Virtual Track Surveying Paul Furniss. An introduction to Omnicom Engineering A few words from Gary Sanford the UK Sponsor What is the OmniSurveyor3D System?

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Components of GIS.
Share with Pride Train Mounted Laser Survey of Birmingham New Street Area Resignalling Phase 7. Neil Archer – Signalling Innovations Group Rob Dutton -
Mobile Resource Manager v2. Core Pillars  Engine - High fuel costs, vehicle maintenance  Productivity - Customers expect increasing levels of service.
Springfield Public Schools 1 Project Management Methodologies in Support of Student Achievement.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
ICASAS305A Provide Advice to Clients
Scandpower AS P.O. Box 3, N-2027 Kjeller, Norway Risk management in the Scandinavian railway industry Karl Ove Ingebrigtsen Vice president Sweden Norway.
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 8 - Contractual Relationships.
JOB ANALYSIS AND HUMAN RESOURCE PLANNING
Introduction to Systems Analysis and Design
Deriving Performance Metrics From Project Plans to Provide KPIs for Management Information Primavera SIG October 2013.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
1.
Software Developer Career. ◦ Desktop Program development ◦ Web Program Development ◦ Mobile Program Development.
Release & Deployment ITIL Version 3
Learning with a Purpose: Learning Management Systems Patti Holub, Director District Initiatives and Special Projects Miguel Guhlin, Director Instructional.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
AGENDA Welcome and introductions Brief introduction to PSI Mobile Technical Overview Demonstration Q and A Next Actions.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Roles and Responsibilities
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design.
Project ManagementDay 1 in the pm Project Management (PM) Structures.
Human and Institutional Capacity Development Project in Rwanda (HICD-R) CORE TEAM KM WORKSHOP February 26, 2015 Delivered by Courtney Roberts.
Data Warehousing for the Reporting and Management of Clinical Data Robert Ellison, ICON CLINICAL Research Plc.
1 Process Engineering A Systems Approach to Process Improvement Jeffrey L. Dutton Jacobs Sverdrup Advanced Systems Group Engineering Performance Improvement.
INFORMATION SYSTEMS Overview
Director of Evaluation and Accountability Manager, UW’s Grand Rapids, Michigan Robert McKown, CIRS Director of Evaluation and Accountability Sherri.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
ICT development office ICT research, planning and training dept. Network development and administration dept. System development and operation dept. President.
Business Process Change and Discrete-Event Simulation: Bridging the Gap Vlatka Hlupic Brunel University Centre for Re-engineering Business Processes (REBUS)
Supporting Industry Change Planning: Risk & Milestone Assessment Process & Tools 07/07/2014.
IT Governance: COBIT, ISO17799 & ITIL. Introduction COBIT ITIL ISO17799Others.
Session III. Information Systems A system, whether automated or manual, that comprises people, machines, and/or methods organized to collect, process,
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
Chapter 11 Managing Application Development. Agenda Application management framework Application management issues Criteria for development approach Development.
DOE ASSET MANAGEMENT PLAN
NACE Affiliates 100 % Affiliates EDC2 – LPA Initiative MAP-21 TZD.
Corporate Services Restructuring 31 March Introduction  The AG completed the restructuring of Corporate Services in November 2005  The restructuring.
State of Georgia Release Management Training
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Welcome to Laubrass INC. CREATORS OF UMT PRODUCS.
Minimising IT costs, maximising operational efficiency IO and NIMM: Now is the time Glyn Knaresborough Director of Strategic Consulting.
ITIL® Service Asset & Configuration Management Foundations Service Transition Thatcher Deane 02/17/2010.
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
ISO50001 in Practice Michael Clancy FDT Consulting Engineers & Project Managers.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
EECS David C. Chan1 Computer Security Management Session 1 How IT Affects Risks and Assurance.
Advanced Software Engineering Dr. Cheng
Software Project Configuration Management
BUSINESS DRIVEN TECHNOLOGY
Software Requirements
Increasing Asset Lifecycle through the application of Innovative Technology
Developing an Existing Piping Assets Traceability & Tracking Strategy
Asset Governance – Integrated Strategic Asset Management
Integrating technology into an aging infrastructure
Tools of Software Development
Rob Cotterill & Helen Jones DNV Consulting, UK
E-business systems E-business not a synonymous with e-commerce. E-business a wider concept.
Enterprise Program Management Office
CEng progression through the IOM3
Presentation transcript:

Virtual Track Surveying Paul Furniss

An introduction to Omnicom Engineering A few words from Gary Sanford the UK Sponsor What is the OmniSurveyor3D System? Software demonstration What does OmniSurveyor3D provide? Established technology Examples of supporters Summary

Omnicom Engineering Virtual Track Surveying UK Virtual track surveying has become increasingly central to data accuracy in the UK using OmniSurveyor3D. Omnicom Engineering is the highly innovative software engineering company that has developed OmniSurveyor3D that provides solutions for locating, maintaining and managing assets which delivers business operation efficiency. “Solutions on the Move”

End user software provides an easy interface with the data for a multitude of tasks Unique method for high speed surveying that builds a 3-dimensional image model of all line side infrastructure and track map geometry The survey vehicle –Cameras & Recorders –Positioning System –Industrial Computers –Specialist Software

System Demonstration

Comprehensive Management Tool Success factors for organisations –Strategic Qualification of directed or emergent strategies –Managerial Assessment of procedures based on robust policies –Operational Scheduling and planning of activities and tasks OmniSurveyor3D promotes world class decision making at all levels

System for Quality An accurate managed asset database –It is an efficient method of creating and updating asset data ensuring consistency and completeness –Safest method of obtaining asset data –Structured and standard way of collecting and manipulating the information –Ability to import and export easily to other systems Unique measuring tool for track surveying Extensive functionality for many other uses including visual representation of analysis data

Pictures and a 1000 words Visual information improving communication –Greater level of interface by the organisation with the infrastructure it is managing and/or maintaining –Increased knowledge of assets and their environments –Reduced geographic associated survey costs –Enabling proactive analysis of the network –A ‘real life’ dimension to complex databases

A Growing List of Uses Other uses for the OmniSurveyor3D data –Virtual inspection and gauging technologies –Route knowledge – driver training –Qualification of changing or new standards –Holistic project planning and implementation activities –Real time train positioning system –Research tool for internal and external organisation inquiries and information gathering exercises –Powerful consultation aid when dealing with any infrastructure stakeholders

UK Railway Surveys Surveyed 3200 km of the WCML in Feb 2000 Surveyed km between Sept 2000 and Oct 2001 Surveyed km between April 2002 and Dec 2002 Started new survey in April 2003 as part of an on-going three year survey

Users Comments West Coast Mail Line Upgrade –Andy Fordyce, Data Acquisition and Delivery Project Manager, Railtrack. “It has enabled us to check track condition, locating areas such as wet spots, as well as checking locations for positioning of new equipment and planning for maintenance work including locating positions of safety and familiarising teams with work areas.” –Nigel Trotter, Managing Director, Tasque Consultancy. “The use of the Omnicom system enables cost effective identification and screening of railway infrastructure items, this exercise could not have been safely carried out in the timescales required without the use of this system.”

Summary World Class Solution Delivering –Strategically and operationally the most efficient, cost effective and safe asset data solution for greater business performance –An accurate asset database that is easily manageable –Substantial reduction for infrastructure surveys –Considerably improved knowledge of assets & their environment –A permanent and repeatable record of the infrastructure –An effective decision, communication, and management tool It has become –An important component of asset knowledge in UK rail industry “It’s not just limited to being an asset directory….it seems like every time I show this product to someone they have another way of using it”. Gary Sanford Network Rail

Virtual Track Surveying