Nouvelles Récentes
2 WWS WorldWide Study on Physics and Detectors for Future Linear Colliders Recognize and coordinate studies on whole detector concepts, and work toward interregional detector TDRs. Interface with GDI (Global Design Initiative), especially on MDI (Machine Detector Interface) issues. Keep a register of R&Ds relevant to LC experimental programs, identify those that are vital or missing, and ensure peer review of R&D proposals. Organize interregional meetings and workshops. Report to ILCSC and ICFA on the matters above. ILC Workshop, 07 DESY
3 Collider Progress Reference Design with cost released in Beijing in February Two 11km SC linacs operating at 31.5 MV/m for 500 GeV Centralized injector Circular damping rings for electrons and positrons Undulator-based positron source Single IR with 14 mrad crossing angle Dual tunnel configuration for safety and availability Single IR with Push-Pull Detectors Large cost saving compared with 2 IR ~200 M$ compared with 2 IR with crossing angles 14/14 mrad ILC Workshop, 07 DESY
4 The Concepts TrackingECalInnerRadiusSolenoidEMCalHadronCalOther SiDsilicon 1.27 m 5 Tesla Si/WDigital(RPC..) Had cal inside coil LCDTPCgaseous 1.68 m 4 Tesla Si/WDigitalorAnalog Had cal inside coil GLDTPCgaseous 2.1 m 3 Tesla W/Scin.Pb/Scin. Had cal inside coil 4thTPCgaseous 1.4 m 3.5/1.5crystal Multi- fiber readout DoubleSolenoid (open mu) ILC Workshop, 07 DESY
5 DRC and EDR DRC : Detector Concept Report Editors Physics: A. Djouadi, J. Lykken, K. Moenig, Y. Okada, M. Oreglia, S. Yamashita, J. Lykken Detectors: J. Jaros A. Miyamoto T. Behnke, C. Damerell Drafts ILC Wiki id=dcrdet:dcrdet_home send comments to editors now under the 4 th part of the Reference design report: LOI : Letter of Intent Summer ILCSC announces call for Letters of Intent for detector designs for the two engineering designs, due Summer LOI? : SiD LDC+GLD 4th Summer Detector design teams submit Letters of Intent (backed by design reports) proposing candidates for the two detector designs. End of Two detector designs recognized for development to the engineering design phase. EDR : Engineering Design Report GDE plans an Engineering Design Report in 2010 (start 2009) Search committee for research director ILC Workshop, 07 DESY
6
7 Future Meetings ALCPG - Fermilab - October next LCWS - North America - late summer/fall 2008 ILC Workshop, 07 DESY
8 CALICE CALICE collaboration meeting (Sept 2007) (voir Agenda pour les présentations) Julie Prast: DIF working group and DIF for DHCAL Catherine Adloff Micromegas development for the European DHCAL Autres DHCAL: 30 x 30cm 2 3M GEM foils 9 chambers (20 x 20 cm 2 ) with 4 chips each CALICE meeting, 07 Prague
9 The European DHCAL status The European DHCAL status CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Detectors study: GRPC,µMEGAS Detectors study: GRPC,µMEGAS Electronics development : Semi-digital Electronics development : Semi-digital 4-chip board 4-chip board Beam test & prototype Beam test & prototype Funding Funding Imad LAKTINEH Imad LAKTINEH
10 GRPC : IHEP+IPNL (see Vladimir talk) 8X8 pads ok, 8X32 pads ok Activities : Efficiency vs multiplicity Gas mixture (Isobutene->CO2) important issue important issue Conceiving, building and testing Conceiving, building and testing large area GRPC large area GRPC GRPC development & characterization HV Signal Graphite Resistive plates Gas Pick-up pads
11 µMEGAS : LAPP+IPNL (see Catherine talk) 8X8 pads (mesh ) ok, 6X16 pads (bulk) ok, 8X32 pads (soon) (collaboration with Saclay and CERN)) Activities: Activities: Efficiency, X-talk, homogeneity Efficiency, X-talk, homogeneity more efforts for large µMEGAS (largest mesh size 50X50 cm2) more efforts for large µMEGAS (largest mesh size 50X50 cm2) µMEGAS development & characterization mesh signal scint. trigger
12 4-Chip board 4-Chip board Aims: Validate electronics for DHCAL Validate electronics for DHCAL Study the different detectors behavior. Study the different detectors behavior. 8X32 pads detector (GRPC and µMEGAS)8X32 pads detector (GRPC and µMEGAS) 8-layer PCB8-layer PCB 4 HARDROC4 HARDROC Readout USB + FPGAReadout USB + FPGA (see Clément talk) (see Clément talk) Acquisition : digital and analogueAcquisition : digital and analogue (collaboration with U.K groups) (collaboration with U.K groups)
13 Towards beam test at DESY To do List: Acquisition: to be completed soon (1-2 weeks) Acquisition: to be completed soon (1-2 weeks) Detectors: GRPC is ready, MICROMEGAS to be built soon using the same mesh structure to be used by T2K Setup: Almost done with the possibility to host few detectors (slice test)
14 Towards the prototype Milestones: The aim is to build a prototype as close as possible to the final one (technological prototype) The first step after the DESY beam test is to build a large area detectors (>1m2) with an extensible scheme Compare different detectors before to make a detector choice Then Build a prototype of 40 planes of 70X70 cm2 each Detectors (IHEP,IPNL,LAPP,….) Mechanical structure (CIEMAT, IPNL, LAPP,…) Readout Electronics (LAL,LLR,IPNL,LAPP,…) DAQ (collaboration with UK groups)