SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Providing Quality Water & Wastewater Services To the Coastal Communities.

Slides:



Advertisements
Similar presentations
1 Beachcomber Bay Sewer Lift Station Homeowners believe a better solution is available for both the City and the Homeowners.
Advertisements

Wastewater Collection & Maintenance Division From left to right, Don Patton, Scott Stemen, Matt Agner, Dave Shrider, Gary Carter, Richard Beasley, John.
Item 5.h - Authorization to Advertise the Repairs to the Glorietta Bay Pump Station Project for Bid.
Ross By-Pass Tunnel Cleanup Pre-Bid Project Overview May 2014
Presented by Lynley Doyen, Water Program Liaison Field Operations Support Division Water Quality Advisory Work Group January 25, 2011 Austin, Texas.
Presented by NEORSD Richard J. Switalski, P.E. Presented by NEORSD Richard J. Switalski, P.E.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
City of Los Angeles Venice Dual Force Main Project
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
Gregory Wilson, CFM Adrienne Sheldon, PE, CFM Amit Mahadevia FEMA 259 Update Engineering Principles and Practices for Retrofitting Flood-Prone Residential.
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
Regulatory / WDR Update What’s Going On?. Waste Discharge Requirements Adapted by the State Water Resources Control Board on May 2, 2006 Adapted by the.
Presentation to Maxwell Place Homeowners Association 1.
The State Water Project, Unauthorized Encroachments and the California Water Code State of California Department of Water Resources Division of Operation.
16 Flat ledges on the open truss ceiling are sites where dust and dead insects can collect and fall onto exposed product. Solution: Clean these areas on.
The City of North Bend Sanitary Sewer System
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
Gwinnett County’s Post Development Stormwater Management Program
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Tymber Skan BCC Update Orange County Government January 27, 2015.
November 16, 2007 APPLEVIEW PROPOSAL Why It’s Not For Our Community 140 Units, 9 Story Condo 140 Units, 9 Story Condo, North Bergen.
LLANO COUNTY MUD #1 ROAD PROJECT REVIEW PURPOSE DISCUSS POSSIBILITY OF COMPLETING REMAINING ROAD UPGRADE PROVIDE FACTS TO INFORM COMMUNITY TO MAKE DECISION.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Other Construction Projects
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
1 Northern Pipelining & Practical Experience Presentation to:APEGGA April 21, 2005 Calgary.
Water & Waste Disposal Loans and Grants The funding purpose is to construct, enlarge, extend or improve water, wastewater and solid waste systems in rural.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Operations & Maintenance Considerations Dave Lawson Electrical Maintenance and Operations Supervisor.
Pipeline Safety Trust Fort Worth Natural Gas Production Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
FEMA Programs I Session Name: FEMA Programs I Coastal Hazards Management Course Slide 31.1.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
Paper # LOS ANGELES COUNTY PRIORITIZATION OF SEWER REHABILITATION PROJECTS Fernando Villaluna, P.E. 1.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
WVSD SANITARY SEWER REHABILITATION PROGRAM 2006 Sewer Smart Summit Presented by Peter V. Sevcik, P.E. West Valley Sanitation District Campbell, California.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
The Natural Pool To advance to the next slide, click your mouse button. To end the show, close the window.
WRAC Acme Basin B Discharge Project February 2, 2006.
CCC Hearing February 13, 2015 Item F12b Application
Sierra Water Work Group Summit June Tuolumne Stanislaus Region.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Solving Significant Surge and Water Hammer in a Large Wastewater Lift Station at Fort Bragg, North Carolina November 16, 2015 Randall L. Foulke, PE, BCEE,
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
Maintenance of Structures Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works- Community Roads of the Productive.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
1 MEEHAN RESIDENCE City of Laguna Beach Appeal # A-5-LGB March 12, 2015 CCC Hearing Item Th12A.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
City of McCall Sanitary Sewer I&I Study Community Stewardship for Economic Benefits Nathan Stewart, PE, City Engineer Matt Neukom, PE, Project Manager.
City of Joliet 2016 Proposed Budget November 30, 2015.
All About Workplace Electrical Safety
Nick Fish, Commissioner | Michael Stuhr, P.E., Director Portland Water Bureau May 3, 2016 Briefing for the Portland Utility Board Asset Management at the.
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
SEA WALL Description Concrete or rock barrier built at the foot of cliffs or at the top of a beach. Has a curved face to reflect the waves back into the.
CDP (Foxdale) Thursday, April 14, 2016 Item 12b Presentation in support of Applicant’s request to modify Special Condition No. 1.
1 Department of Public Works 08/09 Capital Improvement Program City of Newport Beach.
1. 1. What is a low pressure sewer system? These Systems convey wastewater from your home or business to the regional wastewater treatment facility. Unlike.
FY 2017/18 General Budget Workshop
Rehabilitation Program impact on Sewer Management
Water Department has Six Divisions
Town of Dunn Sanitary District No. 3
Parkland/Brookdale Interceptor Replacement
Public Hearing Sanitary Sewer Fees
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
Larimer County: engineering
Presentation transcript:

SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Providing Quality Water & Wastewater Services To the Coastal Communities

South Coast Water District Laguna Lido Board of Directors Presentation June 8, 2010

South Coast Water District South Laguna Tunnel Stabilization & Sewer Pipeline Project Aliso Beach Camel Point Laguna Royale Table Rock Circle Drive Laguna Lido 1000 Steps Beach Three Arch Bay Point Place

South Coast Water District Tunnel History Built in 1954 Pipeline replaced in 1974 Tunnel runs from Three Arch Bay to Aliso Beach Approximately 2 miles in length Tunnel dimensions generally 6 ft. high x 6 ft. wide Only sewer collection system in SoCal that has sewer line inside of a tunnel within & below bluff Unique benefit of having a “Gravity Sewer Line”  Eliminates need for 6-8 lift stations & individual sump pumps

South Coast Water District Tunnel History 1954 to present – Tunnel repairs as needed 1997 – Comprehensive Tunnel assessment to identify needs and repairs 2005 to 2006 – Comprehensive study of Tunnel conditions to develop basis of design for Stabilization & Pipeline Project 2007 – Emergency Tunnel Stabilization & Pipeline Protection Project at Thousand Steps Beach 2008 – Begin the study/inquiry of long-term project to stabilize entire tunnel & replace aging pipeline Summer 2010 – DEIR Recirculation Distribution & 45 day public review commences

South Coast Water District Reasons for Tunnel Stabilization & Pipeline Replacement Primary goals: Worker Safety and Continued Zero Sewer Spills 56 year Tunnel deterioration; falling rock & decaying wooden support beams & posts Ongoing inspection, maintenance and repair of tunnel & pipeline to maintain Zero Workers Injured and Zero Sewer Spills onto beaches

South Coast Water District 1000 Steps Beach Emergency Repair January – August 2007 Emergency Tunnel Stabilization and Pipeline Protection Project 400 ft. of tunnel was excavated, enlarged & structurally fortified 750 ft. of pipeline was encased in protective concrete for uniformity 48 work boats delivered supplies, equipment; hauled away 1300 tons loose rock & 77 pallets of decaying wooden support beams & posts Maintained Zero workers injury & Zero sewer spills

South Coast Water District 1000 Steps Beach Emergency Repair

South Coast Water District Laguna Lido

South Coast Water District Laguna Lido

South Coast Water District

South Coast Water District Request to Laguna Lido Conduct Engineering Surveys to: –Accurately locate N & W exterior & interior walls of Building A –Accurately locate Tunnel under Lido Property This survey work will verify the potential need to relocate a portion of Tunnel away from Laguna Lido Building

South Coast Water District

South Coast Water District

South Coast Water District Laguna Lido

South Coast Water District Tunnel “Cross Section” Enlarged Tunnel Existing Tunnel New Pipe Existing Pipe 9’ - 4” 9’ - 0” 6’ Approx.

South Coast Water District Laguna Lido Potential Tunnel Realignment Building B

South Coast Water District Easement Request South Coast Water District requires an additional 5 foot easement for Tunnel Enlargement

South Coast Water District Conclusion Conduct Engineering Surveys to: –Accurately locate N & W exterior & interior walls of Building A –Accurately locate Tunnel under Lido Property

SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Providing Quality Water & Wastewater Services To the Coastal Communities