Thomas Jefferson National Accelerator Facility Page 1 CLAS12 Workshop Jefferson Lab February 23, 2016 Time-of-Flight Software Status Jerry Gilfoyle, Evgeny.

Slides:



Advertisements
Similar presentations
Proposal for a new design of LumiCal R. Ingbir, P. Ruzicka, V. Vrba October 07 Malá Skála.
Advertisements

VETO Analysis Update Michael Wood University of Massachusetts, Amherst Outline Introduction and basics Reconstruction packages Efficiencies Simulation.
Thomas Jefferson National Accelerator Facility Page 1 Internal Software Review Jefferson Lab November 6-7, 2014 Hall B:User Software Contributions Gerard.
Thomas Jefferson National Accelerator Facility Page 1 CLAS12 Software User Environment Introduction: Software tasks, users, projects. Tools. Simulation.
FToF Status Report CLAS Collaboration Meeting1 Test Results, Ongoing Work, Still To-Do, and More … FToF Progress Report CLAS Collaboration Meeting June.
March 31, Status of the TOF, Ckov and Virtual Detector Packages in G4Mice Steve Kahn Brookhaven National Laboratory Mice Collaboration Meeting March.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
Stephen KahnParticle ID Software Mice Collaboration Meeting Page 1 Particle ID Software Steve Kahn Brookhaven National Lab 27 March 2003.
27 Jun 2005S. Kahn -- Tof/Ckov Status1 Status of TOF and Ckov Sub- packages in G4Mice Steve Kahn 27 June 2005.
experimental platform
The Time-of-Flight system of the PAMELA experiment: in-flight performances. Rita Carbone INFN and University of Napoli RICAP ’07, Rome,
STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
Thomas Jefferson National Accelerator Facility Page 1 CLAS12 Software D.P. Weygand Thomas Jefferson National Accelerator Facility.
Central Neutron Detector March ’11 Update Central Neutron Detector March ’11 Update Daria Sokhan IPN Orsay CLAS 12 GeV Workshop Paris, France – 9 th March.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
CLAS12 CalCom Status Update CLAS Collaboration Meeting November 14, 2014.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
A Reconstruction Algorithm for a RICH detector for CLAS12 Ahmed El Alaoui RICH Workchop, Jefferson Lab, newport News, VA November th 2011.
Medium heavy Λ hyper nuclear spectroscopic experiment by the (e,e’K + ) reaction Graduate school of science, Tohoku University Toshiyuki Gogami for HES-HKS.
ALCPG Simulation Status and Plans ACFA LC Workshop, Taipei Nov. 10, 2004 Norman Graf (SLAC)
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
The GlueX Detector 5/29/091CIPANP The GlueX Detector -- David Lawrence (JLab) David Lawrence (JLab) Electron beam accelerator continuous-wave (1497MHz,
Analysis strategy of high multiplicity data Toshiyuki Gogami 24/Feb/2011.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Thomas Jefferson National Accelerator Facility Page 1 12 GeV Software and Computing Review Jefferson Lab February 10-11, 2015 Hall B:User Experience and.
The BESIII Offline Software Weidong Li Institute of High Energy Physics, Beijing Workshop on the cooperation of PRC-US in HEP 16 June 2006.
SoLID simulation Zhiwen Zhao Uva SoLID Collaboration Meeting 2011/6/2 1.
Non-prompt Track Reconstruction with Calorimeter Assisted Tracking Dmitry Onoprienko, Eckhard von Toerne Kansas State University, Bonn University Linear.
Overview Maurizio Ungaro 1HPS Collaboration meetingOctober Status, Future of GEMC.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
November 2013 Review Talks Morning Plenary Talk – CLAS12 Software Overview and Progress ( ) Current Status with Emphasis on Past Year’s Progress:
1 Energy loss correction for a crystal calorimeter He Miao Institute of High Energy Physics Beijing, P.R.China.
CEBAF The Continuous Electron Beam Accelerating Facility(CEBAF) is the central particle accelerator at JLab. CEBAF is capable of producing electron beams.
1 Lead glass simulations Eliane Epple, TU Munich Kirill Lapidus, INR Moscow Collaboration Meeting XXI March 2010 GSI.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Thomas Jefferson National Accelerator Facility Page Hall B:User Software Contributions Gerard Gilfoyle University of Richmond 12 GeV Upgrade Software Review.
Frank L. H. WolfsDepartment of Physics and Astronomy, University of Rochester Status of the TOF February 22, 2001 Straight-line tracking What have we learned?
SoLID simulation with GEMC Zhiwen Zhao 2015/03/26.
Performance simulations with a realistic model of the CBM Silicon Tracking System Silicon tracking for CBM Number of integration components Ladders106.
Particle Identification at BESIII Kanglin He April 23, 2007, Amsterdam.
Optics, Tracking, and TOF Status/Update/Roadmap Xin Qian KRL Caltech.
Digitization and hit reconstruction for Silicon Tracker in MarlinReco Sergey Shulga, Tatiana Ilicheva JINR, Dubna, Russia GSU, Gomel, Belarus LCWS07 30.
Dual Target Design for CLAS12 Omair Alam and Gerard Gilfoyle Department of Physics, University of Richmond Introduction One of the fundamental goals of.
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
1 Nick Sinev, ALCPG March 2011, Eugene, Oregon Investigation into Vertex Detector Resolution N. B. Sinev University of Oregon, Eugene.
Thomas Jefferson National Accelerator Facility Page 1 Hall B: Software Utilization Gerard Gilfoyle University of Richmond 12 GeV Upgrade Software Review.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, June 14 th 2012.
Thomas Jefferson National Accelerator Facility Page 1 Overview Talk Content Break-out Sessions Planning 12 GeV Upgrade Software Review Jefferson Lab November.
TOFp Status Report Introduction: system overview Functional requirements Analysis status –track extrapolation & matching –start time –stop time –identified.
TOF Reconstruction, Calibration & Test-beam Simulation Jiang Linli 2005/6/1 (13th BES Annual Meeting )
BESIII offline software group Status of BESIII Event Reconstruction System.
RICH studies for CLAS12 L. Pappalardo1 Contalbrigo Marco Luciano Pappalardo INFN Ferrara CLAS12 RICH Meeting – JLab 21/6/2011.
Status of PSD simulation in Shine Oleg Petukhov Institute for Nuclear Research, Moscow NA61 Analysis/Software/Calibration meeting , Warsaw.
CMOS Pixels Sensor Simulation Preliminary Results and Plans M. Battaglia UC Berkeley and LBNL Thanks to A. Raspereza, D. Contarato, F. Gaede, A. Besson,
Update on Central Neutron Detector for CLAS12 S. Niccolai, IPN Orsay European collaboration: INFN Frascati, INFN Genova, IPN Orsay, LPSC Grenoble CLAS12.
Tracker Neutron Detector: INFN plans CLAS12 Central Detector Meeting - Saclay 2-3 December 2009 Patrizia Rossi for the INFN groups: Genova, Laboratori.
1 GlueX Software Oct. 21, 2004 D. Lawrence, JLab.
EC Software Suite 1 EcMon: Monitors raw, calibrated and reconstructed data in real-time with detector map navigation, strip- charts, histograms. Single-event,
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
CLAS12 software workshop
CLAS12 Calibration and Commissioning (CALCOM)
Overview of CLAS12 Calibration
FORWARD CARRIAGE UPDATE – March-July 2015
DC monitoring - calibration - simulation - corrections
Preparation of the CLAS12 First Experiment Status and Time-Line
BESIII TOF Digitization
BES III Software: Short-term Plan ( )
Presentation transcript:

Thomas Jefferson National Accelerator Facility Page 1 CLAS12 Workshop Jefferson Lab February 23, 2016 Time-of-Flight Software Status Jerry Gilfoyle, Evgeny Golovach, Dan Carman, Veronique Ziegler, Gagik Gavalian Outline: Motivation Time-of-Flight subsystem Status Validation results Timing resolution Summary

Thomas Jefferson National Accelerator Facility Page 2 TOF Reconstruction page 3  Outputs o Times (T L, T R from TDCs) o Positions (x cluster =v eff (T L – T R )/2, y cluster depends on cluster size) o Hit times (T hit from (T L + T R )/2) o Deposited energy (E dep from ADCs)

Thomas Jefferson National Accelerator Facility Page 3 TOF Reconstruction page 2  Forward Time-of-Flight (FTOF) o 6 sectors, double-sided PMT readout. o Paddles:  Panel 1a - 23, 15-cm wide, ps timing requirement.  Panel 1b - 62, 6-cm wide, ps timing requirement.  Panel 2 – 5, 15-cm wide, ps timing requirement.  Central Time-of-Flight (CTOF) o 48 paddles, double-sided PMT readout. o form hermetic barrel around target. o 60-ps timing resolution requirement.

Thomas Jefferson National Accelerator Facility Page 4 FTOF Software Status First version of standalone TOF reconstruction code (CLAS-NOTE ) ported to coatjava. Results of DC reconstruction used to extrapolate track to FTOF panels. Geometry obtained from Java package for FTOF reconstruction and gemc. Updated to latest versions of Common Tools. Part of upcoming Common Tools 2.5 release. Validation studies on going (results below).

Thomas Jefferson National Accelerator Facility Page 5 FTOF Software Validation Studies JLab software v1.2gemc v2.2 coatjava 2.0Single paddle hits. Event generators – uniform distributions

Thomas Jefferson National Accelerator Facility Page 6 Position Studies- 1 1A 1B 2 Magnetic fields set to zero. Panel widths: 1A – 15 cm 1B – 6 cm 2 – 22cm Panels show increase in width expected for current digitization in gemc. Geometry used in coatjava 2.0 from same database used by gemc.

Thomas Jefferson National Accelerator Facility Page 7 Position Studies- 2 1A 1B 2 Magnetic fields set to zero. Panel widths: 1A – 15 cm 1B – 6 cm 2 – 22 cm Widths reflect geometry of each paddle. Spike in panel 2 and a wee bit in panel 1b likely due to hit in neighboring counter. Under investigation.

Thomas Jefferson National Accelerator Facility Page 8 Deposited Energy and ADCs 1A 1B Magnetic fields set to zero. Panel thickness: 1A – 5 cm 1B – 6 cm 2 – 5 cm Position of E dep peak consistent with past measured response and thickness of the paddle.

Thomas Jefferson National Accelerator Facility Page 9 Timing 1A 1B 2 Required timing resolution is in the range ps for combined panels 1a and 1b. Timing resolutions Panel 1a: ps Panel 1b: ps Panel 2: ps. TDC digitization in gemc needs to be made more realistic.

Thomas Jefferson National Accelerator Facility Page 10 Time Resolution - 1

Thomas Jefferson National Accelerator Facility Page 11 Time Resolution - 2

Thomas Jefferson National Accelerator Facility Page 12 Time Resolution - 3

Thomas Jefferson National Accelerator Facility Page 13 Summary GEMC page 4 1.Standalone TOF reconstruction software updated and in coatjava Matching between DC track and FTOF hits done. 3.Reading ccdb database for calibration constants. 4.Validation studies ongoing. 5.Timing resolution studies starting.