The NBS BIM Toolkit Dr Stephen Hamil – Director of Design and Innovation.

Slides:



Advertisements
Similar presentations
Design Guidelines for Primary and Social Care focus on the Modernisation agenda integration of care: Traditional GP services Community services Social.
Advertisements

Hussey Fraser Solicitors
Government Construction Strategy (for England)
The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex.
Enabling you for BIM (Building Information Modelling)
Procurement Client-Based Approach Siân Mathews, Strategic Partnership Advisor, Skills Strategy 2011.
© 2012 Autodesk BIM Collaboration Siva Koppula Technical Consultant.
RIBA Plan of Work 2013.
Chapter 3 Project Initiation
BIM Sarah Birchall and Jo Harris 25 th September 2014.
BIM Software for Construction. - Twitter Web &
The countdown to 2016: Your action list to be ready
Procurement Journey 20 November 2014.
Dan Rossiter BIM Team, BRE Wales 26th of September, 2014
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
1 Public Entities Risk Management Forum Office of the Accountant General National Treasury Project Risk Management Jeets Hargovan Government Technical.
International User Group Information Delivery Manuals: General Overview Courtesy:This presentation is based on material provided by AEC3 and AEC Infosystems.
January 2013 BIM the cost of sustainability BIM And the cost of sustainability Delivering sustainability.
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1 August 15th, 2012 BP & IA Team.
BIM Execution Planning (BEP)
The BIM Project Execution Planning Procedure
What was BIM4Real? The Project.
Communicating Cutting Tool Data Using ISO13399 Bengt Olsson Project Manager Competence Center PLM Sandvik Tooling
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
The Lean Sourcing Process
Complete and Integrated Lifecycle Management. Challenges 1.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Good practice in Research Data Management Module 6: Tools, training and support.
KB+ & GOKB: THE KUALI OLE COMMUNITY MODEL FOR E- RESOURCES MANAGEMENT Sponsored by Owen Stephens – Owen Stephens Consulting Michael Winkler – University.
The Tao of Measurement GeoBusiness 2015
The BIM Toolkit Stephen Hamil – March 2015 – v2.0.
Global APC Content Review Project Update February 2015.
International User Group P07 BIM Guidelines Sylvain MARIE, IDM Coordinator, French Speaking chapter buildingSMART Process Room Stockholm, March 19, 2014.
NIEM Blue Team Presentation April 20, 2010 Phil Letowt, Mini Kanwal, Ken Sall, David Webber ICE OCIO / Task ASAS ICE Information Exchange Reuse with NIEM.
Procurement, Capital and Shared Assets Workstream Cllr Paul Bettison Andrew Smith OBE Friday 3 rd December
North East Lincolnshire Council delivering change through partnership ( Physical Regeneration, Property and Technical Services Partnership) Planning in.
1 Excellence in Product Development. 10 th July BIFM Application.
With LMG Secretariat Future Processing Model Working Group Introduction Simon Collins 18 th March 2010 With London Market Group.
November 25, 2015 © IBM Corporation Unified Method Framework (UMF) RMC Reference Architecture Overview Kelli Houston
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
The future of Statistical Production CSPA. 50 task team members 7 task teams CSPA 2015 project.
“The changing data market” David Jellings Director, The OPEN BIM Network.
Social Value in Procurement Andy Brewin - National Business Manager.
UDIA HOT TOPICS – STRUCTURE PLANNING REFORM & LIVEABLE NEIGHBOURHOODS REVIEW 26 SEPTEMBER 2012 PAUL ELLENBROEK PROJECT MANAGER – LIVEABLE NEIGHBOURHOODS.
buildingSMART Data Dictionary
June 2007Office of Federal Environmental Executive Symposium a data standard for use with construction specifications Bill Brodt Facilities Engineering.
Copyright 2008, Open Geospatial Consortium Making Location Count The Quantity Take-off Thread Early Design Quantity Take-off.
Transparency of payments to healthcare professionals: ABPI plans for a central platform for individual disclosures 2016 June 2014.
1 | Nick Nisbet COBie in the UK Federated Building Information Modelling HMG BIM Working Group Technical Coordinator, buildingSMART UKI.
Provisional view of the Procurement Strategy Phil Bennett Commercial Director.
OGC Copyright 2008, Open Geospatial Consortium Making Location Count Building Performance and Energy Analysis (BPEA) Thread 1.Definition of Early Design.
BIM & THE EVOLUTION OF SPECIFICATIONS: Access to Information Kerin Dodd-Hansen, ARA, FCSI, CCS, SCIP Architect Chair, CSI BIM Steering Committee The Dodd-Hansen.
Breakout Session 3 QHSE Strategic Risk Management.
Richard Petrie CEO buildingSMART.
BIM Terminology Explained BIM Masterclass & Technical Workshop 2015.
The BIM Toolkit – An introduction. Overview UK Government Level-2 BIM BIM Toolkit – Technical content BIM Toolkit - Functionality.
CAB Technical Committee BIM Working Group
Integration of BIM in Lithuania
A digital tool for building information modelling
BIM2, BIM3 and technical information connections
SUPPLY CHAIN COLLABORATION A Practical Example
KEYNOTE STAGE SPONSOR.
LCI – Supply Chain Collaboration
The Lean Sourcing Process
Data Templates For Information Exchange December 2017
Michelle Papayannakos
CIC BIM Competition Presentation Template & Content Guide
Industry Engagement Program Medical Diagnostic Imaging (MDI) Equipment
Delivering Successful Outcomes
Stage Gate Process Template
Presentation transcript:

The NBS BIM Toolkit Dr Stephen Hamil – Director of Design and Innovation

The NBS BIM Toolkit Introduction 1.The Level-2 BIM journey 2.Digital plan of work 3.Verification

1. The Level-2 BIM journey

How to traditionally describe construction dataPLQ: How Many Legs Do I Have?

Putting too much information into the model too soon may restrict both the design and supply chain options for others in the team and leads to other forms of waste with the inherent costs incurred by both the supplier and the client. It also places constraints on the supply chain to offer compliant alternative designs, offering better asset or value performance. DPOW = Goldilocks Principle

2. Digital plan of work

The NBS BIM Toolkit – The Team Core team Steering team Clients

The Level-2 BIM package How will the BIM Toolkit benefit those working within the level-2 BIM process? Standards are freely available at - Standards are freely available at -

Assessment and need Procurement Post-contract award and mobilisation Production Maintenance and use Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013 Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013

Assessment and need

Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013 Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013 Assessment and need

Overview Client determines their plain language questions (determines the need) Client produces their employer’s information requirements (Required information to meet the needs as defined in PLQs) Information requirements aligned to the project stages This is part of the tender documentation

A collection of projects A collection of projects

Information at a project level

Information at a stage level Information at a stage level

At the start of the project the client has not assembled their team

At strategy/brief stage it is possible to determine information needs

Template tasks can be modified, removed and added to

These projects can be refined and reused on future projects

Tasks and deliverables are assigned to roles prior to the team being assembled This information may be exported

Export to MS Excel for inclusion within the EIR document (PDF) …and export to IFC/COBie for digital re-use

All information can exported and manipulated either in buildingSMART or MS Excel format

At a basic level – it can easily be inserted into an MS Word EIR

Procurement

Overview Bidders respond with their pre-contract BIM execution plan Proposed responsibility of bidders supply-chain is provided The client can compare these against their original information requirements Selection can take place

The proposed roles have been assigned The proposed project team has been added Each item, at each stage has a party responsible The bidder

Export to MS Excel for inclusion within the BEP document (PDF) …and export to IFC/COBie for digital re-use

Pre-contract award and mobilisation

Post-contract award and mobilisation

Production

Overview The federated Project Information Model begins to grow dPOW defines the what, the when and who Information exchanges between supply-chain Information delivery to the client as agreed in EIR Documented classification and data structure allows for verification

Moving into the design phases the team is now assembled and the information requirements grow

Level of detail guidance can be defined for each deliverable

Level of information guidance can be defined for each deliverable

A definitions library of over 5,700 items across all construction disciplines will be provided

At concept stage – the operations phase should be considered

At the technical design stage more geometric detail is required

The level of information grows through the bandings too

LOI-6 contains the standard COBie properties for transfer to the asset management systems

Steel stair systems

Concrete pilecap system

Steel framing system

Roof framing system

Concrete underpining systems

RICS were part of the core team and have provided classification mappings to NRM1

Rules of measurement from RICS NRM1 Rules of measurement from RICS NRM1

Benchmark costs from RICS BCIS Benchmark costs from RICS BCIS

Filter by Uniclass 2015 classification tables

At an early stage space requirements may be specified

Classification – Uniclass 2015

Browse classifications

Classification tables widget

Advanced search technology is used to take the complexity away from classification

What has been asked for What has been asked for What has been provided What has been provided

Maintenance and in use

Maintenance and use

-ID -ParentSpace -Level -Manufacturer -Model -ExpectedLife -O+M-Manual -ID -ParentSpace -Level -Manufacturer -Model -ExpectedLife -O+M-Manual

3. Verification & Validation of BIM Submissions

Overview & Background R&D funded by Innovate UK Built on the xBIM platform Open source toolkit for open BIM Led by BIM Academy at Northumbria Developed by the XbimTeam Collaborative BIM development Built on BuildingSmart data model – IFC Community based, royalty free.

COBie, IFC COBie Submission COBie, IFC COBie Requirements

COBie, IFC COBie Submission COBie, IFC COBie Requirements

COBie, IFC COBie Submission COBie, IFC COBie Requirements

COBie, IFC COBie Submission COBie, IFC COBie Requirements

COBie, IFC COBie Submission COBie, IFC COBie Requirements

Simple Submission Report

Community support needed xBIM is an Open Platform Royalty free, open source Several key organisations actively engaged 4Projects, NBS, AEC3, Metz Architects, eDocuments, B&ES Designed and built on, and for, IFC No Compatibility or portability issues Construction & IT industry engagement welcomed

The NBS BIM Toolkit An industry story

Summary

The NBS BIM Toolkit Summary 1.A clear central strategy for information procurement 2.A free-to-use digital plan of work tool for UK Level-2 BIM 3.Verification of information using well-structured open data

The NBS BIM Toolkit theNBS.com/BIMToolkit