SEMINAR ON ISLANDING BY PAWAN. What is islanding? Normally all Power generators are interconnected to form a network called ‘GRID’. Some times it so happens.

Slides:



Advertisements
Similar presentations
CONTROLS OF SUPER CRITICAL BOILERS
Advertisements

Reheater Protection Logic
RES-E Impact on Transmission Grid and Power System Reserves
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
Troubleshooting Training Course.  Visual and General Test  Perform System Test (Mode  Perform System Test)  Identify The Error  If you need Technical.
Distributed Intelligence Provides Self-Healing for the Grid
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
GENERATOR PROTECTION.
SURATGARH SUPER THERMAL POWER STATION
April 15 and May 15, 2003 ERCOT System Disturbances ERCOT TAC Meeting June 4, 2003.
Turbine Protection and Control System
POWER GRID CORPORATION OF INDIA LIMITED Presentation on ‘FREE GOVERNOR OPERATION” By D.K.Guru & S.P.Barnwal.
FUNCTIONS OF THE GOVERNING SYSTEM
Active Power and Frequency Control
PRESENTATION FREQUENCY CONTROL
Power Grids Electrical power, in our homes and in industry, is really the life blood of our existence Used for heating, cooling, cooking, refrigeration,
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
Generator Protection. Amount of Protection Rated power of the generator Ratio of its capacity to the total capacity of the system Configuration of the.
Three-Phase ac Voltage Generation
Chapter 7 SYSTEM PROTECTION
Freedom Combi Inverter
HP/LP BYPASS SYSTEM FUNCTION:
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
By A.D.Thirumoorthy Tamil Nadu Electricity Board India.
Use of Relay-to-Relay Communications to Improve the Security and Reliability of DG Interconnection Protection Employing Reverse Underpower Protection Wayne.
GML-3 GPRS BASED METER AND LOGGER THREE PHASE METER WITH INBUILT DATA LOGGER © Embuilt Technologies Visit us at Or For.
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
Electrical Distribution Training
Neptune BU Switching Circuit diagram and operations.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000.
FREQUENCY CONTROL AND AUTOMATIC GENERATION CONTROL
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
TECHNICAL TRAINING INVERTER-Y
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
Topic 5 Enhanced Regulatory Control Strategies. In the previous lecture…  Plant test  Interacting loops.
1 Distributed Generation and Power Quality-Continued.
Steady State Analysis Of A Microgrid Connected To A Power System
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
Hydro Multi-B – (2) or (3) CME Pumps in Parallel
-- Bhanu Bhushan -- < > (August, 2011)
SURATGARH SUPER THERMAL POWER STATION
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
FRCC System Restoration 2016 FRCC System Operator Seminar.
1 Electric Utility Power Systems Generation of Electricity.
TYPE “HOS” 6” Stroke Compressor & Ancillary Equipment
Equipment 1.Circuit Breaker. 3.Fuses. 4.Protecti- ve relay.2.Bus bar. TYPES OF SWITCH GEAR EQUIPMENT:-
 The figure below shows a protection system for a transmission line, consisting of a CT, PT, a relay and its associated circuit breaker.
(c) IRD 2002 Power System Restoration (Black Start) Black Start Panel Session IEEE PES Summer Meeting Chicago, Illinois July 23, 2002 M. M. Adibi IRD Corp.,
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
© Copyright 2016 OGF - Polling – Breakers, Relays, and Disconnects Components Breakers, Relays, and Disconnects.
Components Motors and Generators.
Components Motors and Generators.
Management Of Tulkarm Electrical Network
PHILOSOPH OF ISLANDING
Lesson 16: Asynchronous Generators/Induction Generators
Presented by: LADWP November 14, 2017
Hellenic Grid Code Requirements for Wind Farms Grid connection
Grid feeding monitoring relay
Hellenic Grid Code Requirements for Wind Farms Grid connection
BOILER PROTECTION AND INTERLOCKS
Hellenic Grid Code Requirements for Wind Farms Grid connection
Presentation transcript:

SEMINAR ON ISLANDING BY PAWAN

What is islanding? Normally all Power generators are interconnected to form a network called ‘GRID’. Some times it so happens for a generator to come out of grid, either due to disturbance in grid or due to some other internal reasons. When generator gets disconnected from the grid it is ‘ISLANDED’. The advantages of Islanding in our network: Unit tripping can be avoided Tripping of major critical loads in steel plant & JPOCL can be avoided Generation loss can be avoided Oil consumption can be reduced or avoided If other unit got tripped, it can be restored fast Islanded unit can be connected back to grid much faster, once grid disturbance is cleared.`

How islanding happens? In our network detection of islanding at 220KV will be done under the following conditions: oSensing of open condition of Bus Coupler oSensing under voltage in Bus-2 (islanding bus). Settings are at 75% with 1.5 sec time delay & 73% instantaneous oUnder frequency setting is at 47.6 Hz with 2 sec time delay & 47.5 Hz instantaneous oOver frequency setting at 51Hz with dF/dt of 0.5 Hz/sec oSensing of no power flow <2% in both lines with dF/dt 2 Hz/sec oSensing of Line-1, Line-2 and either of ICT-1 220KV or 400KV breakers

Scenario generation & loads before Islanding: GT-1, CPP-2, ST-1, ST-2, T-1, T-2,T-3,T-4, T-5, T-7, T-8 & T-9 will be connected to BUS-2 (Islanding Bus) GT-2, T-6, T-10, L-1, L-2, ICT-1, ST-3 & ST-4 are connected to BUS-1 CPP-1 will be selected either in mode-1 or mode-2 depending upon their gas availability. Mode-1 will trip CPP-1 in case of islanding and Mode-2 will bring it to house load. CPP-2 has been chosen to put in parallel islanding along with one of our unit. Depending upon the CPP-2 generation and BF-3 status, following modes has been incorporated In case CPP-2 generation is less or it nor required in islanding scheme a face plate is provided in DCS to enable or disable CPP-2 tripping in line loading logic.

Consequences Islanding: In case of islanding & bus coupler open, a hard wired logic provided to trip both the 220KV lines. In this condition if ICT is healthy, then U#2 will survive else it will trip. L1 & L2 breakers open to non-islanding unit trip is removed Islanding detected signal will enable U#1 EHTC: To change over from LOAD to SPEED control A speed reference set point will be generated from EHTC based on below formula NR = NRTD = One hour average actual speed + ((Actual load / 150 )*0.04) rpm NRTD value is limited to rpm on upper side and rpm on lower side. NRTD will be fast tracking NR in speed control mode. Islanding detected signal will annunciated in control room, MSDS control room & JPOCL.

Operator Actions Post Islanding: Immediately after islanding, ensure fuel input is marginally more to boiler than required for islanding load. Depending upon the islanding load & Throttle pressure, HP Bypass should be kept open close to 15%. Match the HP Bypass fixed pressure set point to actual pressure & put HP Bypass in manual. Reduce the HP Bypass SP slowly as per requirement, to keep open the HP Bypass. If unit is running on full coal, as a measure of precaution oil support should be taken. Download Speed Ref SP in Speed ref D/L block with that of NRTD Further regulation in speed can be effected through the increase /decrease arrow in speed ref D/L station. It is to be noted that during the increase in frequency load will increase and accordingly fuel has to be increased.

ISLANDING CHECK LIST:  Islanded unit is running in speed mode  Bus coupler, L-1 & L-2 breakers are in open condition  Drum level in normal limits, if required take S/B BFP in service  Observe for actual speed, if it dropping trend continuously, inform to cut out portion of complex load  For any drop in network frequency, EHTC will try to maintain the frequency SP by injecting more steam flow through CV. At that point of time fuel should be sufficient in the boiler to cater for demand. Hence fuel input, frequency & pressure should be continuously monitored by operator  Islanding bus frequency fluctuation should be less 0.5 Hz / min  Generator PF and MVAR are normal  All equipments are in service / healthy

Normalization:  Ensure the grid conditions are stable & clearance obtained for synchronizing the bus coupler  Reset islanding master trip relay (in islanding panel at MSDS) & ensure islanding detected alarm gets reset in ECP in CR. Islanding cut out should not be done without resetting the relay at MSDS.  Match the speed reference D/L set point with that of NRTD & after matching synchronize the machine by closing the Bus Coupler.  Check the actual load of machine after synchronization.  If the load is less than 45 MW, Increase the Load with Speed Ref D/L Block, Load the machine more than 50 MW.  Set the load reference using Load reference D/L block such that the sum of load reference matches the Actual load.  Reset ISOLATED GRID at EHTC 2 graphic (now it will not reset until Master trip relay is reset, hard wiring done in both units).  Change over Turbine Control from SPEED to LOAD AT EHTC 2 graphic (now change over will not happen until ISOLATED GRID is reset).  Keep HP Bypass in AUTO & load the machine to full  Cut-in Islanding as per requirement

Learning from previous islanding incidents:  On 22/04/08 Islanded unit (U#2) tripped due tripping of feeder on phase failure. Later over load relay settings of feeders are reviewed. As preventive action sufficient oil support should be taken irrespective of available fuel.  On 01/07/08 Unit#1 got islanded while cutting in islanding, as Bus coupler open feedback is persisting. As precautionary measure, one additional alarm K35 relay operated hooked up in DCS to annunciate the operator. If K35 relay acted alarm is persisting, islanding should not be taken in service.

THANK YOU ALL