P ERMIT D EVELOPMENT D ATA COMPLETENESS REVIEW C OMPLIANCE HISTORY S ELF - REPORTED EFFLUENT DATA (DMR S ) T ECHNOLOGY - BASED EFFLUENT LIMITATIONS W ATER QUALITY - BASED EFFLUENT LIMITATIONS F INAL EFFLUENT LIMITATIONS M OST STRINGENT OF TECH - BASED, WATER QUALITY - BASED, AND EXISTING PERMIT LIMITATIONS

P ERMIT D EVELOPMENT - R EVIEWS T EAM L EADER A PPLICANT (L EGAL ) (O THER TECHNICAL STAFF )

2 ND P UBLIC N OTICE - NAPD NAPD– N OTICE OF A PPLICATION AND P RELIMINARY D ECISION M AILED TO APPLICANT FOR PUBLICATION AFTER THE DRAFT PERMIT IS ACCEPTED BY THE APPLICANT P UBLISH PROMPTLY AND RETURN DOCUMENTATION TO THE CCO DELAYS IN PUBLICATION OR DOCUMENT SUBMITTAL DELAYS YOUR PERMIT I F PUBLIC COMMENTS ARE RECEIVED, THE PERMIT WRITER AND LEGAL PREPARE A R ESPONSE TO C OMMENTS DOCUMENT

EPA R EVIEW EPA REVIEWS THE DRAFT PERMIT A PPROVAL O BJECTION ISSUED T HE PERMIT WRITER RESPONDS TO ANY OBJECTIONS RECEIVED FROM EPA C LARIFICATION P ERMIT REVISION

P UBLIC M EETING R EQUESTS AND C ONTESTED C ASE H EARINGS I F A PUBLIC MEETING IS HELD, THE COMMENT PERIOD IS TYPICALLY EXTENDED TO THE END OF THE MEETING R EQUEST ( S ) FOR CONTESTED CASE HEARINGS – GRANTED OR DENIED

A GENCY D ECISION I SSUANCE D ENIAL

F ORMS AND I NSTRUCTIONS A PPLICATION FORMS AND INSTRUCTIONS, PLUS ADDITIONAL INFORMATION SUCH AS THE S PANISH LANGUAGE NOTICE TEMPLATES, ARE AVAILABLE AT THE FOLLOWING TCEQ WEBSITE : _wastewater_steps.html NOTE: U PDATED FORMS WERE PUBLISHED TO THE TCEQ WEBSITE M ARCH 2016.

R EAD THE INSTRUCTIONS (!) S TILL NOT SURE HOW TO FILL OUT A PART OF THE APPLICATION ? C ALL THE W ATER Q UALITY D IVISION AT (512) AND ASK TO SPEAK WITH AN INDUSTRIAL PERMIT WRITER D O NOT LEAVE ANY ITEMS OR QUESTIONS BLANK E NTER “N/A” IF NOT APPLICABLE P ROVIDE COMPLETE INFORMATION EACH TIME YOU SUBMIT AN INDUSTRIAL WASTEWATER PERMIT APPLICATION Y ES, EVEN FOR RENEWALS. C OMPLETING THE APPLICATION FOR A PERMIT

T IPS FOR C OMPLETING THE T ECHNICAL R EPORT I TEM 1 – W ASTEWATER G ENERATION D ESCRIBE ALL PROCESSES THAT GENERATE WASTEWATER I NCLUDE LEGIBLE FACILITY MAPS AND DIAGRAMS I TEM 2 - T REATMENT D ESCRIBE TREATMENT SYSTEMS, IF ANY. E RR ON THE SIDE OF TOO MUCH DETAIL I NCLUDE THE FLOW SCHEMATIC WITH A WATER BALANCE

T IPS FOR C OMPLETING THE T ECHNICAL R EPORT I TEM 3 - I MPOUNDMENTS L INER TYPE S TORAGE VOLUME S URFACE AREA C OMPLIANCE WITH 40 CFR P ART 257, S UBPART D?

T IPS FOR C OMPLETING THE T ECHNICAL R EPORT I TEM 4 – O UTFALLS L IST ALL CONTRIBUTING WASTE STREAMS I NCLUDE VOLUMES OF ALL WASTE STREAMS, EVEN IF THEY ARE VERY SMALL I NCLUDE % OF TOTAL FLOW VOLUME OF EACH WASTE STREAM S UM OF PERCENTAGES MUST EQUAL 100% M AKE SURE THE INFORMATION IN THE TABLE IS CONSISTENT WITH THE FLOW SCHEMATIC / WATER BALANCE

T IPS FOR C OMPLETING THE T ECHNICAL R EPORT I TEM 4 C ONT. - O UTFALLS NOTE: L OW - VOLUME WASTE SOURCES MAY NOT INCLUDE WASTESTREAMS FROM THE FOLLOWING PROCESSES : C OMBUSTION RESIDUAL LEACHATE F LUE GAS DESULFURIZATION F LUE GAS MERCURY CONTROL, OR G ASIFICATION.

T IPS FOR C OMPLETING THE T ECHNICAL R EPORT I TEMS 12 THRU 14 – A MENDMENT AND M ODIFICATION R EQUESTS T RY TO INCLUDE ALL AMENDMENT OR MODIFICATION REQUESTS UPFRONT ** N OT INCLUDING ALL REQUESTS UPFRONT CAN DELAY PROCESSING ** C LEARLY EXPLAIN ALL AMENDMENT OR MODIFICATION REQUESTS Q UESTIONS ABOUT AN AMENDMENT OR MODIFICATION ? C ALL AN INDUSTRIAL PERMIT WRITER AT (512) R EQUEST A PRE - APPLICATION MEETING

T IPS FOR C OMPLETING THE T ECHNICAL R EPORT W ORKSHEET 2.0 – P OLLUTANT A NALYSIS PLAN AHEAD! B EGIN SAMPLING AND ANALYZING EFFLUENT SO THAT ALL REQUIRED DATA CAN BE SUBMITTED WITH THE APPLICATION. A PPLICATIONS ARE NO LONGER PROCESSED WITHOUT ANALYTICAL DATA. E XCEPTIONS : N EW FACILITIES F ACILITIES WITH NO DISCHARGES DUE TO DROUGHT OR OTHER CIRCUMSTANCES

T IPS FOR C OMPLETING THE T ECHNICAL R EPORT

W ORKSHEETS 3.0 THRU 3.3 – T EXAS L AND A PPLICATION P ERMITS (TLAP S ) W ATER B ALANCE N EEDED TO CALCULATE ALLOWABLE LAND APPLICATION RATES AND STORAGE VOLUMES ( WHEN STORAGE IS REQUIRED ) I NFORMATION NEEDED FOR LAND APP : C URVE NUMBER (CN) E FFLUENT CONDUCTIVITY (C E ) M AXIMUM ALLOWABLE CONDUCTIVITY OF SOIL SOLUTION (CL) I RRIGATION EFFICIENCY (K)

T IPS FOR C OMPLETING THE T ECHNICAL R EPORT W ORKSHEET 11.0 – C OOLING W ATER I NTAKE S TRUCTURES C OMPLETE THIS WORKSHEET IF THE FACILITY USES WATER FOR COOLING PURPOSES. T HIS INCLUDES ALL FACILITIES REGARDLESS OF : THE COOLING SYSTEM TYPE METHODS USED TO OBTAIN COOLING WATER S OURCE WATER

M ORE I NFORMATION N EEDED ? TCEQ I NDUSTRIAL P ERMITS T EAM : (512) TCEQ W EBSITE : Q UESTIONS ? S HANNON G IBSON E NVIRONMENTAL P ERMIT S PECIALIST (512)