Ajay Pappu Resource Integration Department ERCOT Generator Frequency Relay Settings Survey Dec 2013.

Slides:



Advertisements
Similar presentations
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Advertisements

Underfrequency Load Shedding Report
TECHNICAL OPERATION SUBCOMMITTEE Report to Operating Committee June 10 – June Gary S. Tarplee - Chair.
Introduction to the Feedback Loop Note: this presentation is based on the MicroSave publication: The Feedback Loop – A process for Enhancing responsiveness.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
PER
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
ERCOT Update on UFLS Annual Survey with TSP/DSP September 2014.
ERCOT Under Frequency Load Shed Testing
Resource Data Needed For Dynamic Simulations
ISSUES WITH RETROFIT REQUIREMENTS FOR HVRT 1. CURRENT SITUATION WGRs HAVE HAD A CLEAR LIMIT OF 1.1 pu SPECIFIED FOR HVRT IN THE GUIDES WGRs ARE NOW BEING.
CIP Version 5 Update OC Meeting November 7, 2013.
CLRN Evaluation Update Educational Support Systems May 28, 2009
NERC LTRA Update / CDR Capacity Counting Issues
Generator Data Submittals 5/8/ Transmission Customer Forum Bob Jones Transmission Planning Southern Company Transmission 5/8/ Transmission.
ERCOT’S COMPLIANCE ASSESSMENT and ENFORCEMENT PROGRAM March 23, 2005.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
ERCOT 2013 Winter Storm Drill (WSD) Summary Brian Barcalow Training Specialist, Sr.
1 Texas Regional Entity Report December Performance Highlights ERCOT’s Control Performance Standard (NERC CPS1) score for October – Initial.
1 GENMAP Registration Workshop Jan 14, 2010.
April 23 rd OWG UFLS Survey & Power Factor Review.
Multiple Hires UNMJobs Amanda Vesey-Askey, EEO Compliance Specialist: Office of Equal Opportunity Michael Brown, Sr. HR Consultant.
Integration Update 1 External Interfaces & Integration October 14, 2008 Brian Brandaw.
March Topics covered in this video: Documenting Supplementary Aides and Services Rollover Reminders.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
Lead from the front Texas Nodal 1 Registration Data Collection June Window May 22, 2009 Kick Off Meeting.
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
EAS Lessons Learned Summary Lessons Learned Published in June 2014.
By: Texas RE Enforcement April 25, 2013 Guidance on Requirements for PRC-005 Mitigation Plans Talk with Texas RE April 25, 2013.
COMPLIANCE UPDATE ERCOT ROS Meeting April 9, 2002.
Evidence Based Guidelines. Learning objectives Be familiar with the evidence based guidelines used in rural and remote practice Understand the use for.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Retail Market Subcommittee Visibility into OGRR219.
Nov 5, RRGRR 007 Adding Solar Registration Inputs The RDWG met on October 20, and has completed it’s review of RRGRR 007 with the revised Impact.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management May 19, 2011.
Art Deller ROS/WMS Update November 2013 RARF Data Completion Project.
Assessment Report No. 9 Workshop Mandatory Reliability Standards (MRS) Teleconference Bridge Details: (Vancouver) Toll Free.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Lead from the front Texas Nodal 1 Registration Data Update Aug 25, 2008.
NSRS Update Recent NERC Standards Activities RSC – June 2013 Presented by: Lisa Martin, NSRS Chair.
TST Session 3.1. Step 3.a. Elaborating the Survey Plan WFP Markets Learning Programme1 Trader Survey Training.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI SAM New Requirements from the SA1 Survey.
October 12, 2012 RPG Planning Guide 5.3.2(2) Developer obligation to keep RARF data updated Cathey Carter Resource Integration.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Issues with Reactive Testing and the NDCRC S. Looney QMWG, 11/5/2012.
Remedial Action Scheme Workshop RAS Workshop May 9, 2016.
ERCOT SYSTEM PLANNING Dynamic Model Data Management.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
Registration Data Collection September Window
TASOR TF Report to TAC Dec. 4, 2008.
PLWG Review 6.9 and the Interconnection process
ISSUES WITH RETROFIT REQUIREMENTS FOR HVRT
UFLS Workshop Discussion #3
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Reliability Standards Development Plan
NERC Reliability Standards Development Plan
Support Systems and Tools
NERC Reliability Standards Development Plan
Unfortunately we are currently experiencing problems with our telecommunications. We have reported this to our telecommunications provider who are looking.
> Select Major Subject or General Subject
Presentation transcript:

Ajay Pappu Resource Integration Department ERCOT Generator Frequency Relay Settings Survey Dec 2013

Survey Objective Collect under-frequency relay setting data from generators In response to FERC NOPR (NERC PRC-024-1) on Sep 19, 2013, over-frequency relay settings were also requested Analyze the relay settings and recommend over-frequency requirements

Survey questions I s your generator able to meet the requirement established in Operating Guide Section for under-frequency settings ? What are the over-frequency settings for this generator? If settings are correct in the RARF state so, if different, please enter settings and update the RARF. Is your Generator able to meet the over-frequency settings defined in the NERC PRC-024-1?

Preliminary Survey Results* Number of Units Meets LFRT (%)* Meets HFRT (%)* Meets LFRT&HFRT (%)* Unit Type Conventional Non Conventional Total562 *Subject to change based on further enquiries with Resource Entities