Safety & Radioprotection 8 Jul. 2005, Liverpool, UK WP 5: Safety & Radioprotection Participants:role 1. GANIL, France - sub-task D 2.

Slides:



Advertisements
Similar presentations
Paul Scherrer Institut 5232 Villigen PSI EURISOL Kick-off meeting, L. Zanini EURISOL DS Task 4 L. Zanini PSI Kick-off Meeting CERN,
Advertisements

Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
Yoro TALL Santiago de Compostela (Spain) June 7 – 10, Second IP EUROTRANS Internal Training Course on Nuclear Data for Transmutation: status, needs.
BEAM INTENSITIES WITH EURISOL M. Valentina Ricciardi GSI, Darmstadt, Germany.
May 22nd & 23rd 2007 Stockholm EUROTRANS: WP 1.5 Task Containment Assessment IP-EUROTRANS DOMAIN 1 Design WP 1.5 Safety Assessment of the Transmutation.
Induced Activity Calculations in Support of D&D Activities at SLAC Joachim Vollaire, Radiation Protection Department.
Oct.18, Neutron Field and Induced Radioactivity in IFMIF Environment M. Sugimoto(JAERI) IEA International Work Shop on Fusion Neutronics The Kongreshous.
BROOKHAVEN SCIENCE ASSOCIATES Radiological Design Considerations of Synchrotron Radiation Facilities P.K. Job Radiation Physicist National Synchrotron.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
1 JASMIN Activation Experiments (T-972/993/994) Yoshimi Kasugai on behalf of JASMIN Activation team JASMIN Activation team Y. Kasugai, K. Oishi, H. Matsumura,
1 HINDAS: A European Nuclear Data Program for Accelerator-Driven Systems HINDAS: A European Nuclear Data Program for Accelerator-Driven Systems A. Koning.
Page 1NANUF03 - Bucharest - September Optimisation of UCx targets for fission induced by fast neutrons or electrons. Optimisation of UCx targets.
Cross-section studies of important neutron and relativistic deuteron reactions Vladimír Wagner Nuclear physics institute of CAS, Řež, Czech Republic,
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Investigation of GeV proton-induced spallation reactions
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Association FZK-Euratom Status of Neutronics Tools & Data for IFMIF-EVEDA U. Fischer, S. Simakov.
05-Oct-02 L. Moritz TRIUMF 4004 Wesbrook Mall Vancouver, B.C. V6T2A3 SAFERIB Workshop CERN, Oct.30-Nov.1,
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5A. Marchix19/09/2013 Thanks to : AP. Bernardes/EN/STI, J.Blaha/DGS-RP,
RADIOACTIVE ION BEAMS AT B.RANNOU W.MITTIG M.G.ST LAURENT (GANIL France)
JAERI nuclear analyses for IFMIF T. Umetsu, M. Yamauchi and M. Sugimoto Presented by Takeo NISHITANI Japan Atomic Energy Agency (JAEA) IAEA Technical Meeting.
Y. Romanets 1, R. Luis 1,J. Bermudez 3, J.C. David 5, D. Ene 5, I. F. Goncalves 1, Y. Kadi 2, C. Kharoua 2, F. Negoita 4, R. Rocca 2, L. Tecchio 3, P.
Systematic studies of neutrons produced in the Pb/U assembly irradiated by relativistic protons and deuterons. Vladimír Wagner Nuclear physics institute.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
7 Days Until the Benchmark Catalyst: 1.What is nuclear fission? 2.Iodine is 80% 127 I, 17% 126 I, and 3% 128 I. Calculate the average atomic mass of iodine.
Experimental Studies of Spatial Distributions of Neutrons Produced by Set-ups with Thick Lead Target Irradiated by Relativistic Protons Vladimír Wagner.
Nuclear Facilities Decommissioning & Design An introduction to SENAC activities JM. Dumas CEA Saclay, DSM/DAPNIA/SENAC, F Gif-sur-Yvette,
PAC on Nuclear Physics 20-th Session April 1-2, 2004, Dubna SAD STATUS REPORT ON THE SAD PROJECT & LONGTIME PERSPECTIVES V. Shvetsov FLNP.
Nuclear Chemistry. RadioactivityRadioactivity  The spontaneous decomposition of a nucleus to form a different nucleus accompanied by a release of energy.
EURISOL – Task 11 meeting 2007S. Chabod 1 OUR CONTRIBUTION INSIDE EURISOL TASK 11 OPTIMIZATION OF IN-TARGET NUCLEI YIELDS Target parameters: material (Al.
Mitja Majerle for the “Energy Plus Transmutation” collaboration.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Beam intensities with EURISOL Aleksandra Kelić, GSI-Darmstadt on behalf of the EURISOL DS Task 11 Participants and contributors: ISOLDE-CERN, CEA/Saclay,
Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.
Ondřej Svoboda Nuclear Physics Institute, Academy of Sciences of Czech Republic Department of Nuclear Reactors, Faculty of Nuclear Sciences and Physical.
1 Neutron Effective Dose calculation behind Concrete Shielding of Charge Particle Accelerators with Energy up to 100 MeV V. E Aleinikov, L. G. Beskrovnaja,
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
What is radioactivity? lecture 9.1 Gamma ray bursts from a star collapsing into a Black Hole.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
FLUKA for accelerator radiation protection –Indian perspective Sunil C Accelerator Radiation Safety Section Radiation Safety Systems Division, Bhabha Atomic.

4th International Summer School « Nuclear Physics Methods and Accelerators in Biology and Medicine » Monte-Carlo simulations : FLUKA vs. MCNPX Maxime ODEN.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
Peter Thirolf, WP5/Subtask B EURISOL-DS Town-Meeting, Caen, Status of Radioactivity Control, Status of Radioactivity Control, Safety and Risk.
EURISOL DS Task meeting Orsay, 07 Janvier Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
Neutron double differential distributions, dose rates and specific activities from accelerator components irradiated by 50 – 400 MeV protons F. Cerutti.
March 18, 20051T11 – EURISOL meeting - GSI Aspects of secondary reactions in single- and double-stage targets (ST7) Goal:In-target Yield calculations for.
T5: Safety & Radioprotection MB meeting, 7-8 July 2008, Lisbon, PortugalContact: Task 5: Participants and work plan Participants:role 1.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Radiation protection studies for the ESS Activation issues AD seminar Michał Jarosz , Lund.
P1 – GANIL P2 – CNRS/IN2P3 P3 – INFN P4 – CERN P6 – CEA Saclay P7 – NIPNE Bucarest P18 – PSI Switzerland P19 – IPUL Latvia C2 – BINP Novosibirsk C3 – VNIITF.
1 SAFERIB EURISOL DS WP5 Progress Report CERN-RP: Mariano Menna, Jerôme Desarzens, Thomas Otto.
1) How is the mass number calculated (2).
Heating and radiological
Electromagnetic Spectrum
Studies on Energy Deposition and Radiation for the 4horn system
Radiation protection of Linac4 M. Silari Radiation Protection Group
Report to Delta Review: Hadronic Validation
BEAM INTENSITIES WITH EURISOL
Chapter 9 Nuclear Radiation
Preliminary Study – Radiation induced activity in a SB Target
Chapter 9 Nuclear Radiation
Presentation transcript:

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK WP 5: Safety & Radioprotection Participants:role 1. GANIL, France - sub-task D 2. FZJ, Germany - sub-task C 3. LMU, Germany - sub-task B 4. CERN, EU - sub-task A 5. CEA, France - coordination 6. NIPNE, Romania - contribution 7. FI, Lithuania - contribution 8. Univ. Warsaw, Poland - contribution External partners: ORNL, ANL, TRIUMF, JAERI, KAERI Total budget request: ~700 kEuros for this task 4 sub-tasks (A) Radiation, activation, shielding & doses (B) Radioactivity control, safety & risks (D) Conformity to legislation 4y 3y 2y 1y schedule (C) Decommissioning 4 sub-tasks (A) Radiation, activation, shielding & doses (B) Radioactivity control, safety & risks (D) Conformity to legislation 4y 3y 2y 1y schedule (C) Decommissioning

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK In collaboration with the tasks: WP 4 and WP 11 Sub-task A: Radiation, activation, shielding & doses (coord. by CERN; 0-24 months) 1 st year plan: benchmark calculations Particle and energyMaterialsCodes protons and neutrons; 150 MeV – 1500 MeV C, Be, Si, Fe, Hg, Pb, Ta, W, Th, U (both thin and thick targets) FLUKA and MCNPX ActionObservableParticipant (code)Specific task 1Neutron and photon attenuation FI (MCNPX) and NIPNE (FLUKA) CERN and CEA helps in defining the benchmarks and data 2Neutron and charged particle production CEA (MCNPX) and WU (FLUKA) CEA provides data for thin targets; WU provides data for thick targets. 3Production of residuesCEA (MCNPX) and CERN (FLUKA) CEA provides data for thin targets; CERN provides data for thick targets Preliminary results  EURISOL DS week in Nov Final report  due to Feb. 2006

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK Good knowledge of physics is indispensable! J.-C. David (CEA) Importance of benchmarks!

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK Hg Xe L.Zanini et al., ND2004, Santa Fe, Sept. 26 – Oct. 1, GeV p+PbBi at ISOLDE New model Old model Choice of default model parameters is not acceptable! S. Leray (CEA)

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK after 1 year irradiation Concentration of atoms The best models should be used! volatiles Charge Z Bq/kg Cooling time Activity (Curies) L. Donadille (CEA)

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK Sub-task B: Radio-activity control, safety & risk (coord. by LMU; 0-48 months) 1 st year plan: (B1) design of gas purification system & cryogenic trap prototype commissioning (B2) model creation and validation for activity in the ground water (B3) creation of the software platform for exposure evaluations

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK P. Thirolf (LMU) Installed and connected to the He-refrigerator Thermal sensors to be installed Measurements with known tracer elements 1 st year plan: (B1) design of gas purification system & cryogenic trap prototype commissioning (B2) model creation and validation for activity in the ground water (B3) creation of the software platform for exposure evaluations

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK A. Plukis (FI) & R. Moormann (FZJ) Experience gained in the design of ESS is being collected TRACE/PARTRACE and SPRING codes are chosen Validation with data based on pesticide transport in progress Validation with data based on nuclear power plants to be done Similar task in SAFERIB of EURONS 1 st year plan: (B1) design of gas purification system & cryogenic trap prototype commissioning (B2) model creation and validation for activity in the ground water (B3) creation of the software platform for exposure evaluations

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK F. Negoita (NIPNE) Experience gained in the design and control of NPP is being collected Software platform for EURISOL DS  Point Source Exposure  Acute Exposure to Environmental Releases  Prolonged Exposure to Environmental Releases Data library creation for EURISOL DS  Routine Exposure Data  Emergency Exposure Data 1 st year plan: (B1) design of gas purification system & cryogenic trap prototype commissioning (B2) model creation and validation for activity in the ground water (B3) creation of the software platform for exposure evaluations

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK Summary Some work well in progress and 1 st results to be reported in EURISOL DS week Creation of the WWW for the task  well in progressWWW Close collaboration with SAFERIB of EURONS  activated Contact and collaboration with external partners  activated Meetings held: T5-01-CERN “Kick-off” T5-02-CEA “Monte-Carlo” Meetings planned: T5-03-CEA-oct.05 in collaboration with SAFERIB“progress” Difficulties to hire good candidates Start of the DS for safety and radioprotection still under “stand-by” Need of data for materials, dimensions, beam properties, etc. 

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK Béton Air V. Blideanu (CEA) Cyclotron “Nantes” Input: p, d,  (70 MeV; 1 mA) + target (?) Request: dimensions of concrete walls for doses <0.5μSv/h

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK Z(cm) Y (cm) Z(cm) X (cm) Direction du faisceau 6 m V. Blideanu (CEA) Calculations can be done! BUT How many of them? All possible materials? All possible particles and their energies? All “imaginable” geometry configurations?

Safety & Radioprotection 8 Jul. 2005, Liverpool, UK Limite de 0,5μSv/h Limite inferieure du massif 400 cm 380 cm 480 cm uSv/hr Z (cm) V. Blideanu (CEA)Example: Protons on heavy mass target Situation is completely different for deuterons & alphas and/or different targets!