LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.

Slides:



Advertisements
Similar presentations
Cryogenic discussion and update 30 October 2014Neutrino platform.
Advertisements

SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
P ROJECT D ELIVERY M ETHODS. EFCA … is the sole association representing the engineering consultancy and related services industry in Europe represents.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
F. Gianotti, AFP kick-off meeting, 20/9/2012 Recommendations for the next steps Reports from the:  Technical Review A.Henriques  Physics Review R.Hawkings.
Long-Baseline Neutrino Facility LBNF Summary of FSCF Final Design Parameters Meeting at SURF, 10 Aug 2015 Elaine McCluskey, LBNF Project Manager EFIG 19.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Logistics Workshop Summary Mike Headley August 19, 2015.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
LBNF status. Process to chose 2 SPs Candidates who accepted (vote starts the 27 th ) : Milind Diwan Chang Kee Jung Sanjib Mishra Andre Rubbia Jim Strait.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
THE ATTRACT INITIATIVE Marzio Nessi, Markus Nordberg CERN.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Long-Baseline Neutrino Facility LBNF Integration - Interfaces, Config Mgmt and Requirements Jeffrey Dolph LBNF/DUNE DOE/SC CD-1 Refresh Review July 14-16,
EHN1 Cryogenic Integration Requirements David Montanari / Johan Bremer Jun 18, 2015 Rev. 1.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
CERN Neutrino Platform 4 th April, 2014 FNAL M.Nessi.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
Concept Design for LBNF Far detector (LAr single phase)
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Project 29 September 2015.
News from LBNF C. J. Mossey, LBNF Project Director DUNE Collaboration Meeting - South Dakota School of Mines and Technology 19 May 2016.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
General Introduction Markus Nordberg (CERN DG-DI-DI) 1
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Advanced European.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Status N. S. Lockyer
HL-LHC Review of WP 1 Lucio Rossi – CERN 3rd general meeting for application 20 October 2010.
Long-Baseline Neutrino Facility LBNF Update: LBNF EVMS Implementation for CD-3a Elaine McCluskey, LBNF Project Manager Bob O’Sullivan, Project Controls.
Long-Baseline Neutrino Facility LBNF LBNF Project C. J. Mossey, LBNF Project Director 49 th Annual Fermilab Users Meeting 16 June 2016.
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Long-Baseline Neutrino Facility LBNF LBNC: Far Site Update and Planning Mike Headley LBNF Far Site Facilities Project Manager January 11, 2016.
Long-Baseline Neutrino Facility LBNF Update on LBNF to Long-Baseline Neutrino Committee Elaine McCluskey, LBNF Project Manager 13 June 2016.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
Challenges to get LBNF ready for Far Detector installation ASAP Elaine McCluskey ELBNF Proto-Collaboration Meeting 22 Jan 2015.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
1 DOE Independent Project Review Critical Decision-3a Long-Baseline Neutrino Facility/ Deep Underground Neutrino Experiment (LBNF/DUNE) Project DOE Executive.
IEFIG update Joe Lykken | iEFIG Chair ELBNF IB phone meeting | 6 March 2015.
Long-Baseline Neutrino Facility LBNF Elaine McCluskey, LBNF Project Manager Fermilab PAC Meeting 23 June 2015.
LBNE Project Scope, Cost, Schedule and International Involvement 1 Jim Strait, Fermilab LBNE Project Director P5 Meeting 3 November 2013.
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Neutrino Projects
LBNF CAD models, Drawings and Component list
Uppsala Commitment to ESS and FREIA Planning
Ways to industry participation in CLIC 24th October, 2017
Status of the PANDA Magnet
Warm structure requirements :
EHN1 Neutrino Installation Plans
Construction, Operation and Maintenance Standards for Water and Wastewater Utilities SCRWA Annual Conference December 6, 2017.
EU Institution Board 1 representative of each participating institute
ESS RF Development at Uppsala University
as a prototype for Super c-tau factory
Novel Accelerator and Detector Systems
Presentation transcript:

LBNF 1 LBNF/DUNE – Construction Summary

LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now a frame contract with the French firm holding the main IP. The support structure requires many mechanical items (beams, flanges, plates, …) easely available in Europe, which can also be prefabricated. Europe with ICARUS and ATLAS has the main knowledge of LAr cryogenic technologies. Several firms available in Europe and interested. Scope ElementFunding Source Excavation of 4850L detector and utility caverns and driftsDOE Surface buildings, utility infrastructure, cavern outfittingDOE LN2 cryogenic systemsDOE Four 10kt fiducial cryostatsNon-DOE LAr cryogenic systemsNon-DOE LAr and LN2 cryogenic fluids procurementDOE and Non-DOE CD-3a Scope 2

LBNF Far Site Facilities Scope and Requirements Scope ElementFunding Source Excavation of 4850L detector and utility caverns and driftsDOE Surface buildings, utility infrastructure, cavern outfittingDOE LN2 cryogenic systemsDOE Four 10kt fiducial cryostatsNon-DOE LAr cryogenic systemsNon-DOE LAr and LN2 cryogenic fluids procurementDOE and Non-DOE CD-3a Scope 3 CERN is doing the final design of the cryostats, in contact with the LNG industrial community. We are constructing large prototypes (-> ProtoDUNEs). CERN has accepted to finance the first cryostat construction. We have the opportunity to build a consortium with several FAs for cryostat number 2. Several EU firms can be involved. There are plenty of opportunities to participate in the engineering of the cryostats, in particular for all the penetrations to the liquid. Same for the LAr cryogenics. We could effectively use the EU knowledge and market.

LBNF In practice: - We need to engineer an European in-kind for the second cryostat: - involve European firms in the various procurements - more engineering effort (distributed also outside CERN) - Prepare the installation scenario (technical teams, QA teams, ….) - All this can start with teh first cryostat - We need to engineer an European in-kind for LAR cryogenics: - involve European firms - We need to strength the CERN cryogenics group - Distribute the engineering design work also outside CERN - Work out the scenarios for installation and commissioning 4