Nouvelles Récentes. 2 WWS WorldWide Study on Physics and Detectors for Future Linear Colliders  Recognize and coordinate studies on whole detector concepts,

Slides:



Advertisements
Similar presentations
4 November 2002Paul Dauncey - CALICE News1 News from CALICE Paul Dauncey Imperial College London.
Advertisements

山本 均 Hitoshi Yamamoto 東北大学 Tohoku University 北京、十一月二十三日、二 00 六年 Beijing, Nov 24, 2006 WWS Report MDI Report.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Summary Remarks By Jonathan Dorfan. We Are Living In a Remarkable Time – We Stand at the Door to a A scientific Revolution  Discoveries of the past five.
Micromegas for a DHCAL LAPP, Annecy Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise Espagilière.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
ILCTRP WWS  ILCSC D.J.Miller for WWS; 16/11/ Report to ILCSC from the World-Wide Study of Physics and Detectors for a Linear Collider. 1.Proposed*
CALICE meeting Prague 2007, Hervé MATHEZ 1 DHCAL PCB STUDY for RPC and MicroMegas (Electronics recent developments for the European DHCAL) William TROMEUR,
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
Towards an International Linear Collider Barry Barish GDE 6-June-07.
Worldwide Study Organizing Committee Report from Worldwide Study on Physics and Detectors ICFA meeting, Beijing August 2004.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
Resistive ….. I.Laktineh IPN-Lyon. Motivation Calorimeters are expected to play an important role in future experiments (ILC, CLIC…) based on PFA concepts.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
CHARGE TO THE 2007 LINEAR COLLIDER WORKSHOP Jim Brau University of Oregon DESY Hamburg May 30, 2007.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
Report from Worldwide Study and Charge to the Workshop ACFA04, Taipei 11/8/2004.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
May 31, 2007CALICE DHCAL J. Yu 1 Gas DHCAL R&D May 31, 2007 WWS CAL R&D Review, DESY Jae Yu University of Texas at Arlington For CALICE DHCAL Groups Introduction.
ILC Detector R&D in Japan Hitoshi Yamamoto Tohoku University.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
1 BILC07/ACFA Charge Hitoshi Yamamoto BILC07, Beijing
MicroMegas for DHCAL Status and activities at LAPP Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Status of the MICROMEGAS semi-DHCAL M. Chefdeville LAPP, Annecy, France LCWS, 27 th March 2010, Beijing 1.
Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 1 DHCAL and MICROMEGAS at LAPP Catherine Adloff Franck Cadoux Sébastien Cap Cyril Drancourt Ambroise.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
HARDROC: Readout Chip for CALICE/EUDET Digital Hadronic calorimeter Nathalie Seguin-Moreau.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
David J. Durham 1/9/04 ECFA 1 News, and Charge to Workshop 1.What follows technology choice? 2. Other strategic developments 3. Worldwide Study.
SDHCAL-GRPC Review I.LAKTINEH For the SDHCAL-GRPC groups.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Test Beam Request for the Semi-Digital Hadronic Calorimeter
The European DHCAL status
A proposal to equip the high eta muon stations with High Rate GRPC
LC Test Beam Activities
Status of the DHCAL DIF Detector InterFace Board
(My personal) CALICE Report
Testbeam Timing Issues.
Semi-Digital Hadronic CALorimeter
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
Status of International Collaboration for CEPC Detectors R&D
GEM-based Digital Hadron Calorimetry for SiD
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Yasuhiro Okada, Executive Director, KEK
GEM-based Digital Hadron Calorimetry for SiD
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
Presentation transcript:

Nouvelles Récentes

2 WWS WorldWide Study on Physics and Detectors for Future Linear Colliders  Recognize and coordinate studies on whole detector concepts, and work toward interregional detector TDRs.  Interface with GDI (Global Design Initiative), especially on MDI (Machine Detector Interface) issues.  Keep a register of R&Ds relevant to LC experimental programs, identify those that are vital or missing, and ensure peer review of R&D proposals.  Organize interregional meetings and workshops.  Report to ILCSC and ICFA on the matters above. ILC Workshop, 07 DESY

3 Collider Progress  Reference Design with cost released in Beijing in February  Two 11km SC linacs operating at 31.5 MV/m for 500 GeV  Centralized injector Circular damping rings for electrons and positrons Undulator-based positron source  Single IR with 14 mrad crossing angle  Dual tunnel configuration for safety and availability Single IR with Push-Pull Detectors  Large cost saving compared with 2 IR  ~200 M$ compared with 2 IR with crossing angles 14/14 mrad ILC Workshop, 07 DESY

4 The Concepts TrackingECalInnerRadiusSolenoidEMCalHadronCalOther SiDsilicon 1.27 m 5 Tesla Si/WDigital(RPC..) Had cal inside coil LCDTPCgaseous 1.68 m 4 Tesla Si/WDigitalorAnalog Had cal inside coil GLDTPCgaseous 2.1 m 3 Tesla W/Scin.Pb/Scin. Had cal inside coil 4thTPCgaseous 1.4 m 3.5/1.5crystal Multi- fiber readout DoubleSolenoid (open mu) ILC Workshop, 07 DESY

5 DRC and EDR  DRC : Detector Concept Report  Editors Physics: A. Djouadi, J. Lykken, K. Moenig, Y. Okada, M. Oreglia, S. Yamashita, J. Lykken Detectors: J. Jaros A. Miyamoto T. Behnke, C. Damerell  Drafts ILC Wiki id=dcrdet:dcrdet_home send comments to editors now under the 4 th part of the Reference design report:  LOI : Letter of Intent  Summer ILCSC announces call for Letters of Intent for detector designs for the two engineering designs, due Summer LOI? : SiD LDC+GLD 4th  Summer Detector design teams submit Letters of Intent (backed by design reports) proposing candidates for the two detector designs.  End of Two detector designs recognized for development to the engineering design phase.  EDR : Engineering Design Report  GDE plans an Engineering Design Report in 2010 (start 2009)  Search committee for research director ILC Workshop, 07 DESY

6

7 Future Meetings ALCPG - Fermilab - October next LCWS - North America - late summer/fall 2008 ILC Workshop, 07 DESY

8 CALICE  CALICE collaboration meeting (Sept 2007) (voir Agenda pour les présentations) Julie Prast: DIF working group and DIF for DHCAL Catherine Adloff Micromegas development for the European DHCAL  Autres DHCAL:  30 x 30cm 2 3M GEM foils  9 chambers (20 x 20 cm 2 ) with 4 chips each CALICE meeting, 07 Prague

9 The European DHCAL status The European DHCAL status CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Detectors study: GRPC,µMEGAS Detectors study: GRPC,µMEGAS Electronics development : Semi-digital Electronics development : Semi-digital 4-chip board 4-chip board Beam test & prototype Beam test & prototype Funding Funding Imad LAKTINEH Imad LAKTINEH

10 GRPC : IHEP+IPNL (see Vladimir talk) 8X8 pads ok, 8X32 pads ok Activities : Efficiency vs multiplicity Gas mixture (Isobutene->CO2) important issue important issue Conceiving, building and testing Conceiving, building and testing large area GRPC large area GRPC GRPC development & characterization HV Signal Graphite Resistive plates Gas Pick-up pads

11 µMEGAS : LAPP+IPNL (see Catherine talk) 8X8 pads (mesh ) ok, 6X16 pads (bulk) ok, 8X32 pads (soon) (collaboration with Saclay and CERN)) Activities: Activities: Efficiency, X-talk, homogeneity Efficiency, X-talk, homogeneity more efforts for large µMEGAS (largest mesh size 50X50 cm2) more efforts for large µMEGAS (largest mesh size 50X50 cm2) µMEGAS development & characterization mesh signal scint. trigger

12 4-Chip board 4-Chip board Aims: Validate electronics for DHCAL Validate electronics for DHCAL Study the different detectors behavior. Study the different detectors behavior. 8X32 pads detector (GRPC and µMEGAS)8X32 pads detector (GRPC and µMEGAS) 8-layer PCB8-layer PCB 4 HARDROC4 HARDROC Readout USB + FPGAReadout USB + FPGA (see Clément talk) (see Clément talk) Acquisition : digital and analogueAcquisition : digital and analogue (collaboration with U.K groups) (collaboration with U.K groups)

13 Towards beam test at DESY To do List: Acquisition: to be completed soon (1-2 weeks) Acquisition: to be completed soon (1-2 weeks) Detectors: GRPC is ready, MICROMEGAS to be built soon using the same mesh structure to be used by T2K Setup: Almost done with the possibility to host few detectors (slice test)

14 Towards the prototype Milestones: The aim is to build a prototype as close as possible to the final one (technological prototype) The first step after the DESY beam test is to build a large area detectors (>1m2) with an extensible scheme Compare different detectors before to make a detector choice Then Build a prototype of 40 planes of 70X70 cm2 each Detectors (IHEP,IPNL,LAPP,….) Mechanical structure (CIEMAT, IPNL, LAPP,…) Readout Electronics (LAL,LLR,IPNL,LAPP,…) DAQ (collaboration with UK groups)