Welcome!. OVERVIEW Limited access reconstruction/relocation of US 31 from US 30 to US 20. The project area includes the communities of LaPaz and Lakeville,

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
CR 46A Realignment (Section 5)
Titusville to Edgewater Bike Loop PD&E Study
WELCOME! October 28, 2013 ODOT District 1 & District 2.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
Santa Maria River Bridges Widening. Project Location.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
Atlanta Public Schools Budget Commission Meeting Charles A. Burbridge, Chief Financial Officer February 25, 2014.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
Albemarle RPO Project Update North Carolina Department of Transportation May 2011.
U.S. 33 Northern Connector Alternative
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
STH 29 and CTH O Construction Project Manager: Richard Simon Project Leader: Dave Julson.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
The Roads Ahead Leroy D. Alloway, Director Community Development.
Current Construction Projects Major Projects Pinellas County.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
Offsite Detour analysis. Calculation of detour length Distance along SR = Distance along SR
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Parks and Recreation Division December 15, 2009 PARK LAND ACQUISITION.
KAPA FALL FORUM T-WORKS Progress 7,714 miles improved $63 million modal projects complete 559 bridges repaired/replaced $2.3 billion let.
FY Budget Worksession Parks & Recreation Division July 13, 2015.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
City of Murrieta Capital Improvement Projects for FY I-15/California Oaks Interchange I-15 Overcrossing at Los Alamos Road* Jackson Avenue/Warm.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
Transportation Projects City Council Workshop May 14, 2013.
Waupaca County Highway 5 Year Plan We build and maintain a quality transportation system for the safety and prosperity of current and future.
TYPE OF WORK FY 2015 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH K -- Rural Road.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
New Jersey Turnpike Authority November 19, 2009 New Jersey Turnpike Interchange 6 to 9 Widening Program Presented by Lisa M. Kenney, P.E. 1.
Program Manager Administrator
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH II -- Winnebago.
March 21, BUDGET PRESENTATION- ROADS CAPITAL PROJECTS WATER WASTEWATER.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Southwest Parkway and Chisholm Trail Briefings
Regional Roads Committee
2017 TYPE OF WORK FY 2017 SUMMARY MILEAGE LONG TERM FINANCING
DICKINSON AVENUE RECONSTRUCTION
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Highway 14 – Owatonna to Dodge Center District 6 Update
SR 25 – Hoosier Heartland Highway Lafayette to Logansport
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Draft 2018 Project Priorities
Woodinville-Duvall Road Widening Project Update
SE 12th Street Roadway Improvements February 8, 2005.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-295/Malcolm X Avenue Interchange Improvement Project
Construction Management & Engineering
Crossing Lake Washington
Heart of Florida Loop East Section
Stockton City Council December 6, 2007 Land Use Diagram Changes
Metropolitan District | mndot.gov
Presentation transcript:

Welcome!

OVERVIEW Limited access reconstruction/relocation of US 31 from US 30 to US 20. The project area includes the communities of LaPaz and Lakeville, with interchanges at SR 4, US 6, Kern Road and 7th Road. Total project length is 20.4 miles 20 contracts Open to traffic December 2014

UPDATE 9 contracts complete or under construction totaling $74 million. $236 million total contract cost. Plymouth-Goshen Trail, 6 th Road, Tyler-Lilac Road, Lake Trail and Kenilworth Road contracts are open to traffic New Road and Miller Road contracts are closed to traffic 10.1 miles of the 20.4 total miles are under construction Right of way acquisition is 50% complete: –Total of 410 parcels required for complete build out. –80 relocations completed, 75 relocations remain

US 30 to north of Tyler Road

Lake Trail to US 20

Contracts under Construction Grading Contract (Pierce Road to Roosevelt Road) – 2011 Bridges over Heston Ditch & East 1 st Rd., and Laketrail over US31 Bridges over Mangun, Shively, & Shidler Hoffman Ditches

Contracts Open to Traffic Grading & Paving Contract (1 st Road to Pierce Road) Kenilworth Road Lake Trail – 2010 Tyler Road – 2009 Plymouth-Goshen Trail – th Road

Kenilworth Road

Peat Bridges

US 31 north

US 31 South

Upcoming Contracts 2011 Letting SR 4 & Paving – IR –March 2011 LaPorte Wetland Mitigation –Februrary 2011 Roosevelt Rd. to South of Kern Rd. – IR –April 2011 Elkhart Wetland Mitigation –April 2011

Upcoming Contracts 2012/2013 Letting Johnson Street – Spring 2012 Jackson/Fellows – Spring 2012 US6 & Connector – Spring 2012 Kern Road Interchange – Spring 2012 Kern Road to US 20 – Spring th Road Interchange – Spring 2013

Remaining Contract Estimates FY $33 million FY $86 million FY $30 million

QUESTIONS