LIBD Meeting on results of 2014 TL tests APERTURE SCANS Jose L. Abelleira for the TL team: R. Alemany-Fernandez, W. Bartmann, C. Bracco, E. Carlier, L.

Slides:



Advertisements
Similar presentations
LIU-SPS Beam Loss, Protection, Transfer Lines WG
Advertisements

Towards an extremely-flat beam optics with large crossing angle for the LHC José L. Abelleira, PhD candidate EPFL, CERN Beams dep. Supervised by F. Zimmermann,
Numbers
SECTOR TEST PREPARATION W. Bartmann, C. Bracco, J. Uythoven LIBD Meeting, 10-Feb-2015.
New optics for the PSB measurement line J.L. Abelleira Thanks to B. Mikulec, G.P. De Giovanni, Jean-Francois Comblin MSWG, 13 Feb 2015.
Phase Difference = Phase Difference = 0.05.
NETWORK LEVELING & CONTOURING 1 A contour line is a line that passes through points having the same elevation. It is produced by intersecting imaginary.
Injection losses and protection Evian, 12-Dec-11 W. Bartmann R. Appleby, P. Baudrenghien, C. Bracco, B. Dehning, A. Di Mauro, L. Drosdal, J. Emery, E.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
New ALICE Beam Pipe: Injection Protection C. Bracco on Behalf of ABT/BTP Acknowledgment: M. Giovannozzi.
Evian LHC BC workshop January LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
H - injection simulations 13th October 2014 Jose L. Abelleira, Chiara Bracco.
V. Kain AB/OP1Sep 12, 2007 Summary of Discussion on Injection Protection Issues Injection Protection Issues – meeting 22 nd of June V. Kain, A. McPherson,
Lattice DSB (new version in progress) S. Guiducci Webex 8 February 2011.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
PSB semgrid - wire scanners measurements Emittance working group meeting 13/10/2015 Emiliano Piselli BE-BI-BL.
Preliminary Design of Electron Beam line F. Velotti, C. Bracco, B. Goddard and M. Meddahi.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
FCC related MDs. Faster LHC ramp MD Brennan Goddard; Matteo Solfaroli Camillocci; Wolfgang Bartmann; Florian Burkart; Francesco Maria Velotti; Mike Lamont;
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
Beam transfer considerations for LAGUNA Angelina Parfenova, W. Bartmann, L. Ducimetiere, B. Goddard, V.Kain, M.A. Kowalska, M. Meddahi, B. Puccio, F. Velotti.
UBW2012, A. Matveenko Michael Abo-Bakr (presented by Alexander Matveenko) Unwanted Beam Workshop (UBW 2012) Dark Current Issues for Energy.
Statistics 2015 Fixed Target CT/MTE and LHC BRIGHTNESS Eric Veyrunes, Johan Dalla-Costa, Diego Perez.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
A preliminary overview on the 2014 Scrubbing Run II The scrubbing team, i.e. H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, B. Salvant,
V. Kain, External MPS Review, 7 th of September ‘10 LHC PROTECTION AT INJECTION SPS extraction, LHC transfer lines, LHC injection 1 V. Kain, LHC Operations.
Aperture measurements during LHC commissioning 2017
Oleksiy Dolinskyy 1st December, 2014
Space charge studies at the SPS
SPS extraction, transfer lines, injection
Status on Work for Splitter FS and Dilution System FS
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Recent Studies of Injection System at
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Beam Line Alignment Richard Catherall EN-STI
Safe Injection into the LHC V.Kain AB/CO
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
مراقبت خانواده محور در NICU
Machine studies during beam commissioning
Magnetic gap calculation
دانشگاه شهیدرجایی تهران
LHC Injection and Dump Protection
TT20 MD for the NA61/SHINE fragmented beam experiment
MD#2 News & Plan Tue – Wed (19. – 20.6.)
تعهدات مشتری در کنوانسیون بیع بین المللی
Dee1 View from back of back plate
THANK YOU!.
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
دومین کمیته مترجمین حاکمیت بالینی دانشگاه
مـانــــــور زلـــزله
,. . ' ;; '.. I I tI I t : /..: /.. ' : ····t I 'h I.;.; '..'.. I ' :".:".
Thank you.
Thank you.
Beam Line to the HiRadMat Test Facility
Wednesday 23/2 Thanks CRYO!!!.
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

LIBD Meeting on results of 2014 TL tests APERTURE SCANS Jose L. Abelleira for the TL team: R. Alemany-Fernandez, W. Bartmann, C. Bracco, E. Carlier, L. Drosdal, M.A. Fraser, K. Fuchsberger, E. Gianfelice-Wendt, B. Goddard, V. Kain, M. Meddahi, J. Uythoven, F. Velotti, J. Wenninger… Thanks to: g 4 December 2014

LIU-ABT systems : PS. Beam parameters2

3

4

5

6 13σ, 100% transmission

14σ, 90% transmission LIU-ABT systems : PS. Beam parameters7

14.5σ, 60% transmission LIU-ABT systems : PS. Beam parameters8

15σ, 0% transmission LIU-ABT systems : PS. Beam parameters9

TI8 LIU-ABT systems : PS. Beam parameters10 vertical phase# σ# σTrans [%] 00      12.5avg(70.5,38)=       -13avg(100,21)=60 horizontal Acceptance interval, transmission > 50 % phase# σ# σTrans [%] 00            1267

TI2 LIU-ABT systems : PS. Beam parameters11 TT60 knobsTI2 knobs phase# σ# σTrans [%]# σ# σ 00  16.5avg(40,60)=50 60  13.5avg(77,42)=  15.5avg(61,35)=  21.5avg(88,38)=  >    13.5avg(87,24)=   phase# σ# σTrans [%] 00  11.5(21,94)=57 60  11.5(22,70)=46 90  9.5(92,19)=  10.5(25,84)=   11.5(31,95)=  12.5(91,20)=  15.5(69,19)=  12.5(83,23)=  13.5(87,23)=  13.5(92,35)=63.5 vertical horizontal Acceptance interval, transmission > 50 %

LIU-ABT systems : PS. Beam parameters12

LIU-ABT systems : PS. Beam parameters13

TI8 HOR LIU-ABT systems : PS. Beam parameters14

TI8 VER LIU-ABT systems : PS. Beam parameters15

TI2 HOR LIU-ABT systems : PS. Beam parameters16

TI2 VER LIU-ABT systems : PS. Beam parameters17

Thank you… José L. Abelleira. PhD oral exam18 …For your attention