Lower Rio Grande Valley Low Impact Development (LID) Implementation and Education by Brianna Saenz,MS, EIT AUGUSTO SÁNCHEZ-GONZÁLEZ, M.S, CFM. Institute.

Slides:



Advertisements
Similar presentations
(your state) Master Farmer Program
Advertisements

Using RMMS to Track the Implementation of Watershed-based Plans
Project Background and Objectives
Texas Clean Rivers Program Steering Committee Meetings Nueces River Authority Texas Commission on Environmental Quality Citizens March.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
217/ Sustainable practices on campus can help achieve Storm Water Compliance University of Illinois at Urbana-Champaign C. Eliana.
U.S. Environmental Protection Agency Region 2 Green Infrastructure – Community Vision March 14, 2013 Ensuring safe and clean water for all Americans Ensuring.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
LID and Stormwater Technical Resource Center Update County Road Administration Board November 3,
Montana’s 2007 Nonpoint Source Management Plan Robert Ray MT Dept Environmental Quality.
Watershed Management & Low Impact Development for Litchfield Board of Realtors Green Committee DEP / Watershed, Lakes and NPS Programs MaryAnn Nusom Haverstock.
Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant April 25, 2013.
Texas Commission on Environmental Quality URBAN DEVELOPMENT AND WATER QUALITY Texas Commission on Environmental Quality October, 2008.
Using Rainwater to Grow Livable Communities Sustainable Stormwater Best Management Practices (BMPs)
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Green City, Clean Waters: Philadelphia Green Schoolyards
Texas Clean Rivers Program Nueces River Authority Texas Commission on Environmental Quality Citizens.
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
Section 319 Grant Program Nonpoint Source Pollution Control
State Approaches to Funding Local Projects A Survey of RFPs The State/EPA NPS Partnership New Orleans, November 27, 2001.
Bill Eyring – CNT Senior Engineer Illinois Sustainable Technology Center September 29, 2010 Monitoring and Documenting Green Stormwater Best Management.
Forest harvesting practices are a suite of BMPs that minimize the environmental impacts of road building, log removal, site preparation and forest management.
Source Water Protection Plans A case study of the Ross Barnett Reservoir in Central MS.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
Nutrient Management in the Urban Landscape Rebecca Kluckhohn, P.E. Watershed Engineer West Metro Water Alliance Forum, May 18 th 2011 W W e n c k Engineers.
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
West Metro Water Alliance A Path to Clean Water – Understanding TMDLs and Watershed Planning September 21, 2011 Diane Spector Wenck Associates, Inc.
2011 Lower Basin Stakeholder Forum Nueces River Authority Feb 16, 2011 – Uvalde Feb 23, 2011 – Corpus Christi.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
DC Draft Phase II Watershed Implementation Plan Stakeholder Meeting March 1, 2012 Metropolitan Washington Council Of Governments Hamid Karimi Deputy Director.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Rainwater is Good: Designing Stormwater Management to Work for YOU A presentation by Jennifer Fais STC and the Upper Susquehanna Coalition April 8, 2004.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
STATUS OF GREEN LAKE. Status of Green Lake Lake Management Plan Approved Lake Management Plan Approved Three Grants Awarded Three Grants Awarded.
By Mary Waters, Texas Stream Team. Outline  About the Arroyo Colorado  Basic information (geography)  History  Major uses  Water quality summary.
What’s New in Stormwater Requirements for Development Projects? Jill Bicknell, P.E. EOA, Inc. New Development Workshop May 22, 2013.
Water Quality Management in the Lower Rio Grande Valley and Arroyo Colorado Presented at the 17 th Annual LRGV Water Quality Management Conference South.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Holistic Approach to Sustainable Site Design May Include: Optimizing water use Optimizing ground water recharge Reducing storm water runoff Reducing energy.
CLEAN WATER ACT Section 319 Grant Funds Robin F. “Rob” Rung Contracts / Grants Officer Water Quality Planning Bureau Department of Environmental Quality.
Michigan’s Nonpoint Source Program Pass Through Grant Funding Past, Present, and Future Outlook Bob Sweet Past Aquatic Biologist, Present Administrative.
Caroline County Pilot Watershed Implementation Plan (WIP) Katheleen Freeman, AICP, Director Caroline County Department of Planning & Codes Leslie Grunden,
Solving Water Pollution Problems in the Wakulla Springshed The City of Tallahassee’s Efforts to Reduce Stormwater Pollution Hydrogeology Workshop May 12-13,
Minnesota Pollution Control Agency Watershed Section Funding Pete Fastner Grants Coordinator Watershed Division February 3, 2015.
What recommendations will you make to the MV City Council to minimize/reduce the impacts to the C.R.’s water quality (if your scenario is approved)? 1.Protect.
Rainwater Management March 3, 2006 Richard Boase, P.Geo., CCEP North Vancouver District Single Family Properties New Direction for Watershed Health.
St. Johns County Water Quality Program Update March 15,
Impacts of Livestock Waste on Surface Water Quality By the North Dakota Department of Health Division of Water Quality For the Livestock Manure Nutrient.
Northern Virginia Regional Commission MS4 Workgroup March 17, 2011.
Water and Wastewater Infrastructure Project Financing 1.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
PRESENTED BY: MARGARET COOK REBECCA MOORE ALISON WOOD STEFAN WRAY Moving Toward Cooperation: The Lower Rio Grande Water Quality Initiative.
TMDL Implementation: Now What?
GREEN STREETS | GREEN JOBS | GREEN TOWNS INITIATIVE
Preventing and Reducing Pollution From MS4 Activities
Minnesota Pollution Control Agency Watershed Section Funding
City Council Meeting December 20, 2016
Total Maximum Daily Load Program
Texas Water Resources Institute
City of Forest Lake MS4 Program
Tim Cawthon TCEQ Nonpoint Source Program
Stormwater Retrofit at a Challenging Site
Jennifer Adkins Schuylkill Watershed Initiative Grant Coordinator
Nonpoint Source Program
Stormwater Best Management Practices
SHOAL CREEK WATERSHED ACTION PLAN
Presentation transcript:

Lower Rio Grande Valley Low Impact Development (LID) Implementation and Education by Brianna Saenz,MS, EIT AUGUSTO SÁNCHEZ-GONZÁLEZ, M.S, CFM. Institute for Sustainable Energy and the Environment Texas A&M University-Kingsville May 18, 2016

Background The Arroyo Colorado has low dissolved oxygen and high bacteria levels in the tidal segment (2201) Does not currently meet the aquatic life use designated by the State of Texas and described in the TCEQ’s Surface Water Quality Standards. The Arroyo was first listed on the state’s list of impaired waters (the 303(d) List) in In response to the impairment local efforts developed a watershed protection plan (WPP) 2

Background The Non Point Source Program (NPS) at TCEQ and the USEPA through a federal program authorized under Section 319 of the Clean Water Act, has allocated funding for the implementation of LID demonstration projects. ISEE at Texas A&M University- Kingsville in coordination with eleven local partners was awarded with $3.7M in grants in three different grant cycles (FY 2010, FY1011, FY1012 and FY13). 3

Objectives Design, construct and/or amend facilities with LID features. Provide outreach and education to visitors, the community and public and private land development professionals about LID Assess the costs, functionality, and administrative elements of LID practices. Increase the use of LID practices in land development projects. Conduct water quality monitoring to assess the potential environmental impact that these LID features will have on water quality. 4

LID Phase I: Monte Bella Park, Brownsville 5

6

LID Phase I: Amigos del Valle Center, San Juan TAMU-Kingsville has developed a green roof system that will meet the constrains of the project. A workgroup of experts was formed to address each element of the project: USDA TCI roofing TO plastics

8 Other elements of the project Rain Harvesting System Bioswale Rain Garden

LID Phase I: Valley Nature Center, Weslaco 9 Stromwater treatment wetland is completed including: -Educational signage -Biofiltration device -Solar pump

LID Phase I: Indoor Recreation Center, La Feria 10 With initial paver pattern, erosion in the aggregate between the pavers was observed. Aggregate was changed and paver patter was also changed.

11 Indoor Recreation Center, City of La Feria

LID Phase II: Cameron County Drainage District #1 12 The Cameron County Drainage District #1 is transforming the 45- acre tract into an educational public park. Wetland excavation is at 100% Parking lot is completed and RWHS design is finished and ready for bidding process BMPs included in this project: bioretention areas, wetlands for biofiltration, pervious pavement, rainwater harvesting.

LID Phase II: Cameron County Drainage District #1 13

LID Phase II: Public Library, Weslaco 14 The City of Weslaco’s proposal seeks to install water allocation cisterns at the public library then recycle this water for use within the landscaping needs of the library. Design is completed and the project is currently open for bids. The system was installed by June 2013.

LID Phase II: New Fire Station, Alton 15 The new fire station will have a permeable paver driveway designed for heavy load applications Construction started in March 2013 The proposals received for this project were 30% lower than what was initially estimated. A total of $56,000 are available to implement other projects.

LID Phase II Amendment: South Texas College 16 Approved by TCEQ and EPA as an amendment to the LID II contract. Focus on water quality monitoring and BMP performance evaluation

LID Phase II Amendment: South Texas College

18 LID Phase III: City of Alamo

19 LID Phase III: City of Alamo

Load Reductions Site Nitrogen (lbs/yr) Phosphorus (lbs/yr) BOD (lbs/yr) Sediment (lb/yr) E. coli (MPN/yr) Cascade Park x10 11 South Texas College ND x10 9 City of Alton* N.D89.0ND Weslaco LibraryND 238ND Site Nitrogen (lbs/yr) Phosphorus (lbs/yr) BOD (lbs/yr) Sediment (lb/yr) E. coli (MPN/yr) Valley Nature Center , ND City of La FeriaND x10 9 City of Brownsville ND x10 9 City of San Juan* ND x10 9

Monitoring Data (BOD)

Monitoring Data (TSS)

Hydraulic Load Reductions

BMP Cost BMP LocationsType of BMPCharacteristics* Cost COB Monte Bella Park Pervious parking lot Drainage Area 1280 sq ft 2442 sqft (impervious; control) $ 123,479 Pervious walking trails Drainage Area 200 sq ft $ 13,092 Bioswale60 linear ft $ 17,140 Rain Harvesting System5,000 gal $ 11,765 COSJ Amigos del Valle Center Rainwater collection systemTwo 5,000 gal cistern $ 17,300 Green Roof 2,000 sq ft with irrigation system $ 60,235 Rain Garden254 sq ft $ 6,654 Linear bioswale85 linear feet $ 14,639 Valley Nature Center Rainwater collection systemTwo 5,000 gal cisterns $ 15,850 Green Roof200 sq ft with irrigation system $ 61,275 Pervious walking trails4,000 sq ft $ 27,233 Pervious service road2,800 sq ft $ 68,083 Wetland0.5 Ac $ 47,658 COLF Recreation Center Pervious parking lot Drainage area 2,250 sqft (pervious) 2,250 sq ft (impervious; control) $ 209,482

BMP Cost BMP LocationsType of BMPCharacteristics Cost CCDD#1 Cascade Park Rainwater collection system One 10,000 gal cistern $ 14,441 Wetland10 ac $ 173,908 Pervious Parking Lot17,000 sq ft $ 78,838 Bioswale20 ft $ 23,188 COA Fire StationPervious Pavement12,000 sq ft $ 95,369 COW Public Library Rainwater collection system One 10,000 gal $ 25,750 STCBioswale250 ft $ 31,733*