Uli Schäfer 1 Mainz R&D activities. Uli Schäfer 2 MZ R&D BLT has been built and tested (backplane transmission only). A few minor issues were found. Possible.

Slides:



Advertisements
Similar presentations
GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Advertisements

Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
GOLD down the drain Uli Schäfer 1 What’s left after Heidelberg.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Phase-0 Topological Processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
L1Calo – towards phase II Mainz upgraders : B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz, U.Schäfer, C.Schröder, E.Simioni, S.Tapprogge.
Programmable logic devices / tools Programmable logic devices are digital logic devices, providing combinatorial logic (gates, look-up tables) and flip-flops.
High-speed optical links and processors for the ATLAS Level-1 Calorimeter Trigger upgrade B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz,
ATLAS L1 Calorimeter Trigger Upgrade - Uli Schäfer, MZ -
GOLD Status and Phase-1 Plans Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer 1 BLT – status – plans BLT – backplane and link tester Recent backplane test results Test plans – week June 15.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Phase-1 with new JEP Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
JEM upgrades and optical data transmission to FEX for Phase 1 Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer 1 S-L1Calo upstream links architecture -- interfaces -- technology.
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
Phase-1 with new JEP Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 Mainz L1Calo upgrade activities news – BLT hardware/firmware status.
Uli Schäfer JEM0 Status (summary) 3 JEM0s up and running: JEM0.0 used for standalone tests only (Mainz) JEM0.1 fully qualified module0 JEM0.2 (like JEM0.1.
Uli Schäfer 1 JEM PRR Design changes Post-FDR tests FDR issues.
Uli Schäfer 1 (Not just) Backplane transmission options.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Uli Schäfer 1 JEM1: Status and plans Hardware status Firmware status Plans.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 (Not just) Backplane transmission options Uli, Sam, Yuri.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Uli Schäfer 1 CP/JEP backplane test module What’s the maximum data rate into the S-CMM for phase-1 upgrade ?
Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Uli Schäfer JEM Status and plans RAL test results Hardware status Firmware Plans.
Uli Schäfer JEM hardware / test JEM0 test programme Mainz standalone RAL sub-slice test JEM re-design Heidelberg slice test.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Uli Schäfer 1 (Not just) Backplane transmission options.
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
FEX Uli Schäfer, Mainz 1 L1Calo For more eFEX details see indico.cern.ch/getFile.py/access?contribId=73&sessionId=51&resId=0&materialId=slides&confId=
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
CMX (Common Merger eXtension module) Y. Ermoline for CMX collaboration Preliminary Design Review, Stockholm, 29 June 2011.
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
L1Topo Status & Plans Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, S.Krause, S.Moritz, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Hardware status GOLD Generic Opto Link Demonstrator Assess the use of optical backplane connectivity for use on L1Calo Uli Schäfer 1.
L1Topo-phase0 Uli Schäfer 1. Topo GOLD successfully used to explore technologies and initially verify 6.4Gb/s link integrity over moderate length electrical.
JFEX baseline Uli Schäfer 1 Uli. Intro: L1Calo Phase-1 System / Jets Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM.
Uli Schäfer 1 JEM Status and plans Hardware -JEM1 -Status Firmware -Algorithms -Status Plans.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
CMX status Yuri Ermoline for the MSU group Mini-TDAQ week, CERN, 9-11 July 2012,
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
S. Rave, U. Schäfer For L1Calo Mainz
Uli Schäfer 1 From L1Calo to S-L1Calo algorithms – architecture - technologies.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
JFEX Uli Schäfer 1. Constraints & Numerology Assumption: one crate, several modules. Each module covers full phi, limited eta range Data sharing with.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
Samuel Silverstein Stockholm University CMM++ firmware development Backplane formats (update) CMM++ firmware.
Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
16 February 2011Ian Brawn1 The High Speed Demonstrator and Slice Demonstrator Programme The Proposed High-Speed Demonstrator –Overview –Design Methodology.
L1Topo post review Uli Schäfer 1 Observations, options, effort, plans Uli.
GOLD TESTS (Virtex-6) ● Jitter analysis on cleaned TTC clock ( σ = 2.9 ps) ● Signal integrity: sampled in several positions along the chain ● MGT and o/e.
Multi-Gigabit transmission BLT  GOLD Andreas Ebling, Isabel Koltermann, Jonas Kunze Andi Ebling 1.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
Latency / Tilecal o/e converters VME extender Uli Schäfer 1.
ATLAS calorimeter and topological trigger upgrades for Phase 1
L1Calo upgrade discussion
Generic Opto Link Demonstrator
Possibilities for CPM firmware upgrade
Run-2  Phase-1  Phase-2 Uli / Mainz
(Not just) Backplane transmission options
Presentation transcript:

Uli Schäfer 1 Mainz R&D activities

Uli Schäfer 2 MZ R&D BLT has been built and tested (backplane transmission only). A few minor issues were found. Possible future firmware / test activities on the BLT: TTC clock / data recovery Multi-Gb/s links (opto inputs / outputs) SystemACE configuration scheme Hardware activities build another copy of the BLT, if required. Minor h/w fixes. Might act as CMM demonstrator. Dead end due to Virtex-5 chip. build a Generic Opto Link Demonstrator (GOLD) ATCA module Optical data replication on fibre (splitter/coupler) Optical feed-through from backplane O/E conversion and replication (CML fan-out) on module Array of moderately sized FPGAs (Virtex-6) Module control via serialized VME-- (optical) Bruno has started work...

Uli Schäfer 3 CMM++

Uli Schäfer 4 Some Remarks on CMM++ CMM++, as presented here, is an excellent scheme to combine a high performance, high link speed phase-1 backplane data extractor with a legacy daisy-chained merger. A demonstrator does actually exist already: BLT - electrical in, optical in/out. CMM++ concept seems to aim at full plug-in compatibility with the current system. However, the RTDP is just a fraction of a module. There are less exciting parts : VME / CAN / TTC /... For full s/w and maximum f/w compatibility these will probably have to be built along the current CMM scheme. Mainz style all-in-one-FPGA won’t be possible without major f/w and s/w effort.  Do we (who ?) want to spend that extra effort on plug-in compatibility ? What level of differences to current modules do we accept ?  Since we are probably talking production modules, the functionality required ( including backwards compatibility) will have to be discussed in a proper review procedure.

Uli Schäfer 5 Alternative roadmap Slightly different roadmap in case we do not spend effort on compatibility mode Do a demonstrator for global processor asap Could well be Mainz GOLD demonstrator based Include a compatibility mode that allows to bypass the processor and route the current L1Calo CTP signals through to the CTP (switchable per processor : cluster, jet, energy)  Request some space close to CTP already now ! For the time being, exercise the global processor with BLT based modules Build proper CMMs, based on Virtex-6 later (similar to the ones suggested today) Gradually change over from current L1Calo to phase1 processing by replacing CMMs and switching mode for the respective channels on the global processor