16-Nov-08 ILC08 - Chicago Global Design Effort 1 Barry Barish ILC08 - Chicago 16-Nov-08 GDE Status, Overview and Plans ATF-2 Final Doublet System ATF-2.

Slides:



Advertisements
Similar presentations
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Advertisements

3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 1 Barry Barish 2 nd Asian ILC R&D Seminar 29-September-08 Progress toward the ILC ATF-2.
20-Jan-09 Madrid, Spain Global Design Effort 1 Barry Barish Madrid, Spain 20-Jan-09 Designing the ILC ATF-2 Final Doublet System.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
17-April-09 TILC09 Global Design Effort 1 Barry Barish TILC09 – Tsukuba, Japan 17-April-09 ILC / GDE Report Electron Cloud at CesrTA.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
1 Global R&D Effort in the Technical Design Phase for the ILC I. Overview II. Superconducting RF Development Akira Yamamoto (KEK) for the ILC-GDE Project.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
14-Feb-08 HEPAP Global Design Effort 1 Navigating the Bumpy Road to the ILC Barry Barish GDE Workshop - Sendai 3-March-08.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
11 June 07 Fermilab Steering Group 1 ILC Baseline Schedule, Milestones, and Decision points Tom Himel.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
2-March-09 SiD Meeting - SLAC Global Design Effort 1 Barry Barish SiD Meeting – SLAC 2-March-09 ILC Report.
Status of the ILC Brian Foster (Oxford & GDE) PECFA Meeting CERN 27/11/09.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Mike Harrison LCFOA meeting July 08 Americas ILC Status - Baseline Design Gev e+ e- Linear Collider Energy 250 Gev x 250 Gev Length km.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
Barry Barish LCWS12 Arlington, TX 22-Oct-12 ILC – Status, TDR and Costs Global Design Effort 1 22-Oct-12 LCWS12 - Arlington, TX TDR Part I: R&D TDR Part.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
28-Jan-08 SiD Workshop Global Design Effort 1 ILC Status Impacts of US/UK Budget Actions Replan for GDE Technical Design Phase Barry Barish SiD Workshop.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
April 29, 2009 M. Ross for PM Global Design Effort 1 GDE Global Program Marc Ross for: Akira Yamamoto, Nick Walker GDE Project Managers Risk Reduction.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
17-21 April 09 AAP - Tsukuba Global Design Effort 1 First Results of Geological Investigations of Dubna Siting of Dubna Siting Status of the ILC activity.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
26-Sept-11 LCWS - Granada Global Design Effort 1 Barry Barish LCWS11 - Granada 26-Sept-11 Global Design Effort ILC R&D and Technical Design Grooved Insert.
Barry Barish LCWS10 - Beijing 26-March-10
ILC Global Design Effort
Barry Barish GDE Caltech
Nick Walker (DESY) EU GDE Meeting Oxford
Barry Barish LCWS10 - Beijing 26-March-10
Barry Barish JSPS - Sendai 12-Sept-11
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

16-Nov-08 ILC08 - Chicago Global Design Effort 1 Barry Barish ILC08 - Chicago 16-Nov-08 GDE Status, Overview and Plans ATF-2 Final Doublet System ATF-2 Beamline

16-Nov-08 ILC08 - Chicago Global Design Effort 2 2 Present status of global effort Plans for 2009 and beyond Status of R&D programs Minimum Machine Design Studies ILC/CLIC Collaboration Rebuilding the U.S. ILC R&D Program Conclusion Outline

16-Nov-08 ILC08 - Chicago Global Design Effort 3 ILC Reference Design 3

16-Nov-08 ILC08 - Chicago Global Design Effort 4 Detector Concepts Report

16-Nov-08 ILC08 - Chicago Global Design Effort 5 detector B may be accessible during run accessible during run Platform for electronic and services (~10*8*8m). Shielded (~0.5m of concrete) from five sides. Moves with detector. Also provide vibration isolation. Push-Pull Concept for two detectors The concept is evolving and details being worked out detector A

16-Nov-08 ILC08 - Chicago Global Design Effort 6 Oct 30, th ICFA Seminar Global Design Effort 6 BLACK DECEMBER 2007 Without warning, severe budget cuts in the USA and the UK –In UK, we preserved support for key scientists and their teams, but lost broader program (40 FTE to ~ 15 FTE) –In US, budget reduced FY98 to $15M, essentially already spent last December. The US program has effectively been on hold for 9 months. Global Program has impressively moved on in the face of these devastating problems –The core of our program is focused on large R&D facilities; Global collaboration increased toward prioritized goals

16-Nov-08 ILC08 - Chicago Global Design Effort 7 Next: Build a Solid Technical Design Complete crucial R&D to reduce technical risk –SCRF gradient; final focus; electron cloud Optimize the ILC design for coherence, simplicity and cost / performance –Minimum Machine Develop capability to industrialize, construct ILC worldwide and develop international model for governance –Project Implementation Plan

16-Nov-08 ILC08 - Chicago Global Design Effort 8 ILC-GDE Organization Chart SCRF -ML G-CFS AS EU AM AS ILCSCFALC ILC-GDE Director Regional Directors Project Managers AAP PAC FALC-RG Director’s Office = ~ Central Team = ~ EC Experts Project. M. Office - EDMS - Cost & Schedule - Machine Detector Interface - ILC, XFEL, Project X liaison - ILC Communications

16-Nov-08 ILC08 - Chicago Global Design Effort 9 9 R&D Plan - Technical Design Phase First Official Release June 08 A 50 page document with details of all programs and schedules Next review and release: December 08 Global Design Effort

16-Nov-08 ILC08 - Chicago Global Design Effort 10 Global Design Effort 10 Major R&D Goals for TDP 1 SCRF High Gradient R&D - globally coordinated program to demonstrate gradient for TDP by 2010 with 50%yield; 90% yield by 2012 ATF-2 at KEK Demonstrate Fast Kicker performance and Final Focus Design Electron Cloud Mitigation – (CesrTA) Electron Cloud tests at Cornell to establish mitigation and verify one damping ring is sufficient. Minimum Machine Studies Studies of possible cost reduction designs and strategies for consideration in a re-baseline in 2010

16-Nov-08 ILC08 - Chicago Global Design Effort 11 Oct 30, th ICFA Seminar Global Design Effort 11 Status of 9-Cell Cavity R&D Europe “Gradient” improved ( MV/m) with Ethanol rinse (DESY): Industrial (bulk) EP demonstrated ( MV/m) (DESY) Large-grain cavity (DESY) Surface process with baking in Ar-gas (Saclay) America(s) Gradient distributed (20 – 40 MV/m) with various surface process (Cornell, JLab, Fermilab) Field emission reduced with Ultrasonic Degreasing using Detergent, and “Gradient” improved (JLab) Asia “Gradient” demonstrated, 36MV/m (LL, KEK-JLab), and 28 MV/m (TESLA-like in cryomodule, KEK) High gradients achieved in all regions but still with variable yield 11 Global Design Effort

16-Nov-08 ILC08 - Chicago Global Design Effort 12 Oct 30, th ICFA Seminar Global Design Effort 12 New -- Optical Inspection System camera white LEDhalf mirror EL mirror motor & gear for mirror camera & lens sliding mechanism of camera tilted sheet illumination by Electro-Luminescence perpendicular illumination by LED & half mirror Camera system (7µm/pix) in 50mm diameter pipe. For visual inspection of cavity inner surface. ~600µm beads on Nb cavity 12 Iwashita (Kyoto) and Hayano (KEK) et al. Global Design Effort DESY starting to use this system in cooperation with KEK

16-Nov-08 ILC08 - Chicago Global Design Effort 13 Global R&D Plan Consensus in SCRF-TA 13 Calender Year Technical Design Phase TDP-1TDP-2 Cavity Gradient R&D to reach 35 MV/m Process Yield > 50% Production Yield >90% Cavity-string test: with 1 cryomodule Global collab. System Test with beam 1 RF-unit (3-modulce) FLASH (DESY) STF2 (KEK) NML (FNAL) ?

16-Nov-08 ILC08 - Chicago Global Design Effort 14 SCRF: Plug Compatibility R&D Phase Need to continue and encourage R&D effort to improve the “gradient” performance,Need to continue and encourage R&D effort to improve the “gradient” performance, “Improvement” comes from “some change”, for example,“Improvement” comes from “some change”, for example, –Cavity Type: Tesla, Low-loss, Re-entrant –Material: Fine-grain or large grain –Surface treatment: EP, Rinsing, –Tuner type: Blade, Jack, etc., –Input-coupler: how to simplify the assembly Construction Phase Need to keep multiple, regional participation and industrial competitionNeed to keep multiple, regional participation and industrial competition

16-Nov-08 ILC08 - Chicago Global Design Effort 15 S1 Global Tests Cavity integration and the String Test globally organized with tests to be done at KEK STF facilityCavity integration and the String Test globally organized with tests to be done at KEK STF facility –2 cavities from DESY and Fermilab –4 cavities from KEK –Each half-cryomoducle from INFN and KEK

16-Nov-08 ILC08 - Chicago Global Design Effort 16 Global R&D Plan Consensus in SCRF-TA 16 Calender Year Technical Design Phase TDP-1TDP-2 Cavity Gradient R&D to reach 35 MV/m Process Yield > 50% Production Yield >90% Cavity-string test: with 1 cryomodule Global collab. System Test with beam 1 RF-unit (3-modulce) FLASH (DESY) STF2 (KEK) NML (FNAL) ?

16-Nov-08 ILC08 - Chicago Global Design Effort 17 9mA Experiments in TTF/FLASH XFELILCFLASH design FLASH experiment Bunch chargenC # bunches3250 * * 2400 Pulse length ss CurrentmA5999

16-Nov-08 ILC08 - Chicago Global Design Effort 18 Goals of 9mA test Demonstrate energy stability <0.1% (LLRF) with high beam- loading –Bunch to bunch –Pulse to pulse –Over many hours Evaluate operation close to cavity limits –Quench limits –Impact of LFD, microphonics etc. Evaluate LLRF performance –Required klystron overhead –Optimum feedback / feedforward parameters –Exception handling (development) –Piezo-tuner performance etc. Evaluate HOM absorber (cryoload) Controls development –Software & algorithm development for ATCA (XFEL) LLRF system

16-Nov-08 ILC08 - Chicago Global Design Effort 19 Global R&D Plan Consensus in SCRF-TA 19 Calender Year Technical Design Phase TDP-1TDP-2 Cavity Gradient R&D to reach 35 MV/m Process Yield > 50% Production Yield >90% Cavity-string test: with 1 cryomodule Global collab. System Test with beam 1 RF-unit (3-modulce) FLASH (DESY) STF2 (KEK) NML (FNAL) ?

16-Nov-08 ILC08 - Chicago Global Design Effort 20 Global Design Effort 20 Damping Ring R&D DR has a flexible race track design –6.4 km Circumference with >1 km straights, which contain, RF, Wigglers, Chicanes, Injection/ Extraction Systems There are two critical components which require a successful demonstration in TDP1 –Fast Inj/Ext Kickers –Suppression of e- Cloud in the e+ ring

16-Nov-08 ILC08 - Chicago Global Design Effort 21 Electron Cloud – Simulation Results SLAC

16-Nov-08 ILC08 - Chicago Global Design Effort 22 Tests at CESR -- Reconfiguration Electron Cloud Diagnostics –L3 region prepped for arrival of PEP-II EC hardware including diagnostic chicane Hardware being removed at SLAC Delivery to Cornell in November –New EC experimental regions in arcs w/ locations for collaborator VCs –L0 region reconfigured as a wiggler straight Instrumented with EC diagnostics Wiggler chambers with retarding field analyzers (fabricated at LBNL) - scheduled for installation ~Oct 23rd Chambers with EC mitigation (TiN coatings by SLAC) CESR Ring L0 Wiggler CLEO Re-commissioning for operations through Oct 27th CesrTA dedicated experiments: Oct 27-Nov 10 Electron Cloud Experiments, Low Emittance Operation, X-ray Beam Size Monitor

16-Nov-08 ILC08 - Chicago Global Design Effort 23 Photo-cathode RF gun (electron source) S-band Linac  f ECS for multi-bunch beam Extraction line ATF2 beam line (2008~) This a scaled down version of the ILC Beam Delivery System Damping Ring Accelerator Test Facility – ATF/ATF2 KEK Laboratory

16-Nov-08 ILC08 - Chicago Global Design Effort 24 ATF / ATF2 R&D Program and Goals Beam delivery system studies –Demonstrate ~ 50 nm beam spot by 2010 –Stabilize final focus by 2012 Broad international collaboration (mini-ILC) for equipment, commissioning and R&D program Commissioning this fall ATF2 Beam Line vacuum pipe connected in October

16-Nov-08 ILC08 - Chicago Global Design Effort 25 Minimum Machine Design Effort “Minimum Machine” refers to a set of identified options (elements) which may simplify the design and be cost- effective 25 1.Klystron Cluster concept 2.Central region integration 3.Low beam power option 4.Single-stage compressor 5.Quantify cost of TeV upgrade support 6.“Value engineering” 7.Single-tunnel solution(s)

16-Nov-08 ILC08 - Chicago Global Design Effort 26 Identified Minimum Machine Elements

16-Nov-08 ILC08 - Chicago Global Design Effort 27 Main Linac & Support Tunnel RDR (two-tunnel) –Access to equipment during ops Reliability/availability Shallow sites –Cut and cover like solutions –“service tunnel” on the surface Single tunnel –European XFEL-like solution availability / reliability 27

16-Nov-08 ILC08 - Chicago Global Design Effort 28 Klystron Cluster Concept RF power “piped” into accelerator tunnel Removal of service tunnel Access to klystrons & modulators maintained R&D needed to show power handling –Planned (SLAC, KEK) 28 SLAC Feeds +/- 1 km of linac

16-Nov-08 ILC08 - Chicago Global Design Effort 29 IR Integration (old location) CHALLENGES: Optimize IR and detector design ensuring efficient push-pull operation Agree on Machine- Detector division of responsibility for space, parameters and devices LOI Process is Crucial

16-Nov-08 ILC08 - Chicago Global Design Effort 30 US Program --- P5 Report “The panel recommends for the near future a broad accelerator and detector R&D program for lepton colliders that includes continued R&D on ILC at roughly the proposed FY2009 level in support of the international effort. This will allow a significant role for the US in the ILC wherever it is built.” Proposed FY2009 Budget = $35.3M (caveat – continuing resolution)

16-Nov-08 ILC08 - Chicago Global Design Effort 31 US ILC Status Following the P5 recommendations, the ILC R&D program the US ILC FY09 baseline budget was established at $35.3M This was reduced to $29.5M due to the CR. This is an effective rate of 84% which is equal to the overall reduction in OHEP funding. This is sufficient to restart. Guidance at this level was send out at the start of FY09 and work is now ramping up at the national labs. We had managed to maintain the CESR TA program with NSF funding, a skeleton SRF gradient program, and certain elements of the GDE. Current CR planning is assuming that the CR goes away in March. With the resumption of funding we are starting to work on the US program for the balance of the R&D phase (2010 -> 2012)

16-Nov-08 ILC08 - Chicago Global Design Effort 32 CR Plan - Impact Fermilab: hold labour and reduce M&S by $1.3M Delay some CFS consultant contracts Delay some cryomodule parts purchases Remove S1 global dressed cavities – in principle (if the CR goes away in 6 months) there is no impact to this change Nickel and dime SLAC: slow down and/or delay manpower ramp up and reduce M&S ATF2 (at KEK) fully supported HLRF system development slowed down Slow down accelerator physics and tilt towards CESR TA support Nickel and dime

16-Nov-08 ILC08 - Chicago Global Design Effort 33

16-Nov-08 ILC08 - Chicago Global Design Effort 34 Project Implementation Plan

16-Nov-08 ILC08 - Chicago Global Design Effort 35 Final Remarks The global ILC R&D program has proven resilient to the budget crisis We are now in the technical design phase, which will culminate in 2012 with completion of crucial R&D and optimized cost / performance / risk design The US ILC program is being re-integrated and we now need to develop a new long range strategy for that program Collaborative work with CLIC is strengthening our effort. It will help prepare the community toward making a strong proposal for a linear collider when the science case is justified by LHC.