H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests

Slides:



Advertisements
Similar presentations
Laser Speckle Extensometer ME 53
Advertisements

Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
A Laser Based Alignment System for the CLIC project
CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| | INDICO | page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.
JINR: J. Budagov, V. Glagolev, M. Lyablin, G. Shirkov CERN: H. Mainaud Durand, G. Stern A laser based fiducial line for high precision multipoint alignment.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
Enhancement of Single Stretched Wire Measurements of LHC Short Straight Sections Guy Deferne, Nikolay Smirnov, CERN Joe DiMarco, FNAL 14th International.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
ALIGNMENT OF Q2 LOW BETA QUADRUPOLES D. Missiaen, On behalf of the EN-MEF-SU/MTI team 1.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
H. SCHMICKLER Alignment challenges for a future linear collider.
D EDICATED S PECTROPHOTOMETER F OR L OCALIZED T RANSMITTANCE A ND R EFLECTANCE M EASUREMENTS Laetitia ABEL-TIBERINI, Frédéric LEMARQUIS, Michel LEQUIME.
H. MAINAUD DURAND, BE-ABP/SU, 23/04/2010 STATUS OF THE CLIC PRE-ALIGNMENT STUDIES.
Precision Dispensing Purdue takes advantage of the gantry’s precision by fixing a 150 micron inner diameter dispensing tip to an EFD dispensing pressure.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
D. Missiaen Summaries of the discussion. 2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Observation of Pore Scale Liquid Behavior with NIR-Microscopy and Advanced Laser Techniques Markus Tuller and Dani Or Dept. of Plants, Soils and Biometeorology,
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
1 Magnetic measurements of the Super-FRS magnets 1 Overview: - Measurement systems for dipoles - requirements - Measurement systems review - Open points.
PACMAN : technical objectives Hélène Mainaud Durand.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
Performance of the Iris diaphragm laser alignment system of the SPring-8 C. Zhang JASRI / SPring-8 IWAA2014, October 13-17, 2014, IHEP, Beijing.
Digital Light Sources First introduced in 2001.
ALIGNMENT OF THE NEW TRIPLETS
Last results from tests
Alignment systems in ATLAS: Monitoring of the bedplates
on behalf of the CLIC active pre-alignment team
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Recent developments on micro-triangulation
Stages for the SSW translation system for PACMAN
TZ32 tunnel H. MAINAUD DURAND, BE-ABP/SU CTC 07/07/2009.
Need for Alignment Position of off-momentum proton w.r.t. beam
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Towards a common mechanical interface
Alignment challenges for a future linear collider
Presentation transcript:

H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests SLAC o On a CLIC test setup Summary and next steps

2 Problem and solution proposed Solution proposed for CLIC CDR (from previous presentation) Sensors & actuators are associated to each support / articulation point of girder: As a summary: For CDR:- straight reference = stretched wires - sensors = Wire Positioning Sensors (WPS) More than WPS needed!

3 Problem and solution proposed More than WPS needed! Requirements Precision< 2 μm Accuracy< 5 μm Range10 mm x 10 mm Radiation hard Installed in the LHC for the monitoring of the low beta triplets (relative measurements) Expensive but radiation hard Needed to be upgraded to fulfill the requirements cWPS New development especially to fulfill the CLIC demands oWPS

OUTLINE Introduction: CLIC project & active pre-alignment Presentation of oWPS Presentation of cWPS Intercomparison tests SLAC o On the CLIC test setup Conclusion

5 oWPS (1) Developed and manufactured by Open Source Instruments Inc. under GNU General Public License : Design proposed in 2006 Version 1 in 2009 : oWPS1 Version 2 in 2011: oWPS2 Larger aperture Smaller exposure time PT1000 added Kinematic mounting surfaces (cone, conical chamfer and plane).

6 oWPS (2) Principle Two CCD cameras mounted rigidly on a support with a kinematic mount CCD cameras take pictures of the wire from two different angles, under red light As the position and orientation of each camera has been determined previously in a calibration process, the position of the stretched wire is deduced in the same coordinate system Version 2 consists of: TC255 image sensors from Texas Instruments, 336x243 pixels, with 10 μm square pixels An array of 9 LEDs (each LED emitting 20 mW of 620 nm red light) A PT1000 glued on the sensor side A A3022 WPS head developed by OSI Inc.

7 oWPS (3): stretched wires Carbon fiber wrapped by two thin plastic threads in PEEK Image of the wire Picture of the wire (-) Not antistatic (-) Transparent to infra-red (+) Smaller lineic mass, higher tensile strength (-) Non uniform longitudinally (-) Appearance of bright spots on images (+) Antistatic Multifilament yarn spun from liquid crystal polymer Metallization of Vectran wire by silver plasma coating

8 oWPS (4) Validation tests Linearity tests Interchangeability tests Between 5 sensors: σ = ± 1.8 μm in radial σ = ± 5.8 μm in vertical Two high precision linear stages mounted at 90°, with a bidirectional repeatability of ± 0.2 μm Offsets between 2 calibrations of the same sensor

OUTLINE Introduction: CLIC project & active pre-alignment Presentation of oWPS Presentation of cWPS Intercomparison tests SLAC o On the CLIC test setup Conclusion

10 cWPS (1) Manufactured by Fogale Nanotech Prototype (1990)Version 1 in 1994Version 2 in 2000 Version 2 CERN New ways of fastening «gate» fastening solution tested on 17 sensors and 36 centering per sensors: -Radial repeatability ranging from 0.6 μm to 1.8 μm -Vertical repeatability ranging from 0.5 μm to 1.0 μm.

11 cWPS (2) New calibration bench designed a a b c d a = reference sensors b = 2 displacement tables (resolution of displacement of 10 nm over 75 mm of stroke). c = Pelletier probe d = sensor to be calibrated Offsets between two calibrations of the same sensor Two high precision linear stages mounted at 90°, with a resolution of displacement of 10 nm

12 cWPS (2) Associated stretched wire Each cWPS must be calibrated w.r.t. the type of wire:  There is a scale factor between carbon PEEK and carbon Kevlar wires: 50 μm per millimeter of range  There is a scale factor between carbon PEEK and carbon PES wires: 10 μm per millimeter of range  No scale factor between wires coming from the same manufacturing lot  Scale factor between same type of wire from different lots Carbon Kevlar Carbon PEEK/PES

OUTLINE Introduction: CLIC project & active pre-alignment Presentation of oWPS Presentation of cWPS Intercomparison tests SLAC o On the CLIC test setup Conclusion

Inter-comparison at SLAC (From G. Gassner) Residuals < 1 μm Scale factor of 2% Residuals ~ 3 μm

15 Description of module test setup at CERN Configuration:

Some first results… Noise Noise peak to peak < 2 μm Noise peak to peak ~ 6 μm

Some first results… Repeatability, Reproducibility, interchangeability Repeatability: Reproductibility: < 3 μm Interchangeability: cWPS: maximum offset of 10 μm, mean value ~3-4 μm oWPS: maximum offset of 14 μm, mean value ~6-8 μm

Some first results… Test of displacement of the wire cWPSoWPS Each wire is displaced, and the sensors should see displacements that are proportional to their longitudinal position along the wire  the offset between theoretical displacements and achieved displacements must be as small as possible.

Some first results… Short term stability measurements Zoom over 2 days of measurements (one value / minute, each value is the average of 40 readings) cWPS & oWPS see the same displacement of support, due to temperature variations Readings can not be compared: there is an effect of temperature variations to the oWPS itself  Compensation needed.

20 Summary Performances of oWPS comparable to upgraded version of cWPS The Silver Vectran wire associated with oWPS is promising too, with a smaller linear mass and a stronger breaking tension. A conductive version is under development which could be associated to cWPS Next steps: perform tests concerning absolute measurements of oWPS and cWPS (latest results shown in previous presentation confirm that these measurements are within a few microns Develop a more compact version of oWPS, and a radiation hard version. oWPS (μm)cWPS (μm) Noise28 Repeatability< 1.5< 2 Reproducibility< 2< 3 Interchangeability Resolution< 0.5