1 AS TAG Leaders Meeting Webex - Friday 18.06 S. Guiducci, M. Palmer.

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

BILCW07 - Feb 2007 Global Design Effort 1 RDB S3: Damping Rings R&D Junji Urakawa for Andrzej Wolski (Cockcroft Institute), Susanna Guiducci (INFN-LNF),
March 22, 2011 Mauro Pivi SLAC ALCPG11 Eugene Oregon March 19-23, 2011 Working Group plans.
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
AS Diagnostic Collaboration Mark Boland
ILC Damping Rings R&D Meeting: Cornell, September 2006 Andy Wolski University of Liverpool and the Cockcroft Institute 26 September, 2006.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
Ultra-Fast Damping Ring Kicker Modulator Development at SLAC Status update for ILC2010 C. Burkhart, A. Krasnykh, R. Larsen, & T. Tang March 27, 2010.
DR Kick-Off Meeting CI, 5 Nov 2007 Global Design Effort 1 Damping Rings Update (after the RDR) Andy Wolski.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
September 12, 2011 Global Design Effort 1 ILC Damping Ring Activities Cornell Group Mark Palmer GDE.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
Working group on Damping rings, ATF and CESRTA October 20 th, 2010 S. Guiducci (INFN/LNF), M. Palmer (Cornell), Y. Papaphilippou (CERN), J. Urakawa (KEK/ATF)
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
Nov 17, 2009 Webex Assessing the 3.2 km Ring feasibility: Simulation parameters for electron cloud Build-up and Instability estimation LC DR Electron Cloud.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Damping Rings Lattice Evaluation Mark Palmer Cornell University January 19, 2011.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Damping Ring Specifications S. Guiducci ALCPG11, 20 March 2011.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
DR Kicker R&D: Goals and Work Scope
Mark Palmer for the CESRTA Collaboration
Fast Kicker R&D in the Americas Region
Junji Urakawa (KEK) for ATF International Collaboration
Agenda Today: Electron cloud build-up in Wigglers – Theo Demma
Damping Ring Summary S. Guiducci, M. Palmer, M. Pivi, J. Urakawa
LER 2010 Overview (and other)
Agenda Today: CesrTA and SuperKEKB simulations - Ohmi
ILC DR instability simulations
Andy Wolski University of Liverpool and the Cockcroft Institute
M. Biagini, S. Guiducci ECLOUD WG webex meeting December 15, 2009
ILC DR instability simulations
ILC Damping Ring electron cloud WG effort
CLIC damping rings working plan towards the CDR
Barry Barish Paris ICHEP 24-July-10
Session Introduction & Damping Rings Baseline Lattice Decision
ILC DR instability simulations
DR Session Introduction
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer

2 AS TAG Leaders Meeting Friday TDP-2 planning (R&D Plan Update) Homework (Nick’s points): 1. Critical R&D goals - Current ongoing programmes - goals, milestones etc. - Important to identify R&D that will go beyond end 2012 (post TDR); this includes identified R&D that is not currently not funded. 2. ADI (assume SB2009-like baseline) - Status of design and design documentation - state of lattice files, component definitions (lists) etc. - scope of possible new cost estimation (RDR update), see comments below) 3. R&D Plan Appendix B - Review and consolidation of Work Package descriptions (resources!), bringing them into line with TDR plans.

3 Critical R&D goals 1.E-cloud mitigation ( CesrTA program and ECLOUD WG) End 2010 (ready for BAW2 meeting Jan 2011) –Recommendations on e-cloud mitigations for 6 ns bunch spacing –Comparison between 6 ns and 3 ns bunch distance in 3 km DR Mid 2011 –Detailed report of e-cloud working group –CesrTA Phase I EC report CesrTA Phase II –Electron cloud R&D and Incorporation into DR design (continuing up to end of 2013) 2013 CesrTA Phase II –Extended program to take advantage of the effort done and get further incremental info to refine the plan

4 Critical R&D goals 2.Demonstration of 2 pm vertical emittance A vertical emittance of ~ 2 pm has been achieved in synchrotron light sources (Diamond, ASP, SLS) The ATF low emittance goal could be remodulated, a proposal for the next ATF/ATF2 Collaboration Meeting It is considered important to demonstrate the 2 pm in the extraction line (not only in the storage ring) The deadline could be moved to the end of 2012

5 Critical R&D goals 1.Fast kickers Already demonstrated –Rise/fall time for 3 ns bunch spacing (KEK) –Kick angle stability in single bunch extraction (KEK) –Very clean pulse shape, no post-pulse for SLAC pulse modulator) Next steps –Kick angle stability in multi bunch extraction at 3 MHz (KEK) (March 2011) –Complete and test a SLAC pulse modulator prototype (2011) –Evaluate kickers impedance contribution (LNF) (mid 2011)

6 ADI 1.Status of design and design documentation for 3.2 km DR Present DSB3 lattice –Used for e-cloud evaluations (still needs dynamic aperture optimization) –MAD file on Cornell wiki site –Element file sent to Norbert Collomb for layout drawing –Magnets file to Peter Garbincius for cost estimate Work on the lattice –In progress at LNF and IHEP (IPAC10 papers) –A lattice choice is expected before the end of Status of design and design documentation for 6.4 km DR –4 papers presented at IPAC10 (CI) –Detailed notes are in preparation –3D drawings given to CFS

7 R&D Plan Appendix B DR Organization Test Facilities –ATF test facility (Nobuhiro Teranuma) –CesrTA test facility (Mark Palmer) Working groups –ECLOUD Working Group (Mauro Pivi) –ILC-CLIC Working Group (Mark Palmer, Yannis Papaphilippou) For the other activities it has been suggested to have: – a Table with a list of the labs involved and the activities for each lab – a contact person for each lab