CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.

Slides:



Advertisements
Similar presentations
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Advertisements

February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Integration study of dipole corrector (for the MB Quad of CLIC Module) A.Samoshkin, M. Modena (CTC, 06-Apr-2010) 1.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
Summary of Collaboration “EOI’s” for the CLIC technical developments HS for CTC.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
Question 25: Delineate the R&D program remaining before a technical design review (TDR) and full cost estimate can be prepared. What are the major projects.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
CLIC cost & power consumption issues Philippe Lebrun on behalf of the C&S WG CLIC Meeting 11 December 2009.
Fermilab February 1, 2007 J. Tompkins -1- Comments on the EDR and Magnet Systems JCT for the Magnet Systems Group
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
CLIC cost drivers Philippe Lebrun on behalf of the C&S WG CLIC Technical Committee 3 November 2009.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Work-packages CLIC for the Drive Beam BJ, 23 feb 2010 Beam Dyn Meeting 2/23/11Beam Dyn meeting1.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
Emittances Normalised r.m.s. Emittances at Damping Ring Extraction Horizontal Emittance (  m) Vertical Emittance (  m)
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
Introdcution to Workpackage/Activity Reflection D. Schulte.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
FP7: EuCARD after a year of preparation… A.Jeremie.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Emittance reduction by a SC wiggler in the ATF-DR September 16 th, 2009 Yannis PAPAPHILIPPOU and Rogelio TOMAS ATF2 weekly meeting.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
Work packages : Overview of experimental verification, CTF3 and CLIC Zero R. Corsini for the CLIC/CTF3 Collaboration Basically all WP scientific and.
Summary of Session: Magnets and undulators for light sources 2
contribution to the round table discussion
Work-packages for , detailed description
Thermal review of CLIC module
CLIC Damping ring beam transfer systems
M.Jonker CTC MPO-WG status
Work-packages for , planning and status
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
LCWS 2017 – 26th October C. Rossi
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
CLIC Beam Instrumentation
Thermal test (lab modules)
CLIC damping rings working plan towards the CDR
Status of CTC activities for the Damping rings
Presentation transcript:

CTC Work Packages ver 2.1 HS for CTC

CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental test program at ANKA CTC-002AlignmentTunnel metrology Active mechanical pre-alignment Specific Active pre-alignment of MDI CTC-003Quadrupole StabilityStabilization Technologies Application to MB quadrupole Application to FF quadrupoles CTC-004TBA modulesPrototype design and fabrication Modelization Experimental comparison of predicted and modeled performance Alternative designs Industrialization CTC-005Warm Magnet prototypesNormal conducting Compact Magnet Design Permanent magnet High Gradient Quadrupole Design Powering Schemes Rad hard trimmers for strength CTC-006Beam InstrumentationRefinement of specifications BPM designs Emittance Measurements Beam loss Monitoring Overview CTC Work Packages (1/3)

CTC-007MDI activitiesDetailed Studies Experimental work/Prototyping CTC-008Post Collision lines and Beam DumpsPost Collision line design Water dump design Detailed studies/design of MB dump Detailed studies/design of DB dumps/ preparation of CLIC0 CTC-009Machine Protection/Machine OperationStudies and designs Development of a Machine Model Experimental work Definition of Operational Scenario CTC-010Civil EngineeringStudies Designs Layouts CTC-011ControlsFs-Timing system master clock Fs-Timing system site distribution Integrated TBA module acquisition system CTC-012RF systemsdevelopment of DB power source. Design of DB linac low level Rf systems prototype of DR Rf system CTC-013PoweringDesigns Modulators for DB klystrons Overview CTC Work Packages (2/3)

CTC-014Vacuum Systems CTC-015Magnetic Stray fields CTC-016BT equipmentDR extraction kickers Overview CTC Work Packages (3/3)

CTC-001 DR SC wiggler To be ready for beam in ANKA in the year 2012 this program will need a temporary loan of a PM wiggler for ANKA (CERN charge to find one)

CTC-002 Survey and Alignment

CTC-003 Quad stability

CTC-004 two-beam module development CLIC Linkperson: G. Riddone

CTC-004 two-beam module development Other comments: total modules considered for construction: (see task 1); All deliverables for modules (Alignment, Stabilization, BI, vacuum, RF structures etc) paid by TBA module budget.

WP: CTC-005 Warm Magnet Prototypes

CTC-006 Beam Instrumentation-task1

CTC-006 beam instrumentation -task2

CTC-006-beam instrumentation task3 (1/2)

CTC-006-beam instrumentation task3 (2/2)

CTC-006-beaminstrumentation-task4

WP: CTC-07 MDI activities

WP: CTC-008 Beams disposal (post collision line and dumps)

WP: CTC-009 MP-OP Time 18 ms; post pulse analysis; confirms OK 2 ms: Machine save by construction

WP: CTC-010 Civil Engineering and Services (CES) Other comments: *Material Budget is for external consultancy services (e.g. geologist, environmental experts, design engineers, architects) **Personnel inside CERN will come from several departments, but mainly GS&EN. This staffing estimate needs to be discussed other departments.

WP: CTC-011 Controls

WP: CTC-012 RF systems

WP: CTC-013 powering

WP: CTC-014 vacuum systems Needs completion

WP: CTC-015 Magnetic Stray fields Measurements

CTC-016 DR Extraction System (1/2) Other comments: The importance for CERN is: comparison and choice of technologies, validation of prototype in an operational facility. Extremely challenging technical specifications to be demonstrated: possible fallback solutions should also be investigated, including sophisticated control system for droop and ripple cancellation – but manpower and resources are limited.

CTC-016 DR extraction system (2/2) Other comments: The importance for CERN is: optimization of design of striplines for CLIC damping ring (e.g. cross-section, coverage angle, taper, beam pipe dimensions), verification of beam impedance; R&D mainly carried out by collaborators. Prototyping in Spanish industry. Main costs for R&D and manufacture are paid by CDTI, Spain (IDC ): small contribution may be requested from CERN. Extremely challenging technical specifications to be demonstrated. Feedthru Ceramic support

CTC Summary Table