NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:

Slides:



Advertisements
Similar presentations
NOTE: REFERENCE PROJECT MANUAL DATED 1/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
Advertisements

NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET OLIN.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
WESLEYAN P BID PACKAGE #19
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P LAWN AVENUE VINYL SIDING,
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P AB HOME AVENUE INTERIOR.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
BEFORE AFTER SHANKLIN – PARAPET RESTORATION FY 15 Before and After SHANKLIN – PARAPET RESTORATION.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P / 169 HIGH STREET VINYL.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
WESLEYAN P JUDD HALL STAIRWELL LIGHTING REPLACEMENT PROJECT
WESLEYAN P-3-1 MAJOR MAINTENANCE FY PINE STREET
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
FIRE ALARM / FIRE SPRINKLER SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-19-1 MAJOR MAINTENANCE FY BRAINERD AVENUE
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
WESLEYAN P C CAPITAL FY 15 OLIN LIBRARY
WESLEYAN P-32-2 MAINTAIN JUT OUT AND PAINT TO MATCH SIDING
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
LONG LANE GROUNDS GARAGE SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P MAJOR MAINTENANCE FY 14 Foss Hill 1-7
SECTION EXISTING CONDITION PHOTOS
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Interior/Exterior Renovation SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-41-1 MAJOR MAINTENANCE FY AB HOME AVENUE
PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-28-1 MAJOR MAINTENANCE FY WASHINGTON STREET
Repair roof rafters / joists, soffit and fascia boards in this area.
SECTION EXISTING CONDITION PHOTOS
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-3-1 MAJOR MAINTENANCE FY 15 FOSS 1 – 18 FOSS HILL DRIVE
WESLEYAN P-13-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-23-1 MAJOR MAINTENANCE FY 16 63AB HOME AVENUE
WESLEYAN P-22-1 MAJOR MAINTENANCE FY 16 23A VINE STREET
WESLEYAN P-FAFS-1 MAJOR MAINTENANCE FY WASHINGTON STREET
FRONT PORCH REPLACEMENT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-40-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-38-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-18-1 MAJOR MAINTENANCE FY COURT STREET
Presentation transcript:

NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET WINDOW REPLACEMENT / CARPENTRY REPAIRS SECTION EXISTING CONDITION PHOTOS MAJOR MAINTENANCE FY 15

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET WINDOW REPLACEMENT / CARPENTRY REPAIRS SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET WINDOW REPLACEMENT / CARPENTRY REPAIRS SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET WINDOW REPLACEMENT / CARPENTRY REPAIRS SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET WINDOW REPLACEMENT / CARPENTRY REPAIRS SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET WINDOW REPLACEMENT / CARPENTRY REPAIRS SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET WINDOW REPLACEMENT / CARPENTRY REPAIRS SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET WINDOW REPLACEMENT / CARPENTRY REPAIRS SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET WINDOW REPLACEMENT / CARPENTRY REPAIRS SECTION – PROPOSED SQUARE CHAMFERED COLUMNS PORCH RENOVATIONS TO INCLUDE: 1.NEW 8” SQUARE CHAMFERED COLUMNS (FIBERGLASS REINFORCED POLYESTER). 2.NEW WOOD RAILINGS 42” HIGH WITH SQUARE BALUSTERS 3.REINSTALLATION OF DECORATIVE SCROLL BRACKETS AT COLUMNS (TO BE PREPPED AND PAINTED) 4.NEW SQUARE COMPOSITE PRIVACY LATTICE AND COMPOSITE FASCIA BOARDS. 5.NEW DOUGLAS FIR CVG 3 1/8” T&G PORCH DECKING

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET WINDOW REPLACEMENT / CARPENTRY REPAIRS PROPOSED SQUARE CHAMFERED COLUMNS Will not rot, bow, or crack. No priming needed to painting. Quick and easy to install. Maintenance free. LOAD LIMITS: 6" Column: 8" Column: 10" Column: 12" Column: 4000 lbs 8000 lbs lbs lbs