GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Advertisements

© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 6 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Page 1 GLAST LAT ProjectAugust 30, 2004 GLAST Large Area Telescope: LAT Accelerometer and Thermal Instrumentation Review Presented by Leonard Lee John.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Environmental Test Planning
LAT Requirements Verification in TVAC
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
GLAST LAT System Engineering
GLAST Large Area Telescope
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
Environmental Test Planning Meeting
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
Introduction and Overview
Overview Cost to Complete
Integration & Test Instrument Operations Coordination
Design Integration and Analysis
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Thermal Vacuum Test: Plans and Procedures Jesse Armiger Thermal Vacuum Test Director Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 2 Agenda Compliance to requirements –System level analysis –Subsystem tests Thermal vacuum test overview –Environmental test flow –Thermal vacuum test timeline –Timeline analysis –Thermal Test Requirements –Thermal STE Thermal vacuum test readiness –Thermal vacuum test test plans and procedures –Pre-test predicts –Facilities readiness and certification –Test staffing Conclusions

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 3 Compliance to Requirements All flight system thermal design analyses have been successfully completed and demonstrate adequate margin All LAT subsystems have been successfully thermally tested in compliance with governing documents Governing Documents: –Level IIA (NASA) Mission System Specification: 433-SPEC-0001 –Thermal design requirements Mission Assurance Requirements: 433-MAR-0001 –Thermal test and verification requirements LAT-SC Interface Requirements Specification: 433-IRD-0001 –Interface requirements –Level IIB (SLAC) LAT Environmental Requirements Specification: LAT-SS –Design and test requirements LAT Performance Verification Plan: LAT-MD –Verification test definition

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 4 Compliance to Requirements System level thermal analysis show compliance to requirements

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 5 Compliance to Requirements All lower level flight system verification activities have been satisfactorily completed per LAT-SS-00778

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 6 Compliance to Requirements All lower level flight system verification activities have been satisfactorily completed per LAT-MD Test Procedures, Reports, and ATDPs are posted on the GLAST homepage ( under “Subsystems”

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 7 Radiator/TCS Subsystem thermal vacuum testing: –Testing of the LAT Radiator subassembly was successfully completed on 9/2/05 Survival mode testing demonstrated that the VCHPs were successfully closed by the reservoir heaters but reservoir temperatures were significantly below predictions –Documentation GLS , GLAST Radiator Thermal Vac Test Procedure, 8/22/05 GLS , GLAST Radiator Assemblies Thermal Vacuum Test Report, 09/12/05 GLS , GLAST Radiator Assembly Thermal Vacuum Test Correlation Report –NCRs VCHP reservoir heater operation during Survival Mode + Y Radiator antifreeze heater primary and redundant circuits crosswired Suspect flight telemetry (+Y Radiator VCHP reservoirs) Compliance to Requirements

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 8 Thermal Vacuum Test Overview Initial flight system comprehensive performance testing has established a valid performance baseline that complies with requirements Final Pre-TV Sine Vibe L Mount Radiators Acoustic L T-CycleT-Bal Remove Radiators Weight CG Ship to Spectrum C L L Receive, Unpack T L Pack LAT CSSCS Baseline FCS at SLAC Ship to NRL L LL Pre Post-Axis L Limited Performance Test Comprehensive Performance Test SVAC Test C S F T E TCS Functional Test EMI/EMC Emissions/Susceptibility Test L Limited Performance Test Comprehensive Performance Test SVAC Test C S F T E LAT Functional and FSW Test TCS Functional Test EMI/EMC Emissions/Susceptibility Test F NRL Post-Ship C EMI/EMC L E L TESTING IN THERMAL VAC CHAMBER

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 9 Thermal Vacuum Test Overview

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 10 Thermal Vacuum Test Overview Timeline Analysis

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 11 Thermal Vacuum Test Overview Thermal Test Requirements

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 12 Thermal Vacuum Test Overview Thermal STE

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 13 Thermal Vacuum Test Readiness Thermal vacuum test test plans and procedures –Test Plan Status Initial plan released 6/05: LAT-MD Final version ready for release –Updates reflect changes test sequence, test hardware configuration and other changes which have occurred since the initial release –Test Procedure Status Initial procedure released 3/06: LAT-MD Final version in progress (Expected Completion 6/23/06) –Remaining TBDs: »Final temperature sensor list and alarm limits »Figures showing temperature sensor locations –Final walk-throughs with the NRL test team, the electrical test team, and SLAC systems engineering will take place prior to final release

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 14 Thermal Vacuum Test Readiness Pre-test predicts

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 15 Thermal Vacuum Test Readiness Facilities readiness and certification –TVAC Chamber Cleaning of TVAC chamber complete TVAC chamber certified and ready for testing –Data Acquisition System Ready for STE Validation Test and TVAC Test –Specialized Test Equipment (STE) and Test Stand STE Validation Test currently underway Extra configuration needed for TVAC Test complete by 6/29/06 LAT-DS & LAT-DS show STE and Test Stand thermal build configurations –LAT Extra configuration ready for TVAC Test by 7/6/06

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 16 Thermal Vacuum Test Readiness Test Staffing –Shift Schedule in Progress –Available resources Jesse Armiger Jack Goodman Brett Pugh Jeff Wang Eric Grob Carlton Peters Hume Peabody Bryan Matonak Debbie Zakar

GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 17 Conclusions Work still to be performed: –Complete Thermal STE validation test –Add test software GUI to support upload of thermal parameters –Complete final revision of test procedure –Complete final test preparations at NRL –Hold Test Readiness Review Pending completion of the above items, the LAT will be ready for thermal vacuum test