GridCat ITB Service Integration Plan Bockjoo Kim OSG Integration Workshop at UC Feb 15-17, 2005.

Slides:



Advertisements
Similar presentations
CTS Wireless Pilot Status Quarterly Customer Meeting January 22, 2013.
Advertisements

16.1 © 2004 Pearson Education, Inc. Exam Planning, Implementing, and Maintaining a Microsoft® Windows® Server 2003 Active Directory Infrastructure.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
1 of 3 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Robofest 2001 Online Management System Jim Needham MCS 4833/01 Senior Project Dr. Chan-Jin Chung, Ph.D.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
A walkthrough of the SageQuest Mobile Control Online & ESC integration.
Customer Forum OTech’s New Web Publishing Service Web Services Section – April 29, 2015.
EPTO Electronic Paid Time Off System Lora Headdy ePTO & HRMS eDoc System Manager.
1 © 2005 Cisco Systems, Inc. All rights reserved. Cisco Unity Connection 1.x Documentation What you need to know.
WP3 Semivirtual Campus Progress Report Petr Grygarek VSB-CZ.
SPS FPDS-NG Integration: System Administration April 20, 2006.
SC Websites Training of webmasters end of March/ beginning of April Validation of content in April Launching in May/ June (at the end of March, the hosting.
1 Dynamic Application Installation (Case of CMS on OSG) Introduction CMS Software Installation Overview Software Installation Issues Validation Considerations.
OSG Services at Tier2 Centers Rob Gardner University of Chicago WLCG Tier2 Workshop CERN June 12-14, 2006.
Integration and Sites Rob Gardner Area Coordinators Meeting 12/4/08.
OSG Middleware Roadmap Rob Gardner University of Chicago OSG / EGEE Operations Workshop CERN June 19-20, 2006.
The Disk Resource Manager A Berkeley SRM for Disk Cache Implementation and Testing Experience on the OSG Jorge Luis Rodriguez IBP/Grid Mini-Workshop Apr.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
© 2001 Business & Information Systems 2/e1 Chapter 8 Personal Productivity and Problem Solving.
Lead Black Slide Powered by DeSiaMore1. 2 Chapter 8 Personal Productivity and Problem Solving.
ITB Release Process Suchandra Thapa Computation Institute / University of Chicago.
The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
USER MANUAL USER MANUAL 21 June TABLE OF CONTENTS System Description4 How It Works?5 PLUGIN Maxxbooking Plugin6-7 Hotel Info & Description8-9 Availability.
Markle Site Map + Wireframes. FUNCTIONALITY: Links: Spec Section # Page Buttons: page map Program areas -- Public Engagement through Interactive Technologies.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
Open Science Grid OSG CE Quick Install Guide Siddhartha E.S University of Florida.
UMD TIER-3 EXPERIENCES Malina Kirn October 23, 2008 UMD T3 experiences 1.
March 11, 2008 USCMS Tier-2 Workshop Oh Dear God Alain made a PowerPoint presentation 1.
Module 12 Upgrading from Exchange Server 2003 or Exchange Server 2007 to Exchange Server 2010.
OSG Tier 3 support Marco Mambelli - OSG Tier 3 Dan Fraser - OSG Tier 3 liaison Tanya Levshina - OSG.
May 6, 2015 Session 10:00am – 12 Noon. Agenda 2 TopicPresenter / FacilitatorTimeframe  Welcome Michael Chen5 min.  CA Web Publishing Richard Lehman55.
This document contains unpublished confidential and proprietary information of American Express. No disclosure or use of any portion of these materials.
Semi-Automatic patch upgrade kit
Grid Operations Lessons Learned Rob Quick Open Science Grid Operations Center - Indiana University.
Working with Feature Services Gary MacDougall Russell Brennan.
Documentation Workflows D. Olson 13 Mar 2006 DRAFT.
Portal Update Plan Ashok Adiga (512)
OSG Integration Activity Report Rob Gardner Leigh Grundhoefer OSG Technical Meeting UCSD Dec 16, 2004.
Site Validation Session Report Co-Chairs: Piotr Nyczyk, CERN IT/GD Leigh Grundhoefer, IU / OSG Notes from Judy Novak WLCG-OSG-EGEE Workshop CERN, June.
Peter Batchelor & Liddy Nevile - OZeWAI HiSoftware Accessibility Solutions Peter Batchelor & Liddy Nevile
The OSG and Grid Operations Center Rob Quick Open Science Grid Operations Center - Indiana University ATLAS Tier 2-Tier 3 Meeting Bloomington, Indiana.
K. Harrison CERN, 22nd September 2004 GANGA: ADA USER INTERFACE - Ganga release status - Job-Options Editor - Python support for AJDL - Job Builder - Python.
1 CMS Software Installation, Bockjoo Kim, 23 Oct. 2008, T3 Workshop, Fermilab CMS Commissioning and First Data Stan Durkin The Ohio State University for.
Open Science Grid Build a Grid Session Siddhartha E.S University of Florida.
VOX Project Tanya Levshina. 05/17/2004 VOX Project2 Presentation overview Introduction VOX Project VOMRS Concepts Roles Registration flow EDG VOMS Open.
Mardi 8 mars 2016 Status of new features in CIC Portal Latest Release of 22/08/07 Osman Aidel, Hélène Cordier, Cyril L’Orphelin, Gilles Mathieu IN2P3/CNRS.
Feedback from CMS Andrew Lahiff STFC Rutherford Appleton Laboratory Contributions from Christoph Wissing, Bockjoo Kim, Alessandro Degano CernVM Users Workshop.
Tier 3 Support and the OSG US ATLAS Tier2/Tier3 Workshop at UChicago August 20, 2009 Marco Mambelli –
Integration TestBed (iTB) and Operations Provisioning Leigh Grundhoefer.
SRM-DRM ITB Service Integration Plan Jorge Rodriguez OSG Integration Workshop at UC Feb 15-18, 2005.
The Great Migration: From Pacman to RPMs Alain Roy OSG Software Coordinator.
OSG Status and Rob Gardner University of Chicago US ATLAS Tier2 Meeting Harvard University, August 17-18, 2006.
Monitoring and Information Services Core Infrastructure (MIS-CI) Service Description Mark L. Green OSG Integration Workshop at UC Feb 15-17, 2005.
INFSO-RI Enabling Grids for E-sciencE GOCDB Requirements John Gordon, STFC.
WLCG Information System Status Maria Alandes Pradillo, CERN CERN IT Department, Support for Distributed Computing Group GDB 9 th September 2015.
Open Science Grid Configuring RSV OSG Resource & Service Validation Thomas Wang Grid Operations Center (OSG-GOC) Indiana University.
1 Grid2003 Monitoring, Metrics, and Grid Cataloging System Leigh GRUNDHOEFER, Robert QUICK, John HICKS (Indiana University) Robert GARDNER, Marco MAMBELLI,
CD Briefing on Scientific Program Management System (SPMS) and DocDB Thursday, November 18, 2004 Eric Vaandering will speak about DocDB, in particular.
October 2014 HYBRIS ARCHITECTURE & TECHNOLOGY 01 OVERVIEW.
Internet Made Easy! Make sure all your information is always up to date and instantly available to all your clients.
Supporting quality devices
CWMS Installation and Deployment
Dalikoo User Guide.
Rapid Connect® Getting Started
Leigh Grundhoefer Indiana University
[DISCLAIMER] This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation.
Presentation transcript:

GridCat ITB Service Integration Plan Bockjoo Kim OSG Integration Workshop at UC Feb 15-17, 2005

2/15/052 Service Description High level site status catalog Front-end : Status web page with maps Back-end : Uses scripts to update information MySQL Information can be accessed through –Web –MySQL –XML-RPC (gcatc GridCat client)

2/15/053 Installation Uses VDT and MIS infrastructure in sites Service host : Pacman 2 cache for GridCat is to be used: Pacman installation will ask questions on Web server/port, MySQL host/port,VDT client, GridCat operator’s ,

2/15/054 Configuration gridcat.cfg is filled with all the answers –Manual configuration is sometimes necessary Site population(addgridsites.sh) –A list of participating FQDN –Site population script figurs out “ALL” based on the FQDN, VDT, and (MIS). Site name adjustment (gridcat-editmap.sh) –Edit sitename and dot position –US and Asia are the only maps necessary for this.

2/15/055 Test and Validation No tests are yet prepared because of the nature of the service autoconf and installation procedure checks installation requirements After installation/configuration/site population: –List of sites populated in the catalog –Maps with red dots are available and CPU/Disk graphics are not ready yet at this point After back-end scripts completed a cycle –Full information with green/red dots should be visible

2/15/056 Test with Gridcat Client GridCat client is automatically installed during the GridCat installation Use GridCat Client: cd $gridcat source setup.sh gcatc.py --sitenames gcatc.py--hostnames ….

2/15/057 Support and Documentation Main Gridcat web page : Contact (352)

2/15/058 Pending Issues and Next Steps Gridcat uses fork manager for back-end. This should be changed to use MIS jobmanager Session management for different users are implemented. X509 will be used to restrict access to sensitive information Siteadmin can be allowed to correct incorrect information or to announce special downtime announcement, etc.

2/15/059 Pending Issues and Next Steps Next version : –Mixed MIS/fork recognition (OSG compliancy) –Hide sensitive information –Identify who is(are) the site admin(s) Time line –Release OSG-ITB2/10/2005 –Develop OSG Compliancy3/1//2005 –Testing3/8/2005 –OSG Compliant GridCat 0.83/10/2005

2/15/0510 The End