1 1. General Information 1) Space (1) Land Space : 80Kft2 (2) Building Area : 75Kft2 ← 2 story-building(Partially 3 floors) 2) Construction Lead Time :

Slides:



Advertisements
Similar presentations
LED TV Manufacturer OEM/ODM
Advertisements

WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
Information Technology Development Center FLAGLER COUNTY FLORIDA ENGAGING IN THE WORLD WIDE ECONOMY.
Free house located at 130 W. Sheboygan Street, Campbellsport, WI.
Starting the Day with Prayer Missionaries, Togolese workers & volunteers meet together for a time of prayer before the work begins.
1 MICE Video Conference Reception of FC magnets Andy Nichols, STFC,
Appendix 1: Plant layout Entrance Offices Stores Loading bays Changing rooms vacant Factory floor To Clonmel To Waterford.
Granularity in the Data Warehouse. Raw Estimate  The raw estimate of the number of rows of data that will reside in the data warehouse tells the architect.
深圳市迪威泰实业有限公司 SHENZHEN D-VITEC INDUSTRIALS CO.,LTD. Profile of production line MadeVarifyApprove Haihui ou Jun yang 13 / 5 //
Bangladesh is the strongest ready made garments exporting country in the world considering both capabilities & competitiveness. In 2013/14, the garments.
HSMC Library Library Move & Relocation June – September, 2012.
Open & Closed Loop Systems. InputProcessOutput Input ProcessOutput Monitor Compare & Adjust To Menu Feedback Loop.
Dom Development SA Presentation of 2nd Quarter 2007 Results (Meeting with investors.
Manufacturing Accounting Chapter Preparing a cost of goods manufacturing schedule. Learning Objective 1.
2012 Investment project of integrated house- building factory construction in Chyukhloma municipal district.
SchedulingProducingControllingSchedulingProducingControlling.
Innovative Electronic Manufacturing Solutions
EMBA Presentation October 20, Overview  Budgets Within the Architecture of the Organization  Types of Budgets  Budget Preparation Theories 
LEADING EDGE CO.,LTD. Brief introduction  Company Profile  Workshops  Vision.
12600, Cardinal Meadow #405, Sugar Land, TX , Cardinal Meadow #405, Sugar Land, TX
ISA Quality System. ISO9001-VISION2000 DNV (Det Norske Veritas) ISA Quality Manual Continuous improvement Manufacturing & control plans Procedures.
Angelina Courts Prepared By: Homes and Homes Marketing Team.
Watertown Public Schools Facilities Study June 24, 2013.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
MU Condominium 5,000 Baht per month Maximum number of people per room: 3 (4 in case of a family) 2-bedroom (both large and small rooms) 3,000 Baht per.
LED TV Manufacturer OEM/ODM Factory Panorama.
 Traditional concept of warehouse as store or go down  Development of modern concept of warehouse as facility Traditionally, consumer maintained his.
MH...CH LECT011 What is Material Handling? Materials handling is the science and art both involving the moving, packing and storing of substance.
SchedulingProducingControllingSchedulingProducingControlling.
QBC Europe and its facilities. Building purchased – 1 st August 2006 Open for business – 6 th October 2006.
Introduction to Technology Course weeks 6 th Grade.
MARKETING & SALES CONS 7820 Professional Business Management COW 5.
1 Office Space Requirements 2 Universal Axioms Manufacturing managers in large companies tend to overestimate their individual cell or departmental space.
MY House By Jayuana Ware. Master Suite The Area of the floor is 128. The color is shell frost. The type of floor is carpet. The Price is $ 1.23.
© The Concept Factory © Science Link | 2© Science Link 2013  Three calls during Results:  66 applications, companies from 8 countries.
Industry Systems Input, Process or Output? Click on the right part of the system to move on.
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
6-1 Manufacturing Systems ERP Background Designed to re-order inventory using re-order point –Adapts production to customer orders –Increased flexibility,
1 Number Practice Money, Time, Age, etc. 2 New added Sign Mins - Time Month - Context Year - Length Hour (1 - 10) Hour (11 upward) Pence Twist - 1 st.
SchedulingProducingControllingSchedulingProducingControlling.
NINGBO SUNRISE IMPORT AND EXPORT CO.,LTD NINGBO SUNRISE IMPORT AND EXPORT CO.,LTD INDEFASHION APPAREL Miami,US office of Ningbo Sunrise I&E CO., LTD. Miami,US.
Speakman Place David Holden The Ingerman Group. Speakman Place Cornerstone West and The Ingerman Group collaborated to redevelop the former Speakman Company.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
LAYOUT Prepared By : Res.Asst.Hanife Demiralp. BLOCKPLAN In this lab, we are going to generate facility layout by using Block plan and POM-QM soft wares.
Enterprise Resource Planning, 1st Edition by Mary Sumner
Casing Macron Technology Co., Ltd.
engineering Faculty Ulm
Highveld Industrial Park Workshop No. 2 Information Memorandum
Common Learning Blocks
Golden Luck Metal Group Limited
Certificates of Occupancy & Classifications
Connors Bros. CloverLeaf Seafoods November 15, 2016
S9k Traceability System
Disusun Oleh YULIANA ISNANI (H1F114089)
Supply Chain Management
Manufacturing Planning
Over 35 years experience Supplying NHS Trusts, Private Hospitals and Distributors Established 1977 Located in South Wales 350 employees Part of Berendsen.
For more information c all
CUSTOMER (Requirements) CUSTOMER (Satisfaction)
Enterprise Resource Planning, 1st Edition by Mary Sumner
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
This is 1 minecraft block it is 1 unit long and 1 unit wide
Manufacturing Production Planning
Paste for Sale Inventory, as June 1st (Shown as Raw Tons)
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Introduction (Chapter 1) part.
This is 1 minecraft block it is 1 unit long and 1 unit wide
Stages of Production.
GENTS REST ROOM LADIES REST ROOM BASEMENT-2 BASEMENT-1 GROUND FLOOR 1st floor 2nd floor 3rd floor 4th floor 5th floor.
Presentation transcript:

1 1. General Information 1) Space (1) Land Space : 80Kft2 (2) Building Area : 75Kft2 ← 2 story-building(Partially 3 floors) 2) Construction Lead Time : 11Months (Aug to June 2001) 3) Facilities (1) Ware house - Raw Material Warehouse : Room for CRT 20,000 Pcs Storage - Finished Product Warehouse : (2) Production Line : Total 5 Lines - PCB Ass'y : 1 Line - TFT-LCD Ass'y : 1 Line - Set Ass'y & Adjustment : 3 Lines * In-line system : Burn-in, Touch Integration, Packing * Burn-In Room : 480Pcs of Monitors with aging time 72Hrs

2 2. Production Capacity Description Factory Old New CRT TFT-LCD Total Number of Lines Capacity Number of Lines Capacity 3 (1) 4 15 (5) 30 2 (2) 5 4 (2) 5 17 (7) 35 (Unit:K/month) * ( ) : Rental / OEM Factory 1 (1) 1

3 Assembly Line Assembly Packing Out Input Outgoing Inspection Input out Outgoing Inspection Material warehouse 2 nd Floor PCB Ass ’ y Line TFT-LCD Ass ’ y Line 3. Production Process 1 st Floor

4 3. Production Process Assembly Line Inspection Packing Burn-in Room Out going Inspection Input Assembly Line Inspection Packing Warehouse (Raw Material) Incoming Inspection Production Preparation Input Touch Integration Touch Integration OutOut 1 st Floor Warehouse (Finished Products) * Yellow colored line is only for IGT

5

6

7

8

9

10

11

12

13

14