2 BT.KFAs kicker rise time measurements (December 2015) L. Sermeus TE/ABT/FPS LIU-PSB meeting, 19 th January 2016.

Slides:



Advertisements
Similar presentations
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
Advertisements

Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
1/10/2014 LIU-PS ABT review1 T. Kramer, L. Ducimetiere, L. Sermeus.
Progress of the BEPCII Injection System Kang Wen.
NLC - The Next Linear Collider Project Keith Jobe May 1999 Damping Ring Kicker Development.
Experience of High Voltage Conditioning of Kicker Magnets M.J. Barnes Acknowledgements: G. Bellotto, P. Burkel, H. Day, L. Ducimetière, T. Kramer, V. Gomes.
Magnets for Mu2e Resonant Extraction: Design and Scope Changes V.Nagaslaev 05/09/2013.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURING AND EXPERIMENTAL PROGRAM C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT),
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
© 2000 Prentice Hall Inc. Figure 1.1 Block diagram of a simple electronic system: an AM radio.
Voltage Divider Bias ELEC 121. January 2004ELEC 1212 BJT Biasing 3 For the Voltage Divider Bias Configurations Draw Equivalent Input circuit Draw Equivalent.
Status of Fast Pulser and Kicker Work at UIUC and Cornell Robert Meller Cornell University Laboratory for Elementary-Particle Physics.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Transmission Lines No. 1  Seattle Pacific University Transmission Lines Kevin Bolding Electrical Engineering Seattle Pacific University.
Module 2 : Behavioral modeling TOPIC : Modeling a Digital pulse UNIT 1: Modeling and Simulation.
Prompt Kicker M. Aoki. 2 3 H-Line Kicker Prompt Burst: 5e8 / H-line exit – Any detectors will be saturated. Need to reduce the prompt burst.
Spares for Critical Items Kickers W. Weterings SPS Consolidation Review Laurent Ducimetiere, Patrick Faure, Luis Miguel Coralejo Feliciano, Remy Noulibos,
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
DC Spark Developments Nick Shipman - Thursday, 16 August
Status of ATF Fast Kicker Experiment
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
Feasibility of, and options for, the new MKE kicker concept M.J. Barnes, T. Kramer Acknowledgements: L. Ducimetière, B. Goddard, B. Salvant, J. Uythoven,
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
PSB-PS TRANSFER AT 2 GEV - CONCEPTS AND OPTICS W. Bartmann, J. Abelleira et al. ABT LIU Review, 20-Nov-15.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Week 4: Experiment 24 Using Nodal or Mesh Analysis to Solve AC Circuits with an addition of Equivalent Impedance.
LER workshop 2014 Update on the Extraction Kicker for CLIC DRs: Calibration Tests C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral.
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
, IDS Meeting, Fermilab J. Pasternak Challenges of muon FFAG: injection/extraction, beam dynamics and injection/extraction hardware design studies.
Injection/Extraction Kicker CR Aleksey Kasaev BINP-FAIR-GSI workshop
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Enhancement Presentation Carlos Abellan Barcelona September, 9th 2009.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
FONT5 digital feedback boards
Beam Secondary Shower Acquisition System: Front-End RF Design
CMPE212: LABORATORY Discussion Hours: Fri 1:00 – 1:50PM in ITE 227
CT Hardware Overview and Issues
Using MathCAD, Matlab and PSpice for electronics simulations
Options and Recommendations for TL and Dumps
MKD Waveform Measurements
Future Kicker Generator strategy
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
F.Marcellini, D.Alesini, A.Ghigo
Acknowledgments: LIU-PT members and deputies, H. Bartosik
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
High Rep Rate Circuits 2 and 3 specification/Wish List
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
LIU and TE/ABT/PPE activities
Fast Kicker R&D in the Americas Region
Impedance working group update
FCC-hh injection group 7
Damping Ring Kicker Tests at AØ
Strip-line Kicker R&D at KEK-ATF
Also on behalf of V. Senaj & L. Ducimetière
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
Limits on damping times
Week 4: Experiment 24 Using Nodal or Mesh Analysis to Solve AC Circuits with an addition of Equivalent Impedance.
Serial interfaces 2nd semester
PSB magnetic cycle 900 ms MeV to 2 GeV
Andrew Hutton Concept suggested independently by Haipeng Wang
Fast kicker beam dynamics simulations
KFA10 status 20/05/2019 Currently:
PS KFA45_17 Wire Measurements and Simulation
KFA10 status 03/06/2019 Currently:
Presentation transcript:

2 BT.KFAs kicker rise time measurements (December 2015) L. Sermeus TE/ABT/FPS LIU-PSB meeting, 19 th January 2016

3 BT1.KFA10 kick (measured waveform at 50 kV) Kick rise time:(5-95)%102ns (2-98)%134ns (1-99)%164ns Scope: 200MHz BW, 13 bits vertical resolution

4 BT1.KFA10 kick (Pspice calculated waveform) The actual ferrite grade is assumed to be 4L1. (must be replaced by 8C11) Cable impedances are not exactly 25Ω. (variations from 24.8 to 25.5 for PFLs and Transmissions explain reflections) From revised PSPICE model Rise (1-99)% Rise (2-98)% Rise (5-95)% Calculated 8C11 (green) 116ns 109ns 95ns Calculated 4L1( orange) Measured (red) LIU (2GeV) 105ns LIU (1.4GeV) 104ns

5 BT4.KFA10 kick (measured waveform at 50 kV) Kick rise time:(5-95)%116ns (2-98)%138ns (1-99)%186ns Scope: 200MHz BW, 13 bits vertical resolution

6 BT4.KFA10 kick (Pspice calculated waveform) The actual ferrite grade is assumed to be 4L1. (must be replaced by 8C11) Cable impedances are not exactly 25Ω. (variations from 24.8 to 25.5 for PFLs and Transmissions explain reflections) Kick sum of 2 magnets (From revised PSPICE model) Rise (1-99)% Rise (2-98)% Rise (5-95)% Calculated 8C11 (green) 110ns 104ns 92ns Calculated 4L1( orange) Measured (red) LIU (2GeV) 105ns LIU (1.4GeV) 104ns

7 One generator supplying two magnets in parallel. Magnets equipped with their original glued ferrite blocks of assumed 4L1 type. BT1.KFA10 present system layout

8 New vacuum tank with magnets equipped with “good” 8C11 or CMD5005 ferrite. (ready end 2017) Tests in the laboratory on KFA20 spare (already equipped with CMD5005) in the same configuration as KFA10 to refine the Pspice equivalent circuit and simulate improvements to reach the specification. Implementation in the lab to validate the model.(in 2016) If proven to be efficient, rearrange present Tx-PFL pairs to reduce mismatches during the EYETS. As a last resort, cut new transmission cables from the PFLs which are longer than necessary (or install new transmissions if we manage to obtain them) for a better matching. If rise time can ultimately not be met, split magnets in two and build two new generators to supply them. (assuming we can buy SF6 cables) This option is not presently funded nor staffed. BT.KFA10 improvements for LIU

9 BT2.KFA20 kick (measured waveform at 27 kV) Kick rise time:(5-95)%78ns (2-98)%94ns (LIU 104ns) (1-99)%270ns Scope: 200MHz BW, 13 bits vertical resolution

10 One generator supplying two magnets in parallel. Magnets equipped with CMD5005 ferrite blocks. Magnets are charged with the PFLs. BT2.KFA20 present system layout

11 BT2.KFA20 kick (Pspice calculated waveform) From revised PSPICE model The present kick waveform complies with LIU specification without margin. The overshoot is not present in the measured waveforms. Cable impedances are not exactly 25Ω. (variations from 24.8 to 25.5 for PFLs and Transmissions explain the reflection bumps) LIU (2GeV) 105ns LIU (1.4GeV) 104ns Measured (red) Calculated 8C11 (green) 91ns 83ns 70ns Rise (1-99)% Rise (2-98)% Rise (5-95)%

12 Improve matching of cables to reduce the amplitude of the two bumps. Improve filters (mainly on the main switch) to reach 100% earlier. Reduce kick strength by a few % to reduce the magnet breakdown risk. (studied by W. Bartmann) If the new KFA10 is within specification, the KFA20 could then be reconfigured the same way to avoid magnet breakdowns. No LIU work unit exists for this. BT2.KFA20 improvements for LIU