AMERICA’S ARMY: THE STRENGTH OF THE NATION AMERICA’S ARMY: THE STRENGTH OF THE NATION HQDA EXORD 164-15 Reduce the Installation Facility Footprint 23 June.

Slides:



Advertisements
Similar presentations
Review of the Incident Command System
Advertisements

THE LUBRECHT REPORT: A MID-WAY ASSESSMENT OF THE 10 -YEAR WILDERNESS STEWARDSHIP CHALLENGE Developed By: The Wilderness Advisory Group April 2010.
Civilian Property Realignment Act The need to reform defined.
Defense Reform Update for Secretary of Defense William Cohen by Stan Soloway November 8, 1999 Defense Reform Update for Secretary of Defense William Cohen.
Administration, Management, and Coordination of Supportive Housing: Guidelines from CSH’s Dimensions of Quality MHSA TA Operations Call September 1, 2010.
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
1 Depart of Energy RE/FIMS Workshop 2011 REAL ESTATE.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Stephen TerMaath Chief, BRAC Program Management Division 5 June.
BRIEFING ON DOD-IG AND GAO AUDIT REPORTS FOR THE DOD FLEET MANAGEMENT WORKSHOP Mercury Associates Gary R Hatfield
United States Department of Agriculture Office of Procurement and Property Management U.S. Dept. of Agriculture Property Management Division PMD Freeze.
Space Bank & Freeze the Footprint May 22, 2013 Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
Army Installation Briefing Ms. Diane M. Randon, Deputy Assistant Chief of Staff for Installation Management, Department of Army Wednesday, June 12, 2013.
BMMP DoD’s Business Management Modernization Overview and Update to ASMC Marilyn Fleming, Deputy Director, Enterprise Architecture Business Modernization.
2012 ADC WINTER FORUM | PAGE 1 Enhanced Use Leasing: Update & Opportunities Dr. Craig College, February 29, 2012.
NPR C NASA Real Property Management
Office of the Auditor General of Canada The State of Program Evaluation in the Canadian Federal Government Glenn Wheeler Director, Results Measurement.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Dr. Stephen TerMaath Chief, BRAC Program Management Division 22.
Excess Facilities As a Result of Force Reductions Presented at the 2014 National Summit June 2014 Rick Marrs, PE Deputy Director, Facilities Directorate.
NASA Real Property Program August 20, 2014 Scott Robinson Director, Facilities Engineering Division Acting Director, Integrated Asset Management Division.
Program Name or Ancillary Texteere.energy.gov John Shonder, Director DOE Sustainability Performance Office May 21, 2015 Sustainability at the Department.
Installation Management Update Association of Defense Communities Mr. Jonathan Hunter Deputy Chief of Staff Installation Management Command 14 January.
The Challenge of Excess Defense Facilities:
Strategic Planning for EEO & HR Offices Dinah Cohen CAP Director Derek Shields CAP Program Manager EEOC Executive Leadership Conference – May 3-5, 2011.
Sustainability and Total Cost of Ownership Strategies for Higher Education.
New Opportunities for P3s on Military Installations NCPPP Conference July 2014 Barry Scribner Co-President, Public Institutions JLL.
U.S. Army Materiel Command | Army Sustainment Command U.S. Army Sustainment Command FORSCOM CDR’s Conference DOL Transition Update 2 OCT 2012 COL Dan Reilly.
Disposing of Unneeded Federal Real Estate May 2011.
Legacy Management Strategic Plan 2010 David Geiser Director, U.S. Department of Energy (DOE or Department) Office of Legacy Management (LM) November 2010.
1 Pipeline Measurement Process Review Committee Kickoff Session Paul Blackwell Office of the Deputy Assistant Secretary of Defense for Supply Chain Integration.
Mr. Frank J. Anderson, Jr. President, Defense Acquisition University Acquisition Education Challenges and the Human Capital Strategic Plan.
Public-Public Partnerships – A Bootcamp for Communities Hibiscus A.
2011 ITRC Spring Membership Meeting Minneapolis, Minnesota April 6, 2011.
Presented By LTC E. S. Crow Construction Branch Chief.
ASA (FM&C) 1 Department of the Army Mass Transportation Benefit Program (MTBP) Outside the National Capital Region (NCR) Guidance for Program Points of.
Cultural Resource Management in the Department of Defense September 29, 2005 Maureen Sullivan Federal Preservation Officer.
Alaska’s Behavioral Health System Presentation to the Idaho Behavioral Health Transformation Workgroup March 24 th 2010 Bill Hogan Commissioner Commissioner.
2010 UBO/UBU Conference Health Budgets & Financial Policy Briefing: Strategic Plans for UBO Date: 24 March 2010 Time: 0800–0850.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
Headquarters Perspective Carmelo Melendez May 2015.
2 William P. McNally Assistant Administrator for Procurement NASA Procurement Tenets August 4, 2008 NCMA Conference.
Phoenix Convention Center Phoenix, Arizona Retained Energy Savings: A Success Story Track 1 Retained Energy Savings: Putting It into Practice Don JUHASZ,
Office of the Assistant Secretary of the Army Installations and Environment Our Installations Supporting the War: Relevant and Ready “Installation Transformation.
SQUADRON LEADERSHIP SCHOOL Seminar 3.1 Squadrons: The Heart of CAP.
1 Report Tile UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Attracting the Next Generation Accountants.
DOE ASSET MANAGEMENT PLAN
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
Environmental Officer Course Introduction Fort Wainwright, Alaska Environmental Officer Course 2011 Name//office/phone/ address UNCLASSIFIED 12/24/2015.
Budget Analysis Presented by: Jay Masterson. Preface ► The budget was developed with reduced funding as an expectation ► Recognition of the current economic.
VP Quarterly Report on Strategies Q3– February 2, 2016 Robbie Peters, Vice President, Financial Services & Chief Financial Officer Vision: Healthy people,
UNCLASSIFIED / FOR OFFICIAL USE ONLY USAFMCOM UNCLASSIFIED / FOR OFFICIAL USE ONLY.
Assessing Army Infrastructure
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
FIMS Data Quality FIMS Annual Training May 10-12, 2016 Prepared by: Mark Gordy and Gayle Smith.
1 of 32 Performance Measures and the State of Our Facilities Eric Haukdal MA-50 Office of Asset Management.
Prepared for the Facility Information Management & Real Estate Annual Comprehensive Training May , 2016 Orlando, FL Real Property Efficiency Plan.
Demonstrating Success: NASA Performance and Results Mike A. McNeill Environmental Management Division NASA Headquarters.
1 The Department of Energy And Electronics Stewardship : How DOE Attained “Green Status” on the OMB Environmental Scorecard Federal Environmental Symposium.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
Office of Infrastructure and Management Results-Oriented Government: The Executive Branch Management Scorecard January 25, 2006 White House Summit on Federal.
1 Getting to Green at the Department of Energy Progress on OMB’s Environmental Sustainability Scorecard Andy Lawrence Director, Office of Nuclear Safety,
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Increasing Utilization of DoD Facilities Opportunities and Obstacles John Walker - Deloitte Consulting, LLP June 2016.
2016 ADC TRANSITION POLICY DOCUMENT FORUM. Key Policy Issues.
City Owned Land And Building Review
Dr. Vida G. Wright, P.E., F.SAME Southwest Region Vice President
Environmental Quality Program Strategy
Brigade (Bge) / Battalion (Bn) / Directorate Housing Office
Workshop Session I.
“Solid Waste Management: Line Item Expense or Resource Management“
Presentation transcript:

AMERICA’S ARMY: THE STRENGTH OF THE NATION AMERICA’S ARMY: THE STRENGTH OF THE NATION HQDA EXORD Reduce the Installation Facility Footprint 23 June 2016 Mr. Paul D. Cramer Deputy Assistant Secretary of the Army (Installations, Housing & Partnerships) Deputy Assistant Secretary of the Army (Installations, Housing) MG Ted Harrison Director of Operations, Office of the Assistant Chief of Staff for Installation Management Mr. Greg Kuhr Director, G-4 Installation Management Command Partnerships)

AMERICA’S ARMY: THE STRENGTH OF THE NATION Army Excess Infrastructure Strategy ELEMENT #1: Consolidation Within Installations o EXORD o Force structure reductions create underutilized space o Conversions can be challenging o Base Operations Support inelastic to reductions in population o Not all excess is bad; demolition not universal solution o Likely savings modest (tens of $ millions/year) ELEMENT #2 Consolidation Across Installations o European Infrastructure Consolidation: ~$163M/year savings starting in FY21; close 27 sites, eliminate ~ 8 MSF of excess capacity o EXORD not a substitute for BRAC o BRAC saves hundreds of $ millions/year o High quality excess at high military value installations used to receive missions from closing lower military value locations. 2

AMERICA’S ARMY: THE STRENGTH OF THE NATION How it is Supposed to Work 3

AMERICA’S ARMY: THE STRENGTH OF THE NATION AMERICA’S ARMY: THE STRENGTH OF THE NATION Overview Execution Order : Reduce the Installation Facility Footprint Issued by Army Vice Chief of Staff, Published March 2015 Holds Senior Commanders at installations accountable for making all reasonable efforts to maximize space utilization, consolidate units into our best facilities, and dispose of excess assets Army-wide excess capacity: K Total Army o Average $3/SF per year cost to maintain o Average $11/SF to demolish o Excess costing Army ≥ $500M/year Senior Commanders (SC) identified subset of ~47 MSF to divest: o Convert excess to satisfy another functional shortfall o Retain for expansion or swing space o Reduce off-post leases o Demolish if in poor or failing condition 4

AMERICA’S ARMY: THE STRENGTH OF THE NATION Major Road TRAINING AREA CANTONMENT AREA Major Road Parade Field Reserve Center Installation of the Future: Business Parks w/Training Areas Gate Multi-Function Operations Area Brigade HQ Battalion HQs Company Ops Motor Pools Logistics Gyms Dining Facilities Multi-Function Training Area Trng Barracks Instruction Bldgs Dining Facilities Gen Purpose Admin Non-Army tenants Health Clinic Off-Post: Commissary PX Bowling Alley (MWR) Hospital Child Devel Cntrs Banks Housing HQ Future: Multi-Purpose, Multi-Story, Multi-Tenant, Mixed Use Buildings? Communities have opportunity to help Army shrink the fenceline and open-up valuable real estate opportunities. New Fenceline Multi-Modal Transit Center EUL? Open Post Possible Return To Training Area? 5

AMERICA’S ARMY: THE STRENGTH OF THE NATION The Office of Management and Budget : Freeze the Footprint ( ) directed agencies to freeze office and warehouse SF baselines. DoD met or exceeded the FTF policy objectives The Office of Management and Budget March 2015 – National Strategy for the Efficient Use of Real Property and Companion RTF Policy; requires all departments to Submit annual real property efficiency plans that: (1) Set annual SF reduction targets (2) Adopt space design standards to optimize federal domestic office space usage (3) Maintain the 2015 RtF baseline FY 15 Army Management Action Group’s (AMAG) directed rightsizing to reduce costs HQDA EXORD “Reduce the Installation Facility Footprint,” tasks OACSIM as the lead agent for reducing installation footprints and costs Facility Investment Strategy (FIS) established the facility Lines of Effort (LoE) aimed at balancing the Army’s facility investments and for improving the quality of its infrastructure Facility Investment Guidance (FIG) provides the annual guidance in support of accomplishing the FIS, Rightsizing Strategy, and Army priorities Why are we doing this? UNCLASSIFIED Guiding Documents 6

AMERICA’S ARMY: THE STRENGTH OF THE NATION TRAINING AREA CANTONMENT AREA Major Road Parade Field Reserve Center HQ Installation of the Present Today: Mostly single tenant, mostly 1-2 story, single function/specialized buildings Fenceline Housing Zone Barracks GFOQs Officer Hsg Senior Enlisted Hsg Transient Hsg Gate Operations Zone Brigade HQ Battalion HQs Company Ops Motor Pools Logistics Gyms Dining Facilities Training Zone Trng Barracks Instruction Bldgs Dining Facilities Gen Purpose Admin Non-Army tenants Health Clinic Community Zone Commissary PX Bowling Alley (MWR) Hospital Child Devel Cntrs Banks Major Road Consolidation without community Involvement keeps the most valuable real- estate in Army hands. 7

AMERICA’S ARMY: THE STRENGTH OF THE NATION Army Facility Degradation is Accelerating Good facilities rated >/=90 FCI Fair facilities rated 80 to <90 FCI Poor facilities rated 80 to 60 FCI Failing facilities rated <60 FCI Percent of Facilities with Green/Amber/Red/Black Ratings Best. Worst Trying to sustain all facilities with less money is a proven recipe for failure Facility Condition Index (FCI) rating in Army Installation Status Report (ISR) System BCA budget caps correlate with rapid facility condition degradation 8

AMERICA’S ARMY: THE STRENGTH OF THE NATION The Army identified current challenges facing the efforts to rightsize the installation footprint and achieve auditability in four key Focus Areas The data transfer process between State, Federal, and HQDAs real property reporting systems are manual, providing opportunities to introduce human errors Current real property reporting processes are not standardized and lack internal control measures Rather than a single system, there are four separate systems each of which has a different owner, and it is often unclear how systems relate and record data Due to the limitations of real property system Decision Support Systems (DSS), the Army is unable store and process classified real property documentation or link/track facilities Existing policies can be clarified and streamlined to ensure that real property accountability guidance is understandable and to enforce cooperation between commands and units on real property Policies must include incentives for completing real property management. Current policies do not enforce a culture of compliance The roles and responsibilities for real property are unclear between Landholding Commands (LHCs) and Army Commands (ACOMs) LHCs and ACOMs lack dedicated, adequately trained personnel to perform real property assessments People Policy Process Technology PeopleProcess Technology Policy Key Challenges 9

AMERICA’S ARMY: THE STRENGTH OF THE NATION INSTALLATION MANAGEMENT COMMAND OBJECTIVES Ensure quality facilities are retained per Army standard allowances to support our changing force structure. Reduce sustainment and utility costs by disposing of excess facilities or placing into caretaker status until disposed or re-utilized. Improve the accuracy of real property accountability, requirements and utilization data. Follow Real Property Master Planning principles which increases facility density, retains green space, and retains the flexibility of multi-use facilities. 10