MAXIM Pathfinder IMDC Study 13 May 2002. Science Team Keith Gendreau Code 662 GSFC Webster CashUniversity of Colorado Ann ShipleyUniversity of Colorado.

Slides:



Advertisements
Similar presentations
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Advertisements

Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
The Field of View of a Thin Lens Interferometer Baseline=2B F F=range from array center to detector  ’’  Nulled here. B B 2Bsin  Bsin  2 Channels.
Adaptive Optics and Optical Interferometry or How I Learned to Stop Worrying and Love the Atmosphere Brian Kern Observational Astronomy 10/25/00.
Use of a commercial laser tracker for optical alignment James H. Burge, Peng Su, Chunyu Zhao, Tom Zobrist College of Optical Sciences Steward Observatory.
MAXIM Power Subsystem Diane Yun Vickie Moran NASA/GSFC Code (IMDC) 8/19/99.
1 Astrophysical black holes Chris Reynolds Department of Astronomy.
Slide 1 Light and telescopes Just by analyzing the light received from a star, astronomers can retrieve information about a star’s 1.Total energy output.
Josephine San Dave Olney 18 August, July 1999NASA/GSFC/IMDC2  Appears to be Feasible  Requirements  Coarse Pointing baselined on NGST  Future.
Astronomical Spectroscopy
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
An X-ray Interferometry Technology Roadmap Keith Gendreau NASA/GSFC Webster Cash U. Colorado.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Super Star Tracker.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
1 Mirror subsystem: telescope structure Functions: Functions: Support mirrors subsystem to S/C Support mirrors subsystem to S/C Accommodate cryostat Accommodate.
The Relativity Mission, Gravity Probe B Experimental Design, Sources of Error, and Status Mac Keiser Snowmass 2001 July 4, 2001.
Attitude Determination and Control System
Final Version Micro-Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Eric Stoneking Paul Mason May 17, 2002 ACS.
HESSI Imaging Capability Pre Environmental Review Brian R. Dennis GSFC Tuesday, February 29, 2000.
Final Version John Martin May 13-17, 2002 Opening Comments Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
Optics and Telescopes. Optics and Telescopes: Guiding Questions 1.How do reflecting and refracting telescopes work? 2.Why is it important that professional.
The Second International Workshop on Ultra-high-energy cosmic rays and their sources INR, Moscow, April 14-16, 2005 from Extreme Universe Space Observatory.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
NORDFORSK Summer School, La Palma, June-July 2006 NOT: Telescope and Instrumentation Michal I. Andersen & Heidi Korhonen Astrophysikalisches Institut Potsdam.
MAXIM Webster Cash University of Colorado. Capella ”
DRM1 design description SDT 5/17/12 1. WFIRST DRM candidate design summary At SDT6 2/2-3/2012 consensus for full-up mission, aka “DRM1” was: 1.3m aperture,
Final Version Gabe Karpati May 17, 2002 Micro-Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF) System Overview.
TABLE OF CONTENTS Table of Contents: Mission Overview Timeline Scientific Objectives Spacecraft Launch Vehicle Equipment Nuclear Spectroscopic Telescope.
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
1 The slides in this collection are all related and should be useful in preparing a presentation on SIM PlanetQuest. Note, however, that there is some.
Henry Heetderks Space Sciences Laboratory, UCB
Final Version Dick Bolt Code 302 May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Success.
Telescopes. Light Hitting a Telescope Mirror huge mirror near a star * * * small mirror far from 2 stars In the second case (reality), light rays from.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Multiple Spacecraft Observatories for 2020 and Beyond: Breaking a Tradition of Four Centuries Webster Cash University of Colorado.
X-ray Interferometry Webster Cash University of Colorado.
SuperNova / Acceleration Probe System Engineering Mike Roberto and Mike Amato November 16, 2001.
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Periscope Configuration
Super Star Tracker ISAL Study 28 January - 8 February 2002.
Extended Detector Cutoff Considerations WFIRST Project Office May
May 23, 2002John Mather, NGST1 Adaptive Structures and Scientific Missions John Mather Senior NGST Project Scientist May 23, 2002.
Final Version Gary Davis Robert Estes Scott Glubke Propulsion May 13-17, 2002 Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y APS Formation Sensor.
Ball Aerospace & Technologies Corporation -
Exploring an evidence of supermassive black hole binaries in AGN with MAXI Naoki Isobe (RIKEN, ) and the MAXI
MPI Semiconductor Laboratory, The XEUS Instrument Working Group, PNSensor The X-ray Evolving-Universe Spectroscopy (XEUS) mission is under study by the.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Radio Telescopes. Angular resolution Distant objects are separated by an angle. –Degrees, arc-minutes, arc-seconds Angular resolution refers to the ability.
1 BROOKHAVEN SCIENCE ASSOCIATES Vibrations effect on 1nm focussing K. Evans-Lutterodt NSLS-II VTG Januaury
X-ray Interferometer Mirror Module ISAL Study Pre-work Overview.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Webster Cash Keith Gendreau and The Maxim Team MAXIM The Black Hole Imager.
Ares V an Enabling Capability for Future Space Science Missions H. Philip Stahl, Ph.D. NASA MSFC.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Super Star Tracker.
Incorporating Hubble Servicing with NASA’s Long-Term Vision
TEMPO Instrument Update
LAI-FKSI Optical Sensitivity at 2µ wavelength
Maxim Pathfinder Prework 16 August 1999
Image Stabilization System (ISS)
MAXIM The Micro-Arcsecond X-ray Imaging Mission
Henry Heetderks Space Sciences Laboratory, UCB
Micro-Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF)
Launch and On-orbit Checkout
THERMAL CONTROL SYSTEM
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

MAXIM Pathfinder IMDC Study 13 May 2002

Science Team Keith Gendreau Code 662 GSFC Webster CashUniversity of Colorado Ann ShipleyUniversity of Colorado

Objectives –Demonstrate X-ray interferometry in space as pathfinder to full up MAXIM –Image with 100 micro-arc second resolution using a 1-2 m baseline –1000 times improvement on Chandra Coronae of nearby stars Jets from black holes Accretion disks Two spacecraft flying in formation: –Telescope spacecraft with all the optics –300 micro arc sec pointing control –30 micro arc sec knowledge –“Detector spacecraft” positioned km  10 m and laterally aligned  2 mm from Telescope spacecraft to make fringes well matched to detector pixels –Detector and optics fit within medium class launch vehicle (e.g., Delta IV H) MAXIM Pathfinder Overview Optic Spacecraft Detector Spacecraft L= km!

But, to resolve the event horizon of a black hole, you need more… A Star like Capella is A few mas across.. But the event horizon for the black hole in M87 is only a few  as across….

Full Maxim Design 10 KM 5000 KM CONSTELLATION BORESIGHT Hub Spacecraft SPACECRAFT DELAY LINE 200 M baseline Optics divided between multiple spacecraft. 0.1  as Angular Resolution “Extreme” Formation Flying Detector flown 1000s of km from optics to make fringes comparable to detector pixel sizes

The “New” MAXIM Pathfinder 2 mission modes –mode 1: 100  as Science Very similar to original MP concept, but some looser tolerances 2 formation flying s/c Studies Stars, AGN, Black hole Jets and Accretion Disks –mode 2: 1  as Science Adds “N” s/c to extend angular resolution to a few  as Tougher Formation Flying tolerances Tougher Line-Of-Sight Requirements Get a Glimpse of a Black Hole Event Horizon! Optimize Full MAXIM mission Design to accomplish all mode 1 science with capability to explore mode 2 science N=2

Mode 1 Detector S/C ~320 kg (inst+bus est.) ~400 watts (inst+bus est.) Pitch, Yaw, Roll control to ~ arcminutes Pitch, Yaw, Roll Knowledge to arcseconds Line-of-Sight Control to 5 cm Optics Hub S/C ~600 kg (inst+bus est.) ~200 watts (inst+bus est.) Pitch, Yaw, control to ~ 1 arcsecond (TBR) Roll control to arcminutes Pitch, Yaw, Roll Knowledge to +/- 1 arcsecond 200 km +/- 5 m Formation Flying Challenges: Range control to 10 meters, knowledge to cm LOS Control to “inches” (detector size) LOS to target knowledge to ~30  as (~ km) ~10 degree slews every 1-2 weeks. (~100 targets in 2 years) Target Science: Stars Separate AGN Jets from Disks Neutron Stars SNR Other 100  as science targets 5cm control +/-15  m Knowledge

Mode 2 Detector S/C Optics Hub S/C Activate metrology system to freeflyer spacecrafts 20,000 km +/- 5 m New Formation Flying Challenges: LOS to target knowledge to ~0.1  as (~15 20,000 km) ~10 degree slews every 1-2 months. (~5 targets in 1 year) Target Science: Event Horizons Separate AGN Jets from Disks Neutron Stars Other 1  as science targets 5cm control +/-15  m Knowledge FreeFlyer S/C ~150 kg (inst+bus est.) ~100 watts (inst+bus est.) Pitch, Yaw control to ~1 arcsecond Pitch, Yaw Knowledge to arcseconds Roll Control to ~1 arcsec m Control to ~10 microns 2 arcsec

Mode 2 Detector S/C Optics Hub S/C Activate metrology system to freeflyer spacecrafts 20,000 km +/- 5 m The array of optics spacecrafts: These fly in a virtual plane that is normal to the Line-of-Sight to within 2 arcseconds How many can we fly without needing a second launch vehicle? 5cm control +/-15  m Knowledge 2 arcsec

Some Typical Numbers “MODE 1” 100  as Science (5x radians)  Angstroms S=10  m  F=200 km  2B= 2 m  FOV=250 arcseconds  Long. Control=7 cm “MODE 2” 1  as Science (5x radians)  Angstroms S=10  m  F=20000 km  2B= 200 m  FOV=2.5 arcseconds  Long. Control=700  m

Optics Hub Spacecraft 71 Modules in a ~4m Diameter (shrink as necessary) Each Module has 2 30cm long optics 0.7 cm 2 /Module ~5.4 kg/Module Total Module Mass: 383 kg Total Effective Area: 50 cm 2 13 cm 26 cm Thickness of assembly: 1+ m Additional mass terms: structure, Beacon, star tracker, s/c bus. +~180 kg??? Optics s/c comes to about 600 kg now…

What would one of these modules look like? m msin(g) m/6 Gap~msin(g) Pitch Control msin(g) 3/2m+d m/3 + msin(g) 2(w+gap)+msin(g) By 2(w+gap)+msin(g)+m/3+actuator+encoder ASSUME: w+gap~5 cm Encoder+encoder~5cm Sin(g)~1/30 -->(10cm+m/30)x(15cm+m/3+m/30) -->m=30cm-> 13cmx26cm

Optics Hub Spacecraft Total Mass: ~600 kg ACS Control: Pitch, Yaw ~1 arcsec Roll ~ 1 arcminute ACS Knowledge: Pitch, Raw, Roll ~ 1 arcsecond Payload Power Requirements (* to be refined): Mirror Heaters: ~2 watts/module-> 160 Watts Beacons & Metrology: ~100 Watts

Detector Spacecraft Prime Instrument: X-ray CCD ~100 kg ~50 Watts Wants to be in temperature range of -130 to -90 C Precision Line-Of-Sight Alignment Instrument: “Super Star Tracker” (ISAL) -120 kg 0.5m diam x 2 meter tall -250 watts -cryocoolers need ways to dump power at room temp and 100 K Science Telemetry: ~ 5 kbits/s TOTAL Science Payload Mass: 220 kg TOTAL Science Payload Power: 300 watts ACS Requirements: pitch,yaw,roll control to 1 arcminute (knowldege~ 1 arcsecond) Line-Of-Sight control to ~5 cm.

CCD Camera 50 kg 30cm 40cm ~1 m 50 kg 30cm To Radiator to unload heat from CCD. (900 cm 2 to -130) Electronics Box for CCD This side looks to optics hub s/c

“Line of Sight (LOS)” Instrument Beacon Tracker and Superconducting Gyroscope Insert. (0.5 m diam x 2 m long) Will need radiators (Mike Dipirro) CCD Camera And Electronics. Maybe share a radiator With the LOS instrument? S/C bus Detector S/C

FreeFlyer Spacecraft In Mode 2, we will use extra optical spacecraft to extend baselines to 100s of meters.. ~ 1m diam x 1 m long pill box ~45 kg payload How many can we add before needing a new launch vehicle? ~ 10 watts power (for heater and beacon system) ACS: –Pitch, Yaw, Roll control to ~arcseconds –Translation control to ~10  m –Integrated with BALL “swarm” sensor.

FreeFlyer Spacecraft This Side points toward Optics Hub S/C. 8 Mirror Modules (~5 cm 2 ) 1m How much can we exploit miniature component technologies for “nano” and “micro” sats?

What we want…. This is a ~>2015 mission. Are we right? Cost estimate Refinement of mission profile (eg orbit analysis, …) Identification of required “Miracles” and performance drivers Nice figures… We will be back- but hopefully starting at a better position.

Extensions My guestimate of the total masses suggest that all three s/c total to ~1100 kg. I suspect that there is more capacity in the Delta III (maybe >2500 kg?). If so, how many more free flyers can we put on? As with many of these distant missions, I wonder why we design a mission going 15+ years from now to use present, off-the-shelf technology… Eg. Solar concentrators….

Backup Slides

Designing a Mission 2: What angular resolution at what wavelength do you want?  res  What is the smallest X-ray pixel size(  m) you can imagine? s The baseline (2B) needs to be: 2B =  res The Focal Length (F) needs to be: F =  s/  res The FOV will be: FOV = 80  (s/ ) 2  res Tightest Formation Flying Tolerance between optics s/c = s. “Lateral” Longitudal Formation Flying Tolerance between optics s/c = 80  (s/ ) 2  res B The Difference Here is That we will have fringes 10x bigger than the CCD pixel Size.

Mirror Module Dimensions The Mirror modules are pairs of flat (better than /100) mirrors. One mirror is fixed, the other has pitch (~mas) and yaw (arcminute) control. The module also has the ability to adjust the spacing of the mirrors at the nm level to introduce ~ angstrom pathlength control. Thermal control consistent to maintain optical figure (~0.1 degrees). There is structure to hold the module together.

Actuator Requirements: The pitch control should be to the some fraction of the diffraction spot size.  (m*sin(g))~30 /m ~ 6 mas for m=100 cm, 62 mas for m=10cm ~ 30 nm of control for any size mirror The range of pitch control should be able to accommodate the range of baselines over the range of focal lengths.  max ~ B/F =  s) ~ 1 arcsecond of range ~ 5x10 -6 m of linear range for a mirror of length m. where s=CCD pixel size

dX dd In 1-D we have: 3 unknowns:  d,  o, dx But laser interferometers Only give us 2 measurements: Dred, and Dgreen Interference pattern from optics space craft laser interferometer  Dred Interference Pattern from Detector Space craft laser interferometer  Dgreen oo Two Laser interferometers can make the two spacecrafts virtually rigid- but we still need a tie-in to the celestial sphere-> we still need a star tracker.

dX dd Using a “Super Startracker” to align two spacecraft to a target. In the simplest concept, a Super Star Tracker Sees both Reference stars and a beacon on the other space craft. It should be able to track relative drift between the reference and the beacon to 30 microarcseconds- in the case of MAXIM Pathfinder. The basic procedure here, is to align three points (the detector, the optics, and the target) so they form a straight line with “kinks” less than the angular resolution. The detector and the optics behave as thin lenses- and we are basically insensitive to their rotations. We are sensitive to a displacement from the Line-of-Sight (eg dX). oo For a number of reasons (proper motion, aberration of light, faintness of stars,…) an inertial reference may be more appropriate than guiding on stars. The inertial reference has to be stable at a fraction of the angular resolution for hours to a day. This would require an extremely stable gyroscope (eg GP-B, superfluid gyroscopes, atomic interferometer gyroscopes).

Sizing the Laser Beacon for LOS 1 Watt = 6.25x10 18 eV/s 620 nm = 0.5 eV 620 nm ~ 12.5x10 18 photons/sec Aperture of SST Beacon Tracker= D = 125 mm Laser Beam Expander Diameter = L <~ 1 m Laser wavelength = ~ 620 nm or so Distance from Laser To Tracker = F = 2x10 7 m MAX Required accuracy of LOS=  ~10 -7 arcseconds Telescope is good to ~ 1 arcsecond Required number of Photons to get to accuracy: N=(1 arcsec/  ) 2 ~10 14 OPTICS HUB Size of Footprint of laser=  ( /L*F) 2 Fractional coverage of tracker area: {  D 2 /4}/  ( /L*F) 2 =(DL) 2 /(2F ) 2 Number of Photons/sec into tracker: =(DL) 2 /(2F ) 2 *W*12. 5x10 18 photons/s ~3x10 14 xL 2 xW photons/sec L in meters, W in output laser power. LISA Laser power efficiency=10% NOTE: The LASER DIVERGANCE MIGHT DRIVE THE PITCH AND YAW CONTROL ON THE HUB to A FEW 1/10s of an arc second!!!

28 Option 2: Gravity Probe-B-Like Telescope only centroids on beacon Gyro provides inertial reference frame Advantages –Gyros exist!! 1/3 micro arc sec/day –No need to find stars –Just a beacon tracker telescope –Cryo-cooler: TRL 5 by 2005 ($2-5M for cryo-cooler (flight model only), FM + EM $3 to $7 million, mass about 20kg Launches on Con-X ~ 2010 –Gyro was to launch this year (Oct 2002) $10-100M for both cooler & gyro Disadvantages –Must know aberration Delta-V to 3cm/sec (Landis checks) –GP-B = expensive –Cryogen or coolers/vibrations

29 Option 2: Gravity Probe-B-Like (cont.) Deltas on GP-B –Since 1/3 micro arc sec /day is not required, then we may be able to back off on this capability –Cryo-coolers mean normal conductivity launching –If negligible magnetic L2, simplifies magnetic shielding design –Requirements on magnets in s/c –Neutralize cosmic-ray charging –Respinning up gyro? (dynamic range) –Cryo getters less important? –Proof mass? Yes-maybe –Squids will be better –Venting vs. cooler mechanism –Mass, power,size,cost,other req’ts (mag,jitter,thermal) –Need to integrate over 10 sec you get 10E-13radians???? –ConX, NGST Cooler specs: 150W BOL, 250W EOL, 10 yr lifetime, 20-30kg include electronics, heat syncs temp, produces 7.5mWatts 6K Selection in March 2002 –Cryo cooler mating to Adiabatic Demagnetization Refrigerator (ADR) starts in Temperature 2 K or less. Estimate 30 watts.

Super Star Tracker Beacon System

Thermal Meeting a pointing requirement of 30 micro arc sec requires extreme structural stability between the attitude sensor and the instrument. Mounting the attitude sensor and the instrument to the same platform would help accomplish this; in any case, the interfaces must be extremely rigid to prevent drift. In addition, temperatures must be tightly controlled to maintain dimensional stability, even with structural materials having a very low coefficient of thermal expansion (CTE). Allowable temperature difference was calculated as follows: 1. Assume a perfectly rigid structure. 2. Assume the best structural material currently available (M55J composite, with a CTE = per o C) Since (sin 30 micro arc sec) is 1.5 x , this represents the distortion limit. The temperature change producing this error is (1.5 x ) / (10 -7 ) = 1.5mK Developing a lower CTE structural material should be a high research priority! Otherwise, temperature control must be to about 0.1mK, which has been done only in labs on very small sample volumes. Control to 1mK has been achieved on space instruments, but again in small volumes. This is another area requiring a technology upgrade.

Detectors Note: Mass is 4 kg for 2 detectors