Proposal: Towards a TDR A.TDR means Technical Design Report. B. TDR is detailed report of EXACTLY what will be done and includes detailed specifications.

Slides:



Advertisements
Similar presentations
What if ? Scrum 2. What / Why / Who What: a website to indulge curiosity with a social networking aspect. Why: to provide education through a form of.
Advertisements

IS4799 Information Systems and Cybersecurity Capstone Project
DEVELOPING THE GRANT PROPOSAL IDEA. THE IDEA Title Title - Clear -Not cutesy.
Chapter 9 Training for Organizations The Training Proposal: Putting Plans Into Writing.
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Goal Setting a.k.a. How to be successful. Dream + Action Steps + Target Date = Goal.
Unit 12 LO3 Be able to design websites
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Girl Scout Outreach.  Hold Information session with girl scouts  digital movie basics and web development  Earn STEM badges Plan:  experts explain.
EMM – SAP Error Messages Management Tool OMKAR Solutions Inc. Version 1.0.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Developing MARCOM and Outreach activities Group Name: MARCOM Source: Gerry McAuley, Ultan Mulligan Meeting Date: Agenda Item: n/a.
Writing Research Proposal ADS501 Research Method and Data Analysis.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Capstone Project Phase Two! Design Phase – Functional Specification Document.
Introduction to Course Section L02 Bob Travica Information Systems for Management.
Information Architecture Week 1. Information Architecture CALENDAR.
UPGRADE RUNWAY & ELECTRICAL VAULT PRE-PROPOSAL CONFERENCE 12 July WG/LGC SELFRIDGE ANG BASE MI.
4 Writing Academic Proposals Research Methods – Bazara Barry.
R-D Herzberg The SAGE Spectrometer The next four years.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 13 June 2011 ALICE ITS Upgrade Proposal Work organization  Document scope  Timeline  Editorial board and work organization  Status (next presentations)
© 2005 Lawrenceville Press Slide 1 Chapter 4 Website Development Planning 1.Define the purpose and target audience. 2.Sketch the navigation structure.
Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis(
To be completed Your proposal  Your House style  Your site plan  Page plans (a draft layout for each of your five pages)  A design mock-up -  All.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Memory Book Project Communications 12 Mrs. Taylor.
M. Gilchriese Stave Prototype Status Summary July 5, 2006.
Calorimeter Performance Paper Xavier Vilasís-Cardona Calo Meeting - Xvc1.
Game Design Document Pertemuan 4 Matakuliah: T0944-Game Design and Programming Tahun: 2010.
1 Daya Bay Project Design Review Status Ralph L. Brown US Chief Engineer January 9, 2008.
©2012 Microsoft Corporation. All rights reserved. Content based on SharePoint 15 Technical Preview and published July 2012.
Target of this presentation This slide is not part of the presentation Target audience is existing or potential ISA members Before the presentation read.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Synopsis of the Major Project Title of the Project: 6A-P-xx- _____________________________________ _____________________________________________.
Identify and Explain Effective Working Practices OCR Diploma Level 2.
Incident Report Form Training Presentation Risk Department 6 Sterne Road Tatchbury Mount Calmore SO40 2RZ
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
June-18 th -2007ATLAS-MPI; Status of ATLAS Technical Paper, R. Richter1 The ATLAS Technical Paper and back-up papers  Content of the ATLAS technical paper.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
All-Hands Meeting Outcome and Discussion
Update on Measuring Sustainable Tourism
Non-Assurance Services
CMS Luminosity Status Report
Lucerne Publishing Editorial Servi.
Lucerne Services Editorial Services.
End User Support – User Training
Chapter 6 The Journal and Source Documents
GEM Upgrade Projects: Schedule
Calorimeter upgrade meeting
STATUS REPORT.
Go to link above Create account Create a sign up
A01 DESIGN To be completed Your proposal  Your House style 
LBA05 ops meeting Tasso Tzioumis
Presentation title An Overview of Parties’ Submissions on the Review Guidelines for the GHG inventories, national communications and biennial reports Technical.
TSF Upgrade Project Overview Resources Plans and Timetable
Delete a Public Holiday – Holiday Calendar
IEEE IMT-Advanced Review Process
IEEE 802 IMT-Advanced Technology Proposal Process
Training proposal and Reporting
Technical Communication
Chapter 6 The Journal and Source Documents
IEEE 802 IMT-Advanced Technology Proposal Process
IEEE IMT-Advanced Review Process
<insert title> < presenter name >
Title Presenter name DATE Towards a More Sustainable World.
Presentation transcript:

Proposal: Towards a TDR A.TDR means Technical Design Report. B. TDR is detailed report of EXACTLY what will be done and includes detailed specifications. C. A good example of a TDR dated is “Conceptual Design Report for High p T Upgrade” that is 92 pages. (can get from PHENIX web) D. I have volunteered to organize TDR effort and edit.

A Possible Outline A.Introduction (physics, measurement capabilities, layout) B.Resistive Plate Chambers (capabilities, mechanical design, test results, assembly) C.Front End Electronics (capabilities, design, testing) D.Local Level One Trigger (capabilities, design, test results) E.Simulation (rates, background, etc.) F.Integration (plan and detailed layout) G.Cost and Schedule (part of CDR?) H.What items missing??

Action Plan A.I will produce more detailed plan by October 1, 2005 and we all review it. B.I need person (expert) to discuss details with of what goes into each section. C.Who are these people? D.Hope TDR outline will also be guide of jobs to be done. E.Propose TDR complete for PHENIX management July F.Is July 2006 the correct target date?