Facility Assessment Reports FY 16 Survey Results June 9, 2016.

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2J: Building.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Cambrian School District 5-year Facilities Maintenance Plan Update 8/25/11.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
Property Appraiser and Tax Collector Office Space Update July 8, 2014.
Nonprofit Facilities Planning and Management
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Building Codes and Interior Design
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Facilities Condition Audit Summary of Findings Entech is a full-service Architectural/Engineering firm providing design, construction management, facilities.
Bainbridge Island School District 303 September 2015 MASTER PLAN.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Designing and Programming Schools As Community Learning Centers Firestone/Litchfield Community Learning Center Community Update September 27, 2011 Community.
Facilities Condition Assessment Initiated: February 2004 Consultant: ISES Corporation Stone Mountain, GA Scope: Identify the conditions of our facilities,
Sinking Fund Millage Renewal Election- May 7, 2013.
ID 308 Construction + Materials IV: Construction Documents Prof. Brody Endicott College Systems Coordination.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
Capital Improvement Program for September 9, 2014.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
Chapter 6 ID 234 Building Codes Fire Suppression.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Welcome to the Stafford Elementary Town Hall Meeting! January 12, :30-7:30 pm Mary W. Foreman, Stafford Elementary Principal Alexis White, Stafford.
City of Gainesville Facilities Management Department Citizen’s Academy April, 2016.
Cuba-Rushford CSD Capital Project
White Pigeon Community Schools
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Upon completion of this module, you will be able to:
Asset Planning & Optimization Capital Renewal Strategies
OABCIG General Obligation Bond Referendum Presentation
Capital Improvements Plan
Capital Project Needs Assessment
Fall 2017 Update: Physical properties and sinking fund
Construction Documents
CIHQ - All Rights Reserved 2017
Joint Schools Construction Board Phase II
REFERENDUM Your vote matters! September 26, 2017
Dr. Joseph Meloche Superintendent of Schools Mrs
New Morehead State Bowling Facility
Commercial Building Project Portfolio
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
UNION GROVE ELEMENTARY REFERENDUM
VENTILATION ASPECTS OF INDOOR AIR QUALITY
2018 Bond Review and Proposal
The Engineering and Maintenance Division
The Asset Management Journey for Building Assets
Carleton College Facilities Management
Charter Oak Unified School District
Capital Outlay Workshop
Pillager Public School District Community Survey Results
Master Facilities Committee Evaluation and Identification
Mount Vernon Community School
377th Mission Support Group/ Contracting Division Construction Branch
Caryl Community Center
Community Practice Asset Management.
Dixon Middle School Project Update
Zumbrota-Mazeppa School District Community Survey Results
Westerly School Legacy Plan: A Vision for the Future of Education
Presentation transcript:

Facility Assessment Reports FY 16 Survey Results June 9, 2016

Intent Create a inventory of capital improvements necessary to maintain the surveyed facilities under their current program and use. General and monthly maintenance issues were also included as ancillary observations. Assessments and reports conducted and prepared by

B UILDINGS S URVEYED IN FY2016 Athletic Club Ice Rink Stonehouse Art Center Teen Center Other Barn Maintenance Facility All CA buildings to be assessed by FY2020

A REAS OF C ONCERN Site/Civil Structural Envelope (roof and siding) Interior Mechanical & Plumbing Systems Electrical Accessibility (ADA) Aquatics (Athletic Club only) Each area includes short description of components and details of findings Service items were categorized into high, medium, and low priorities with recommended time frames of 0-1 yr, 2-3 yrs, & 4-5 yrs, respectively Cost estimates were provided for each service item and reported by area as well as priority level

Athletic Club Major High Priority Items Extensive stucco (exterior) repairs Roof replacement HVAC replacement Compliant emergency visual notification coverage associated with fire alarm Increase emergency battery pack & exit lighting High Priority = $1.3 million Medium Priority = $500,000 Low Priority = $300,000

I CE R INK Major High Priority Items Replace roof over locker room Replace chiller Replace RTU Add air conditioning/ventilation to locker rooms Repair gaps in ceiling insulation over ice Increase and survey emergency battery packs, exit signs, & egress pathway lighting High Priority = $650,000 Medium Priority = $200,000 Low Priority = $500,000

Stonehouse Major High Priority Items *Replace main roof Adequate emergency battery pack & exit lighting High Priority = $330,000 ($3,000 w/out roof) Medium Priority = $20,000 Low Priority = $280,000 Art Center Major High Priority Items *Replace main roof Replace circuit breakers for RTUs Adequate emergency battery packs, exit signs, & egress pathway lighting High Priority = $340,000 Medium Priority = $190,000 Low Priority = $250,000 * Main roof is shared by both facilities

T EEN C ENTER Major High Priority Item Replace roof High Priority = $140,000 Medium Priority = $40,000 Low Priority = $150,000 O THER B ARN Major High Priority Items Replace roof Replace Air Handling Unit Replace branch circuits and panelboards Repair walls & ceilings after electrical work Update entry points with key pads and cameras High Priority = $240,000 Medium Priority = $70,000 Low Priority = $160,000

Maintenance Facility Major High Priority Items New sprinkler system Repair walls & ceiling after fire alarm work Provide compliant emergency visual & audio notification High Priority = $340,000 Medium Priority = $60,000 Low Priority = $230,000

Summary All buildings are structurally sound but showing their age aesthetically and in the mechanical systems Large number of HVAC components or mechanical systems have reached or are soon reaching the end of their American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) estimated service life Open Space & Facilities has already identified “low hanging fruit” for all 7 buildings regardless of priority level and has begun addressing these issues High cost items have been incorporated into Capital Improvements Plan High Priority – FY18 Medium Priority – FY20 Low Priority – FY22