1 Modification 0152V Implementation Matters 25 October 2007.

Slides:



Advertisements
Similar presentations
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Nexus Workgroup CSEP Transition Topic June
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
1 Performance Assurance Workgroup January 2014 A proposal by Xoserve for a Performance Assurance methodology.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Project Nexus Workgroup – Invoicing 11 th August 2014.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Project Nexus Workgroup Extension of Modification 0434 to permit retrospective updates pre-dating Project Nexus Go Live Date 9 th September 2014.
Agency Charging Statement Overview of Consultation 11 th February 2008.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
IGT and Shipper Workgroup meeting 28 th February 2011.
SoS Report PAC – 13th December 2016.
PN UNC Workgroup Invoicing 4th October 2011.
Capacity/Commodity Split Impact on Suppressed reconciliations
Amendment Invoice Task Force Progress Report
Nexus Meter Read Performance April 2018
Extraordinary DSC ChMC
Incentives 26 September 2018.
Large Supply Point Reconciliation which spans Pre & Post Go Live
Amendment Invoice Task Force Progress Report
Project Nexus Workgroup
CSEPs Reconciliation Proposals
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Modification 0117 – Additional Considerations
Weekly Progress Update 11 May 2018
Project Nexus Workgroup
Mod Proposal 0268 : AQ Backstop Date
Amendment Invoice Task Force Progress Report
Project Nexus Workgroup
UK Link Replacement Programme additional supporting UNC modifications
Deferral of Retrospective Updates Functionality
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Joint Theft Reporting Review (from meeting 1st March 2019)
DNO Obligations to Facilitate Resolution of Unresolved USRVs
Weekly Progress Update 13 April 2018
Project Nexus Workgroup
Modification Proposal 136
Actions Updates Action 0282/006 – Exclude from AQ process
Meter Reads.
Project Nexus Workgroup
Modification 440 Project Nexus iGT Single Service Provision
Extraordinary DSC ChMC
Further Considerations
Development Work Group 194
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

1 Modification 0152V Implementation Matters 25 October 2007

2 Business Rules  The following slides were used during Review Group 126 discussions to illustrate the “5-year model” and now represent the business rules for approved Modification 0152V.

3 Approved model - 5 years (4 yrs to 4 yrs 364 days) 1 st Feb R R R R4 RIP1 RIP2 RIP3  First implementation in April 2008  With effect from all charges raised from this date and up to 31st March 2009 are restricted to an earliest start date of 1st April 2004  In April 2009, the restricted invoicing period (RIP) will roll-forward one year. With effect from , all charges raised from this date and up to 31st March 2010 will be restricted to an earliest start date of 1st April 2005.

4 Impact of moving the earliest start date forward Charge duration With effect from 1 st April 2008, charges (where required) will be calculated back to 1 st April Period now closed Out – not reconciled or adjusted Charge duration Up to 31 st March 2008, charges (where required) will calculate back to 1 st Feb 1998

5 Impact of moving the earliest start date forward - reconciliations Reconciliation charge duration With effect from 1 st April, charges will be calculated back to 1 st April 2004 (where required) Period now closed out – not reconciled Reconciliation charge duration Up to 31 st March 2008, charges will calculate back to 1 st Feb 1998 (where required) R1 R2 The period pre is unreconciled on current business rules

6 Illustration of reconciliation Estimated consumption Actual consumption Meter reading period R1 R2 DIFFERENCE D1D2D3D4 Dn The reconciliation charges are calculated on a daily basis. To implement the rule in slides 8 and 9 xoserve systems will truncate the reconciliation at Reconciliation volumes for D1, D2 and D3 will not be invoiced and will remain unreconciled

7 Business Rule – applying the effective date  The implementation date for each period will be known in advance i.e. 1 st April each year  The new restricted invoicing period will roll forward on 1st April each year, and applies to charges to be calculated from 1st April each year  Relevant invoice charges e.g. reconciliation charges, will be calculated to 31 st March, and processed on an invoice issued in April  On 1st April the end date rolls-forward (to 1st April 2004 on 1 st April 2008)  The business rule must allow these charges relating to March, but calculated in April, to be valid under the restricted invoice period regime  Specifically for the month immediately prior to the RIP roll-forward, charges (where required) will be calculated back to the current earliest start date (before the roll-forward) and up to the end date  These charges will appear on the Reconciliation invoice to be issued in the first month after the roll-forward  The following slide illustrates this exception

Reconciliation invoice issued 24 th April A MPRN reconciliation charge Applying the effective date – Reconciliation Invoice R1R2  In April only, each year, the March Reconciliation invoice will include items which have technically timed out, to reflect the timing of the Reconciliation Invoice (one month in arrears) 24 th April Period now closed out – not reconciled or adjusted A MPRN reconciliation charge Reconciliation invoice issued 28 th May  Reconciliations processed on the April 2008 invoice issued in May will end date at

9 Treatment of Operational Query Adjustments  Modification reports includes the principle of a hard cutover, the maximum adjustment period for operational query adjustments will be set as the earliest start date which applies when they are invoiced  Operational queries are generally raised when the issue surfaces and therefore not all adjustments go back to the relevant earliest start date Query submitted Maximum adjustment period Financial adjustment invoiced Period now closed out – not adjusted

10 Operational Query Adjustment examples continued Query submitted Maximum adjustment period Query submitted Maximum adjustment period RIP – RIP – Financial adjustment invoiced Financial adjustment invoiced Period now closed out – not adjusted Period now closed out – not adjusted

11 Business Rule RbD treatment  Reconciliations and adjustments are processed as a “primary” activity.  Each reconciliation and adjustment will generate a “secondary” activity - an equal and opposite energy adjustment to the smaller supply point market through the Reconciliation by Difference (RbD) process.  Not all RbD processes are completed at the same time as the “primary” activity. Some reconciliations and adjustments are processed a month later in RbD than the “primary” reconciliation or adjustment

12 Business Rule RbD treatment continued RIP1 RIP2 Adjustment charge period Adjustment invoice issued Period now closed out – not reconciled or adjusted  The RbD charges associated with the adjustment processed in March 2009 are processed on the reconciliation invoice issued in April  The business rules described in the Modification Report allow the RbD charges to flow in full, including those relating to the period 1st April 2004 to 1st April 2005, which is now “closed-out”. RbD charges processed

13 Treatment of USRVs  Reconciliation charges that exceed certain tolerances are suppressed and submitted to shippers for resolution (USRVs)  A reconciliation charge can extend back to the earliest start date  A reconciliation may remain suppressed across a roll-forward date, so that part of the reconciliation is now timed out  The business rules include the re-calculation of USRVs (and any SRVs) which span the new earliest start date, so that only the part within the new RIP can be invoiced

14 Treatment of USRVs – examples In April 2009, part of the reconciliation charge is now “timed out”. The new shorter reconciliation will be subject to the suppression tolerances, and may pass or fail Reconciliation charge period (USRV) In February 2008, a reconciliation charge is calculated which results in a USRV Reconciliation charge period (USRV) Period now closed out – not reconciled Period now closed out – not reconciled R1 R2

15 Modification 0152V – Further Information  Information Sources  Review Group 126 materials and report  Modification 0152V Final Report  Practicalities of implementation  Presentations scheduled for future Billing Operations Forum (next meeting Tuesday December 4 th )  General enquiries to Billing teams –