Makara, Aug. 17, 20071 Cryo Dept. Shutdown Status.

Slides:



Advertisements
Similar presentations
Russ Rucinski, PPD/MD/DZero Ops DZero Solenoid status November 29, 2004.
Advertisements

1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
ZONE 18 CRYOGENICS M. Sanmarti On behalf of AT-ACR-OP section.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
ESS Cryogenic System Design
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1 Technical Arguments in Favor of using the Cryomech PT-415 Cooler for Cooling the LH 2 Experiment Michael A. Green Lawrence Berkeley Laboratory Berkeley.
ITER Cryoplant System Status
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
Cryogenics Science Center/KEK (Nobuhiro KIMURA –20/April./2010 at ATF2 meeting ) 1 Resent Progress at KEK N. KIMURA, T. TOMARU, Y. AJIMA, T. KUME, A. YAMAMOTO,
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
G-2 Cryogenic System. Maintenance Items Readily defendable Refurbish expansion engine Cost basis – previous expansion engine refurbishment Spare parts.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
October, 2009 Cryogenics System Roberto Than October, 2009 Internal Review.
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
To TT10 Nitrogen or helium gas LN2 Storage vessel buffer storage vessel G1G2 Magnet cryostat VALVE BOX Schematic diagram of the cryogenic system.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
What is a Cryocar? It is a liquid nitrogen powered vehicle. Propulsion systems are cryogenic heat engines in which a cryogenic substance is used as a.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Central He distribution service upgrade status and dedicated He distribution for AD K. Barth on behalf of TE/CRG ADUC and ELENA Meeting Wednesday, September.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
TE-CRG Activities D. Delikaris, TE-CRG.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Makara/Geynisman, Aug. 31, Cryo Dept. Shutdown Status.
Energy efficiency considerations in cryogenics Philipp Arnold Section Leader Cryogenics Proton Driver Efficiency Workshop.
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
2K Cold Box FDR Introduction
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Process Simulation for the LCLS-II Cryogenic Systems
FRIB Cryogenic Support
Proximity Cryogenics P&IDs meeting
Online Helium Inventory Monitoring of JLab Cryogenic Systems
Cryoplant Installation Scope
N. Hasan1, P. Knudsen2 and V. Ganni2
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Status of the cryogenic system for B180
Mathew C. Wright October 2016
The Fermi National Accelerator Laboratory is a U. S
Mathew C. Wright January 26, 2009
Overarching Commissioning Plan
A Complete System for Operation of a Superconducting Magnet*
SNS Cryoplant Commissioning Past Experiences
Schematic diagram of the cryogenic system
CryoPlant Commissioning
ESR2 Process Cycle Design
ESR2 Process Cycle Design
Presentation transcript:

Makara, Aug. 17, Cryo Dept. Shutdown Status

Makara, Aug. 17, Tevatron at LN2 temperature except C4 and D1 at room temperature. –E1 warmup to room temperature started. –Tunnel magnet cryostat vacuums at A25 and D35-36 regions are of concern. –Pbar Cryogenic Transfer Line AP30-AP10/60 vacuum leak checked fine. –CDF back on their BA-1 Mycom compr (failed unit was replaced) and thus isolated from Tevatron Cryogenic System.

Makara, Aug. 17, Current Operations 3 FRIG Mycom comprs (plus DZero & CDF Cryo) running with helium precooled to LN2 temperature flowing through magnet strings. CHL helium inventory management system operating (Tank Farm, Helium Purifier, A0 GHe Recovery) and Tank Farm has been purified; helium losses normal. CHL Nitrogen Reliquefier plant off and LN2 supply dependent on vendor deliveries to CHL LN2 dewar tanks; deliveries are fine.

Makara, Aug. 17, FRIG Maintenance in progress –9 of 13 wet expander flywheels have been replaced –7 of 26 wet/dry expander overhauls of cold ends are completed –Tevatron Cryogenic Transfer Line F2-F3 vacuum being leak checked. –Various vacuum, instrumentation, and controls problems being worked on. CHL Maintenance in progress –Coldbox-1: Oil coolers have been replaced Charcoal Adsorber east unit is in high temperature regeneration –Nitrogen Reliquefier plant maintenance in progress: Marley Cooling Tower cleanup/overhaul, Rotoflow compr aftercooler heat exchanger tube bundle being replaced –Various facility maintenance in progress