Potential of Uzbekistan’s energy system and proposals for cooperation development with Korean companies STATE JOINT STOCK COMPANY «UZBEKENERGO» uzenergy.uzpak.uz.

Slides:



Advertisements
Similar presentations
Updating Mongolia’s Energy Masterplan Michael J. Emmerton, ADB Team Leader - 24 May 2013.
Advertisements

1 Strategy of electric power industry development in Russia for the period up to Director of OJSC «ENIN», Academician of RAS Eduard P. Volkov.
L/O/G/O Green Energy Projects Opportunities for Cooperation Opportunities for Cooperation.
Show guidelines, which are useful when placing elements and photos: 1. Rightclick on the slide and choose ’Grid and Guides’ 2. Check ’Display drawing guides.
Donors’ Conference on Sustainable Energy for Kosovo
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Previous Efforts in the Electricity Sector to Improve Energy Efficiency On Supply Side  Maximum use of natural gas.  Increase of generation efficiency.
The Kazakh Operator of Electric Power and Capacity Market
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
ECONOMIC POTENTIAL & INVESTMENT ENVIRONMENT OF THE REPUBLIC OF UZBEKISTAN Elyor Ganiev Minister of Foreign Economic Relations, Investments and Trade.
Ministry of Energy and Water Resources of the Republic of Tajikistan
"Sustainable energy supply to remote hard-to reach villages with using of integrated wind-solar power facilities with installed capacity of up to 30kW.
POWER GENERATION TECHNOLOGIES
Marek Kras. A combined cycle gas turbine power plant, frequently identified by CCGT shortcut, is essentially an electrical power plant in which a gas.
THE CURRENT STATE OF ENERGY SECTOR IN MONGOLIA, DEVELOPMENT TRENDS
1 Ongoing strategy of development and reconstruction of electricity sector of Tajikistan Rafika Musaeva Chairman of Association of Energy of Tajikistan.
Joint Stock Company “Uzbuildmaterials” Tashkent, May 2012.
“Support of anti-crisis program of Uzbekistan government to financial sector: In focus leasing market of Uzbekistan ” Mustafaev Z.B. General Director of.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
FY Preliminary AssessmentQuick Wins by 2015 National Sector Strategy ● Need the mid- to long-term Power M/P based on demand forecast.
Electricity Network Connectivity Between the GCC Countries Presented By: Adnan I. Al-Mohaisen May 17, 2005.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
RAO “UES of Russia” Action Plan on Reliability Improvement of Unified Power System of Russia August 29, 2005.
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
Electricity Reforms in Bangladesh
750 kV Rivne-Kyiv High Voltage Line Construction Project with attraction of loan proceeds from European Bank for Reconstruction and Development and European.
JSC “OGK-6” 2009 Financial Results (IFRS) April, 2010.
How to deliver a Renewable Energy Project Jemma Benson CO2Sense Yorkshire.
Presentation by Anatoly Chubais Chief Executive Officer RAO «UES of Russia» to the 18th World Energy Congress (round table) Buenos Aires.
POWERING A NATION MACEDONIAN POWER PLANTS (ELEM).
THE NATIONAL BANK FOR FOREIGN ECONOMIC ACTIVITY OF THE REPUBLIC OF UZBEKISTAN: INVESTMENT PROJECT FINANCING Speaker: Nodir Matyakubov Head of Department.
Ensuring the delivery of secure low carbon energy David Green Chief Executive, UKBCSE.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
Association “Toshshakhartranskhizmat” Republic of Uzbekistan.
Financing Heating Sector Improvement Project ADB’s Experience International Conference October 2005, Baku October 2005, Baku Ashok Bhargava.
LENENERGO GENERAL OUTLOOK Transmission lines by voltage less than 220 kV 97% 330 kV 1% 220 kV 2% The largest power company in the North-West Russia.
Russian power sector reform Presentation by Anatoly Chubais, Chief Executive Officer, RAO UES of Russia 19 June 2001Moscow.
Developing Africa’s energy potential and integrating power supply systems for sustainable development in African countries (case of Niger)
Ambassador Sherali Jononov
POWER SECTOR, ENERGY RELATED RESEARCH POTENTIAL in LITHUANIA by dr. Anzelmas Ba čauskas Lietuvos energija AB, Lithuania CENTRAL-EASTERN EUROPEAN ENERGY.
JSC "Uzneftegazinformatika" Joint Stock Company "Uzneftegazinformatika» (JSC «O'zneftgazinformatika») is an engineering and service organization in the.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
© «Samruk-Green Energy» LLP BRIEF COMPANY OVERVIEW March «Samruk-Green Energy» LLP Bagdat Oral Project Manager.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
Qishloq Qurilish Bank INVESTMENT PROPOSAL. In order to fulfill the requirements of the Resolution of the President of the Republic of Uzbekistan №RP-2454.
Strategic Development of Power Generation in the Context of “Energy Strategy for the Year 2030” Chisinau - September 2010 Al. Gribincea PhD World economy,
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
Kazakhstan Electric Association KEA Established in 1998 Unites 21 participants and 12 observers Among participants 9 distribution companies 3 vertically.
5 th ERRA Annual Meeting Country News – The Russian Federation Krasnodar Territory Sergei Milovanov Regional Energy Commission – Prices and Tariffs Department.
UZNEFTGAZDOBICHA JOINT-STOCK COMPANY «Asakatransneft» Joint-stock company.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
INTERIM CG MEETING Copenhagen April 29, 2002 Strategy of World Bank for Supporting Power Sector Projects in Central Asia Presentation by Raghuveer Sharma.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
UZNEFTGAZDOBICHA JOINT-STOCK COMPANY «MAXSUSENERGOGAZ» Joint-Stock Company.
Cooperation Potential in Oil and Gas Sector of Uzbekistan
Chairman of the Board and CEO,
«O’ZVAGONTA'MIR» JOINT-STOCK COMPANY
“Electricity Supply Reliability Project - Additional Financing”
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation.
Prospects for cooperation in the field of energy
DCC Cluster/Working Group Energy MTDS (GoT) priorities for the sector
Cross-border Infrastructure Projects
INVESTMENT POTENTIAL OF SYRDARYA REGION
Presentation Plan Overview of Kazakhstan’s small business sector
Energy Sector Overview
Electricity Transmission Network Improvement Project Grant for preparation
Presentation transcript:

Potential of Uzbekistan’s energy system and proposals for cooperation development with Korean companies STATE JOINT STOCK COMPANY «UZBEKENERGO» uzenergy.uzpak.uz Mr. Botir Teshabaev Chairman

Structure of Executive Body of the State Joint Stock Company “Uzbekenergo” Slide 1 Coal production OJSC "Uzbekugol" with affiliates The Boardof Company The Board of Company Council of the Company Power generation companies: TPP, HPP, HPP cascades Power sale company (affiliate) (affiliate) Repair and adjustment companies Design institutes Construction-and- Mounting company Logistical support companies Power distribution and selling companies Branch general functions UE Uzenergosozlash company Others Power transportation UE "Uzelektroset" with functional and zone affiliates

Installed capacities of the power plants (MW), total 12357,6 1. SJSC "Uzbekenergo" including: Thermal power plants (TPP) Hydro power plants (HPP) 12038, ,0 1419,6 2. Power plants are not in jurisdiction of SJSC "Uzbekenergo" 320 Slide 2 Structure of installed capacities of the power plants of Uzbekistan

Thermal power plants (TPP) Plants Installed capacity, МW Number of units Commissioning Syrdarya Novo-Angren Tashkent Navoii Talimardjan Hydro power plants (HPP) Hydro power plants (HPP) Plants Installed capacity, МW Number of units Commissioning Charvak620, Khodjikent Gazalkent Main power generation plants of SJSC "Uzbekenergo" Slide 3

Fuel consumption Total (thnds. tons of fuel equivalent) including: natural gas (bln.m 3 ) coal (mln.t.) mazut (mln.t.) underground gas (mln.m 3 ) 13,0 2,6 1,1 0,37 Slide 4 Structure of fuel consumption by power plants of the Company in 2004

0,4-500 kV electrical network total length, km including: 500 kV transmission lines 220 kV transmission lines 110 kV transmission lines 35 kV transmission lines 6-10 kV transmission lines 0,4 kV transmission lines Slide 5 Structure of electrical network

Structure of power consumption by branches of economy and population in 2004 Slide 6

Electric power tariffs for domestic consumption Tariffs kW/h Period (June-August) six months Tariffs (US cent) 0,880,760,831,302,083,14 Tariffs (uzbek sum) 4,004,708,0013,1021,3035,40 Slide 7

Measures for generation capacity commissioning for the period of years №Projects Commissio ning capacity, MW Note 1.Reconstruction of Syrdarya TPP 2 power units 120executed 2.Talimardjan TPP, unit № 1800commissioned in CCPP Construction, total Tashkent TPP modernization376at the first stage 3.2.Navoi TPP modernization Mubarek CHP reconstruction Tashkent CHP modernization60 Slide 8

kV electric network development for the period till 2010 Slide 9 №Names Commissioning capacity 1South-Western main transmission networks (MTN): 500 kV SS Sogdiana with kV OHL (I and II stage) 2х501 MVA - 67 km 500 kV OHL «Syrdarya TPP – Sogdiana» 205 km 500 kV OHL «Sogdiana – Talimardjan TPP» 216 km 2Central MTN: 220 kV SS Keles, step-down station 110 kV Navoi with kV OHL 400 MVA - 7,2 km 110 kV SS ODO with 110 kV cable line 126 MVA - 6 km 220 kV OHL «Tashkent TPP – Keles» 43,8 km 220 kV SS Yangiyul with 220 kV OHL 2х200 MVA - 20 km 3Eastern MTN: 500 kV SS Uzbekistanskaya with 500 kV OHL connection 501 MVA - 40 km 500 kV OHL Novo-Angren TPP - Uzbekistanskaya 200 km

Slide 10

Financial results of the Company for 2004 In total incomes mln. sum including: total income on production sale mln. sum other incomes from the main activity mln. sum incomes as the dividends 80 mln. sum gain of exchange currency rate differences 161 mln. sum all the expenditures mln. sum including: charges of the period mln. sum interest charges 6163 mln. sum loss from exchange currency rate differences 2164 mln. sum The profit before taxation mln. sum Charged: income tax mln. sum other taxes and dues 8843 mln. sum The net profit mln. sum Slide 11 Slide 11

Joint Stock Companies (OJSC) which share are subject for sale №Denomination Statutory fund including Shares owned by SJSC "Uzbekenergo" Shares for sale thous. sum% % 1 Takhiatash TPP * 2 Navoi TPP * 3 Syr-Darya TPP ** 4 Tashkent HPP ** 5 Fergana HPP ** 6 Mubarek HPP ** 7 Karakalpakstan ESN * 8 Andijan ESN * 9 Djizakh ESN * 10 Namangan ESN * 11 Sirdarya ESN * 12 Tashkent ESN * 13 Fergana ESN * 14 Khorezm ESN * 15 Tashkent.City ESN * 16 Bukhara ESN * 17 Kashkadarya ESN * 18 Navoi ESN ** 19 Samarkand ESN * 20 Surkhandarya ESN * 21 Energoimpex * 22 Uzbekgidroenergokurilish * 23 Gidrospetstroy * 24 Uzbekugol * * - There is a process of definition of starting cost of a sold package of the shares. ** - Market value of holding of shares is thous. US$

Stage Stage Stage TotalCost, th.uzbek sum Single phase meters Three-phase meters Installation of modern electric power meters in networks Slide 13

Slide 14 reliable power supply of population and industry with qualitative electrical power; technical re-equipment and modernization of branch facilities, efficiency and functional improvement; reduction of negative energy production impact on the environment; further development of economical reforms creation and development electrical power market; integration process improvement in the unified power grid of the Central Asia. Strategic aims of development of electric Power Industry till 2010 are the following:

The company conducts the reconstruction works on Syrdarya TPP, having 10 energy units with single design capacity 300 MW The first phase of reconstruction of two power unit № 7 and № 8 by means of EBRD loan financing for the amount of USD 27,8mln was carried out at Syrdarya TPP Second phase – next power units reconstruction. Project cost will be defined after FS preparation «Syrdarya TPP» modernization Slide 15

The agreement between JBIC and Government of Republic of Uzbekistan was signed in 2002 where the Government of Japan provides the promotional loan at the amount of JY mln. for implementation of this project The project provides construction of 370 MW Combined Cycle Power Plant at Tashkent TPP with commissioning in 2008 The International Consulting Company on support of this project was selected by means of Bidding Now the preparation to Bidding process for selection of EPC Contractor is carrying out Modernization of the «Tashkent TPP» Slide 16

The installed capacity of Navoi TPP is 1250 MW. The Plant has 2 units of 210 MW, 4 units of 160MW, 6 boilers and 5 turbines, producing electric and thermal power The project provides construction of 346 MW modern Combined Cycle Power Plant. The Project Feasibility Study has developed and passed the examination in the authorized bodies. The total project cost according to Feasibility Study is US$ 232 mln Modernization of «Navoi TPP» Slide 17

The installed capacity of Mubarek CHP – 60 MW, plant has 3 boilers with steam productive capacity till 500 tn/h and 2 turbines, producing electrical - and thermal energy The Feasibility Study (FS) of the project was developed and passed the examination in the authorized bodies. The total project cost in compliance with Feasibility Study is USD103,2 mln The investment project purpose is the reconstruction and expansion of operating capacities of Mubarek CHP with commissioning of 2 unit (gas turbine mounting) of total capacity 106,3 MW of electrical energy and 400 ton /h of steam Mubarek CHP reconstruction Slide 18

Construction of 500 kV High Voltage transmission line from Syrdarya TPP to Sogdiana substation Project goal is effective power supply of Samarkand – Bukhara region, reduction electric power losses in transmission lines Islamic Development Bank allocated 25 mln. US dollars for this project with total cost 44 mln. US dollars. Now we are in a bidding process for project consulting company Slide 19

Project realization is planned for the period Project total cost 70 mln. USD, including IDB loan - 25 mln. USD Project goal is reliable power supply of Samarkand – Bukhara region, reduction electric power losses in transmission lines 500 kV High Voltage transmission line construction from SS Sogdiana to Talimardjan TPP Slide 20

Coal deposits of Republic of Uzbekistan Slide 21 Slide 21

Gas88,378,977,2 Oil6,67,67,8 Coal4,813,214,7 Gas (under ground gas installation)0,3 The forecast of structure of fuel consumption for electric power production at Power Plants of Uzbekistan (%) Slide 22 Slide 22

Work of rotor complex at open-pit mine "Angrenskiy" Slide 23 Slide 23

Slide 24 Slide 24