SKA Interface Workshop: Dishes External Interfaces Thomas Kusel & Mark Bowen For Dishes consortium Manchester June 2013.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

Adaptive Ground Antenna Arrays for Low Earth Orbiting Satellites.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
All things DBE… Francois Kapp Sub-system Manager: DBE On behalf of the DBE team present and past... S Rajan, E Bauermeister, A.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
System designAA Consortium - BolognaOctober 2012 AA Consortium AA System configuration options 23 October 2012.
IFPAC-NeSSI Report.ppt; 29 January 2008; Slide 1Siemens Energy & Automation, Inc. Criteria for Design and Specification NeSSI Issues Presentation to IFPAC.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
UMKC Senior SUBSTATION DESIGN TEAM
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
ASKAP Early Science Workshop Lisa Harvey-Smith & Aidan Hotan | ASKAP Project Scientists August 5 th 2013 ASTRONONY & SPACE SCIENCE.
SKA Pre Construction Phase Infrastructure Tracy Cheetham Carel van der Merwe General Manager: Infra & Site OpsInfrastructure System Engineer
Loran Integrity Performance Panel Integrity Fault Tree for Loran Sherman Lo Second LORIPP Meeting Portland, OR September 23-24, 2002.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
AA-Low Technical Progress Meeting, October 2012, Medicina, Italy AAVS0 & AAVS0.5: System Design and Test Plan Nima Razavi-Ghods Eloy de Lera Acedo.
ASKAP Signal Processing Overview DIFX Users and Developers Meeting
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
INFRA:DISH = DISH INFRA: LFAA = LFAA INFRA:SDP = SDP INFRA:CSP = CSP INFRA:SADT = SADT INFRA:MGR = MGR INFRA:AIV = No IF? Infra ICD Leads.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
IMPROUVEMENT OF COMPUTER NETWORKS SECURITY BY USING FAULT TOLERANT CLUSTERS Prof. S ERB AUREL Ph. D. Prof. PATRICIU VICTOR-VALERIU Ph. D. Military Technical.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
A smart signalling system for Indian railways Smart signalling system – user’s view Full capacity realisation Flexibility of movements Easy to operate.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
2 nd convergence workshop: introduction R. T. Schilizzi Penticton 22 July 2004.
Phase and Gain stability of optical fibre link used in MeerKAT Author : Roufurd Julie Supervised by : Prof Michael Inggs SKA HCD bursary conference Dec.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
Andrew Faulkner 2 nd SKADS Workshop October 2007 SKADS Benchmark Scenario Andrew Faulkner.
MeerKAT DBE Past Present Future Alan Langman 28 September 2009.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
1 WP3.3: Steerable antenna technologies: Signal processing aspects Participants: UoY (18MM); POLITO (19MM); EUCON (6MM) Tim Tozer & Yuriy Zakharov.
Adaptive Ground Antenna Arrays for Low Earth Orbiting Satellites Code 584 / Dan Mandl 2005 ISD Technology Workshop 1 Adaptive Ground Antenna Arrays for.
Fast Fault Finder A Machine Protection Component.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
Assembly, Integration & Verification 2015 SKA Engineering Meeting Richard Lord 11 November 2015.
SKA Interface Workshop: AIV Interfaces – Summary and Wrap AIV consortium Manchester June 2013.
SKAO Power Update 2015 Engineering Meeting: Penticton Adriaan Schutte
Class-D Garage Band Amplifier Team: Aaron Danielson, Robert Mann, Randall Newcomb, Scott Russell Sponsor: Nigel Thompson.
Telescope Teams P. Dewdney Telescope Teams – relationships with System Design General role of the Architect Group is ‘Guardians of the Design’.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
CERN Timing Workshop, Geneva, 15 Feb Geneva, 15 Feb 2008 Franck Di Maio – ITER IO Geneva, 15 Feb 2008 Franck Di Maio – ITER IO CERN Timing Workshop.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
BPM stripline acquisition in CLEX Sébastien Vilalte.
1 May-2014 Automotive Protocols & Standards. 2 CAN (Controller Area Network)  Overview Controller Area Network is a fast serial bus designed to provide.
SKA1-low: Cost Considerations AAVP Meeting, ASTRON 14 December, 2011 Tim Colegate, Peter Hall (ICRAR/Curtin) Andre Gunst (SPDO/ASTRON)
The definition of the Earth system or grounding: the electric connection between the work of intentionally electrical device or network devices on the.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
SKA Interface Workshop: AIV interfaces AIV consortium Manchester June 2013.
DISH LMC Software An Idea for Qualification Plan Francesco Schillirò INAF- OACT LMC Harmonisation Workshop Madrid April 2016.
Metadata for the SKA - Niruj Mohan Ramanujam, NCRA.
Engineering Commissioning May 2016 SKA1 LOW – Assembly, Integration & Verification Adam MacLeod AIV Consortium Manager & ASKAP System Engineer.
AADC - LFAA 12-Apr-161 Aperture Array Design & Construction Consortium Low Frequency Aperture Array (LFAA) LFAA System Requirements STFC (UK ATC) Prepared.
Installation and Commisioning SE view point Romuald Duperrier ESS SE manager.
SKA Status – Tango Collaboration Meeting Lize van den Heever June 2016.
Andrew Faulkner April 2016 STFC Industry Day: Low Frequency Aperture Array Andrew Faulkner Project Engineer.
Local Monitor And Control SADT.NMGR
An Iterative Method For System Integration
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Capability reporting Francesco Schillirò INAF- OACT
Technical Foundations & Enabling Technologies – DS4
INTEGRATING THE SKA-MPI DISH INTO MEERKAT
SADT Overall Summary Total ICD count is currently 37 system level ICDs across 6 Elements LFAA 3 ICDs DISHES 7 ICDs CSP 12 ICDs TM ? Unable to proceed.
PHAROS PHased Arrays for Reflector Observing Systems
SDP Interface Identification
Infrastructure Interface – Power, cooling & building
PSS verification and validation
Command and Data Handling
Presentation transcript:

SKA Interface Workshop: Dishes External Interfaces Thomas Kusel & Mark Bowen For Dishes consortium Manchester June 2013

Overview of this presentation 1)Approach 2)SKA_MID Dishes external interfaces 3)SKA_SURVEY Dishes external interfaces

SKA Interface Workshop: 1) Approach

Foundation of interface definitions Interface = boundary between “items” “items” are defined in the Product Breakdown Structure (PBS) Thus: the PBS is the foundation for all interface definitions. Without an agreed PBS, interface definitions are unstable.

Assumed SKA1 PBS

Developing ICDs Iterative approach, following the product development stages. (adopted by a number of consortia)

Developing ICDs Concept stage: Agree the critical requirements and implementation details first: Architecture drivers. Cost, performance & schedule drivers. Concept stage: Agree the critical requirements and implementation details first: Architecture drivers. Cost, performance & schedule drivers.

Developing ICDs Requirements / Prelim design stage: Next agree all the requirements + implementation details that are available. Typically, at this stage not all implementation details are available yet. Requirements / Prelim design stage: Next agree all the requirements + implementation details that are available. Typically, at this stage not all implementation details are available yet.

Developing ICDs Detail Design stage: Finally, make sure that all implementation details are agreed before finalising the detailed design. Detail Design stage: Finally, make sure that all implementation details are agreed before finalising the detailed design.

Interface Types Physical –Mechanical –Power & Earthing –Signal and Data Transport Functional –Signal –Control & Monitoring –Timing & Synchronisation Human / Machine Interfaces

SKA Interface Workshop: 2) SKA_MID Dishes External Interfaces

SKA_MID Dishes External Interfaces - overview SPFs RXs For each dish: Foundation (mechanical) Power & Earthing Signal data (functional & fibre) CAM (functional & fibre) Time & freq reference (functional & fibre) Maintainer/Operator (human/machine)

SKA1_MID Dishes External Interfaces Infrastructure Foundation: Structural: Forces, stiffness, etc. Ring bolts: configuration, tolerances, etc. Cable conduit entries Earthing NOTE: This interface will require close cooperation between the two teams during the design of the dish structure. SKA_MID Dish

SKA1_MID Dishes External Interfaces SKA_MID Dish Power Power supply: Power consumption & power factor Power quality (voltage, frequency, THD) Power reliability Earthing requirements (Ω to ground) Earthing connections Lightning surge protection: boundaries of responsibility NOTE: a lightning protection design is required on a system level for the power supply. Assumptions: Goal is for SKA_MID Dish to fit into a power budget (nominally 12kVA), based on existing infrastructure constraints. Power reticulation on the Dish forms part of the Dishes Element. Power will be interruptible, thus we need to make provision for UPS (for stow & network connectivity).

SKA1_MID Dishes External Interfaces Telescope Manager Control and Monitoring: of the following components: Dish Structure (pointing) Feed packages (SPF Band 1, 2, 3/4/5) + cryo system + helium system Receivers Dish Infrastructure (power, safety, etc.) NOTES: Agree on a protocol for CAM early. Agree on maximum # monitoring points (if this is an issue for TM). Fault reporting based on FMECA analysis. Antenna based LMC hardware and software required. CAM implementation must meet EMI/RFI requirements. SKA_MID Dish

SKA1_MID Dishes External Interfaces Central Signal Processor Digitized data: (functional interface) Data format, protocol & type. (7-layer ISO model) Details for the functional interface for each of the Receivers will be captured in ICDs. NOTES: This is a functional interface. Data transport is facilitated by the SaDT. SKA_MID Dish

SKA1_MID Dishes External Interfaces Signal & Data transport SKA_MID Dish Requirements: Synchronisation mechanisms (e.g. noise diode control) Performance requirements for synchronisation & timing links Data transport requirements for CAM and Observation data links NOTES: Clarify boundary of responsibility at the Dish for terminal equipment & on-Dish fibres: Observation data. CAM data. Synch & Timing signals. EMI/RFI compliance.

SKA1_MID Dishes External Interfaces Synchronisation & timing SKA_MID Dish Synchronisation & timing: Network absolute time (e.g. PTP) for pointing. High resolution absolute time reference (1pps + PTP) for data time stamping. Receiver down-conversion LO reference. Sampling clock. NOTES: See notes on SaDT – boundaries of responsibility need clarification.

SKA Interface Workshop: 2) SKA_SURVEY Dishes External Interfaces

SKA_Survey Dishes External Interfaces - overview PAFs Foundation (mechanical) Power & Earthing RF over Fibre (functional & fibre) Dishes CAM (functional & fibre) Dishes time & freq reference (functional & fibre) Maintainer/Operator (human/machine) Digitisers & beam formers Foundation Power & Earthing Cooling Signal Data (functional & fibre) Receivers CAM (functional & fibre) Receivers Time & freq reference (functional & fibre) RF over fibre Digital data enclosure dish

SKA1_SURVEY Dishes External Interfaces Infrastructure Dish foundation: same as for SKA_MID. Receiver enclosure : Foundation & earthing SKA_SURVEY Dish SKA_SURVEY Dish Receiver enclosure

SKA1_SURVEY Dishes External Interfaces Power supply to Dish: similar to SKA_MID dish Power supply to Receivers Enclosure: Power consumption & power factor Power supply configuration Power quality (voltage, frequency, THD) Power reliability Earthing requirements (Ω to ground) Earthing connections Lightning surge protection: boundaries of responsibility Some level of UPS is required. Power SKA_SURVEY Dish SKA_SURVEY Dish Receiver enclosure

SKA1_SURVEY Dishes External Interfaces Telescope Manager Control and Monitoring: of the following components at the Dish: Dish Structure (pointing) Feed packages (PAF Band 1, 2, 3) + PAF cooling system Dish Infrastructure (power, safety, etc.) Control and Monitoring: of the following components at the Receivers Enclosure: Receivers & Beam Formers Array Covariance Matrix (ACM) and beamformer weight generation. Enclosure infrastructure (cooling, power, safety, etc.) SKA_SURVEY Dish SKA_SURVEY Dish Receiver enclosure

SKA1_SURVEY Dishes External Interfaces Central Signal Processor Digitized data: Data format, protocol & type (7-layer ISO model). Details for the functional interface for each of the Receivers will be captured in ICDs. NOTES: This is a functional interface. Data transport is facilitated by the SaDT. SKA_SURVEY Dish Receiver enclosure

SKA1_SURVEY Dishes External Interfaces Signal & Data transport SKA_SURVEY Dish Requirements: Performance requirements for RF over fibre links (Dish to Enclosure) Performance requirements for synchronisation & timing links (Dish/Enclosure to S&T) Data transport requirements for digital observation data (Enclosure to CSP) Data transport requirements for CAM data links (Dish/ Enclosure to TM) NOTES: Clarify boundary of responsibility at the Dish and at the Receivers Enclosure, for terminal equipment & on-Dish fibres: RF over Fibre. CAM data. Synch & Timing signals. EMI/RFI compliance. SKA_SURVEY Dish Receiver enclosure

SKA1_SURVEY Dishes External Interfaces Synchronisation & timing Synchronisation & timing: Dishes: Network absolute time (e.g. PTP) for pointing. Calibration source timing. Receiver Enclosure: Sampling clock High resolution absolute time reference (1pps + PTP) for data time stamping. NOTES: See notes on SaDT – boundaries of responsibility need clarification. SKA_Mid and SKA_Survey boundaries may be different. SKA_SURVEY Dish SKA_SURVEY Dish Receiver enclosure

Conclusion 1)Boundaries of responsibility need some clarification. 2)Otherwise, no serious concept driving interface issues. –Will assume a power consumption limit for SKA_MID.