Egyptian and Italian Cooperation Programme on Environment Quantitative Risk Assessment of Oil and Gas Plants Mr. Gaetano Battistella 1 Working Group n°.

Slides:



Advertisements
Similar presentations
General Presentation of the Project
Advertisements

Final Competence Assessment Assessment Documents Assessment strategy (SummitSkills) Assessment methodology (SQA) Assessment guidelines (SQA)
Workshop on the prevention of accidents of gas transmission pipelines The Hague, 8-9 March 2006 Sergiusz Ludwiczak.
1 Shuh Woei Yu Graduate Institute of Environmental Engineering National Central University From Hazard Control to Risk Control - A Paradigm Shift in the.
Frequencies Estimation Ricki M Mulia, ST. MSc. Unsafe Act Unsafe Condition HAZARD EXPOSURE Penyakit Akibat kerja RISK Kecelakaan kerja Higiene Industri.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
Safety distances: comparison of the metodologies for their determination – M. Vanuzzo, M. Carcassi ICHS San Francisco, USA - September SAFETY.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO RISK IDENTIFICATION 2.
Tony Gould Quality Risk Management. 2 | PQ Workshop, Abu Dhabi | October 2010 Introduction Risk management is not new – we do it informally all the time.
KAPPA OIL SERVICES 1 VII INTERNATIONAL CONFERENCE NEFTEGAZSTANDARDT September 2012 St. PETERSBURG Alain LOPPINET.
DELIVERING SAFE & RELIABLE OPERATION
HIAD NETWORK OF EXCELLENCE HYSAFE - Safety of Hydrogen as an Energy Carrier Work Package 5 Hydrogen Incident and Accident Database - HIAD Espen Funnemark,
Hazards Identification & Risk Assessment (HIRA) and On-site & Off-site Emergency management Plans Dr. R. Dubey - DMI.
The Evolving Roles and Responsibilities of Federal Agencies in Providing Transport and Dispersion Support Debbie Payton NOAA’s Ocean Service Office of.
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
Safety Management System Performance Based on Organizational Factors of “Seveso” sites Papadakis Georgios A., Kokkinos Konstantinos G. & Machaira Paschalia.
EuropeAid/131555/C/SER/RS Safety Procedures in the Chemical Industry Ernst SIMON, Styrian Regional Government, Austria Belgrade, December 2013.
Hazard Management for Safety Critical Systems Philip Benjamin Supervised by: Dr. David Hemer Computer Science Department University Of Adelaide.
Isograph Reliability Software RiskVu V3. Isograph Reliability Software ESSM – The first risk monitor ? Essential Systems Status Monitor Installed at Heysham.
Egyptian and Italian Cooperation Programme on Environment Best Available Techniques (BAT) Mr. Giorgio Grimaldi Mr. Giorgio de Benedetti 1 Workshop: “Best.
Occupational Health and Safety
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det.
Teaching of Labour protection, Fire Safety and Civil Defence Engineers in Riga Technical University Teaching of Labour protection, Fire Safety and Civil.
Engineering Risk Assessments and Risk Communication Sarah Arulanandam, Hazard and Risk Group RWDI West Inc. DISCLOSURE OF MATERIAL ENVIRONMENTAL EXPOSURES:
Large Atmospheric Storage Tank Fires
Imperial Ship Management AB “2.0”
Layers of Protection Analysis
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Crude Oil and Ethanol by Rail: Reducing Risk and Improving Emergency Response.
SCIENTIFIC AND RESEARCH ACTIVITIES IN THE FIELDS OF CRISIS MANAGEMENT AND CIVIL PROTECTION Tomasz Plasota, Bartłomiej Połeć 1 Scientific and Research Centre.
Product Stewardship: Putting It into Practice GCWellon, Manager, Responsible Care Methanex Corporation June 2010.
Are You Ready for an SIS? What to do before starting on your SIS…and after it’s installed March 24, 2009.
Risk Management Approaches to Hydrogen Safety. Risk Assessment, Limbo Dancing, and ALARP Les Shirvill.
SIPI61508 Soft computing based qualitative method for determination of SILs István Ajtonyi 1 – László Ormos 2 1 University of Miskolc, Institute of Electric.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
Source Control Project, Phases I-III Risk Assessment Methodology at radiation and chemical hazardous industrial facilities was developed 2.
Industrial Disaster Risk Management and future Strategies Dr Rakesh Dubey Director Disaster Management Institute Bhopal Bend Joints Pvt Ltd
PERMIT ISSUANCE SYSTEM IN CROATIA ENVIRONMENTAL REVIEW Authors: Jasna Paladin-Popović Iva Milić Štrkalj Renata Sinovčević Brijuni, 27 November /21/02Croatia.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Application of SIL assessment, Bow-tie and API 14C to ensure a thorough Safety Concept Prepared by: Fabienne Salimi & Tino Vande Capelle 26 January 2011.
1 Earthquake Response Cooperation Program for Energy Infrastructure in the APEC Region Chinese Taipei October 2000 APEC EWG 20.
MARCSMARCS Marine Accident Risk Calculation System.
Safety Assessment: Safety Integrity Levels
Homeland Security, First Edition © 2012 Pearson Education, Inc. All rights reserved. Overview of National Infrastructure Protection CHAPTER 3.
Project POP&C (Pollution Prevention & Control) A Rational Risk Based Approach For Design And Operation Of Tankers International Workshop on Marine Pollution.
Reporting to IMO of marine safety investigations and marine casualties and incidents TAIEX Workshop on Marine Casualty Investigation 5-6 September 2012.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Risk Assessment Techniques
Author: Eng. Abdel-Razek Rashwan QHSE Senior Consultant CAE-Egypt Safety in Global.
Angeliki Tsatsou Dritsa Chemist, Key Expert 2 Zagreb June 2011
Tomasz Plasota, Bartłomiej Połeć
Risk Evaluation Ricki M Mulia, ST. MSc.
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
Layers of Protection Analysis
Quality Risk Management
HSE Case: Risk Based Approach.
Quantitative Risk Assessment
Hazard identification
Modelling Internal Arc
Nick Bonvoisin Secretary to the Convention on the
Joint Research Centre The European Commission’s in-house science service.
SEVESO Expert Group Brussels, 19 January 2017.
M. Vanuzzo, M. Carcassi. Università di Pisa
European Commission, DG Environment Air & Industrial Emissions Unit
Layers of Protection Analysis
Project Risk Management Jiwei Ma
Presentation transcript:

Egyptian and Italian Cooperation Programme on Environment Quantitative Risk Assessment of Oil and Gas Plants Mr. Gaetano Battistella 1 Working Group n°. 3 “Define quantitative risk assessment for a oil and gas industrial unit ” “Capacity Building and Strengthening Institutional Arrangement” Workshop: Quantitative risk assessment of oil and gas plants Mr. Gaetano Battistella APAT Agency for Environmental Protection and Technical Services

Egyptian and Italian Cooperation Programme on Environment Quantitative Risk Assessment of Oil and Gas Plants Mr. Gaetano Battistella 2 Objective Taking into account a specific oil and gas plant of your knowledge, as an example, carry out a major hazard quantitative risk assessment in a oil/gas industrial unit.

Egyptian and Italian Cooperation Programme on Environment Quantitative Risk Assessment of Oil and Gas Plants Mr. Gaetano Battistella 3 Activities 1 st phase: Establish criteria to define an incident as a major hazard (i.e. max incident frequency and minimal consequence OUTSIDE the plant limits) Perform a preliminary analysis of a chosen plant unit (critical points as process equipment, storage of dangerous substances, control loops, piping fittings, etc.) Incident(s) identification by a proper methodology (most normally utilised is the HAZOP – HAZard OPerability analysis). For each identified incident, calculation of frequency (outcomes/year) by utilising historical data-bases or/and fault tree analysis For each identified incident, calculation of distance for minimal established consequence outside the plant limits (if any) and related probability Risk calculation for each identified major hazard (individual or social (frequency vs consequence probability) 2 nd phase:Define a general draft for a safety report compilation Final presentation and discussion about Working Group activities.