Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, 2008 -- A brief review of pion capture scheme in NuFact,

Slides:



Advertisements
Similar presentations
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Advertisements

Harold G. Kirk Brookhaven National Laboratory Solenoid Focus of Pions for Superbeams NUFACT06 Irvine, Ca. August 28, 2006.
K. McDonald LEMC Workshop 22 Apr 2008 From MERIT to a Muon Collider (Front End) K.T. McDonald Princeton U. Low Emittance Muon Collider Workshop Fermilab,
K.T. McDonald March 18, 2010 LArTPC BNL 1 Magnetizing a Large Liquid Argon Detector Kirk T. McDonald Princeton University (March 18, 2010)
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
K. McDonald 2 nd Oxford-Princeton Targetry Workshop 6 Nov 2008 High-Power Targets for Superbeams and Neutrino Factories (and Muon Colliders) K.T. McDonald.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
K.T. McDonald June 18, 2009 DUSEL FNAL 1 Strategies for Liquid Argon Detectors at DUSEL Kirk T. McDonald Princeton University (June 18, 2009)
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
30 June 2008M. Dracos, NuFact081 Challenges and Progress on the SuperBeam Horn Design Marcos DRACOS IN2P3/CNRS Strasbourg NuFact 08 Valencia-Spain, June.
17 Dec. 2008M. Dracos, EUROnu-WP21 Collector and the SPL Super-Beam Project Marcos Dracos IPHC-IN2P3/CNRS Strasbourg.
Superconducting Solenoids for COMET KEK Cryogenics Center, Osaka Univ. Kuno-san’s Team, J-PARC MLF Muon Group.
The JPARC Neutrino Target
Above: On-axis field profiles of resistive, superconducting and all magnets, and bore-tube radius r = 7.5 (B/20T) −½ cm. Above: Hoop strain ε θ in resistive.
Twin Solenoid Twin Solenoid - conceptual design for FCC-hh detector magnet - Matthias GT Mentink Alexey Dudarev Helder Pais Da Silva Leonardo Erik Gerritse.
Neutrino Study Group Dec 21, 2001 Brookhaven Neutrino Super-BeamStephen Kahn Page 1 Horn and Solenoid Capture Systems for a BNL Neutrino Superbeam Steve.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
Superconducting Magnet R&D for COMET Makoto Yoshida (KEK) NuFact Aug, 2011.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory EMCOG Meeting CERN November 18, 2003.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
RAL/BENE meeting, April Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg.
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
Opportunities for Experiments Based on Stored Muon Beams at Fermilab Milorad Popovic Jean-Francois Ostiguy Fermilab August, 2014.
MOMENT Synergies with Other Projects Jingyu Tang Institute of High Energy Physics, CAS NuFact2015, Rio de Janeiro, Brazil, Aug , 2015.
LAGUNA/LBNO WP4: secondary beam line status report M. Calviani, P. Velten, A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN) + M. Zito, V. Galymov (CEA),
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
Thermomechanical characterization of candidate materials for solid high power targets Goran Skoro, R. Bennett, R. Edgecock 6 November 2012 UKNF Target.
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
KT McDonald MAP Winter Meeting (SLAC) December 5, Solid Target Options for an Intense Muon Source K. McDonald Princeton U. (December 5, 2014) MAP.
Study of Pion Capture Solenoids for PRISM H.Ohnishi AB M. Aoki C, Y. Ajima A, N. Fukasawa AD, K. Ishibashi B, Y. Kuno C, T. Miura A, K. Nakahara C, T.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory Muon Meeting BNL January 26, 2004.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
Status of the FAIR pbar Source K. Knie May 3, 2011.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
Road Map of Future Neutrino Physics A personal view Ken Peach Round Table discussion at the 6 th NuFACT Workshop Osaka, Japan 26 th July – 1 st August.
1 Energy Deposition of 4MW Beam Power in a Mercury Jet Target X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL The International Design Study for the.
February 13, 2012 Mu2e Production Solenoid Design V.V. Kashikhin Workshop on Radiation Effects in Superconducting Magnet Materials (RESMM'12)
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
CERN/BENE meeting, July Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg Who.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Conceptual Design of COMET and Radiation Hardness Makoto YOSHIDA (KEK) RESMM12 FNAL Feb. 13th, 2012.
Beam line Experiment area SC magnet Pion production target
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
COMET and DeeMe. Mu-e conversion search at J-PARC COMET Target sensitivity 10 C.L. using aluminum target – SINDRUM II 7x – MEG 2.4x
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
J-PARC neutrino experiment Target Specification Graphite or Carbon-Carbon composite cylindrical bar : length 900mm, diameter 25~30mm The bar may be divided.
Reducing the Iron in the Endcap Yoke of CLIC_SiD Benoit Curé, Konrad Elsener, Hubert Gerwig, CERN CERN, June 2014 Linear Collider Detector Magnet Meeting.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
Horns, Hadron production etc. (from hadron production to neutrino beam) A.K.Ichikawa KEK 200/9/26 Study on horns Changing -beam energy Hadron.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Ids120h_side. ids120h_top ids120h_iso ids120h_end.
BNL solenoid capture workshop: magnet challenges are not trivial Summarized by Tengming Shen
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Challenges and Progress on the SB Horn Design
Horn and Solenoid Options in Neutrino Factory
Target and Horn status report
Radiation Damage to Mu2e Apparatus
A medium baseline superbeam facility in China
Superconducting Magnet Development for me Conversion Experiments
Collector and the SPL Super-Beam Project
Neutrino beams in China
EUROnu Beam Window Studies Stress and Cooling Analysis
Beam dump for J-Parc neutrino facility
What is μ-e Conversion ? μ μ-+(A,Z)→e-+(A,Z) muon decay in orbit
Presentation transcript:

Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact, SuperBeam and mu-e conversion

Mission of pion capture system In neutrino factory  use accelerated muons  need muons in small radius and small divergence for accelerating  utilize pions less than 1GeV muons around 0.2 GeV/c for cooling In SuperBeam  use forward-focused pions point to parallel  need pions with small divergence to achieve neutrinos at long distance  utilize higher energy pions Off-axis configuration provides narrow band neutrino beam In mu-e conversion experiment  use stopped muons with negative charge  need muons less than 0.1 GeV/c  utilize negative pions around 0.1 GeV/c prefer to avoid high energy pions for less background

Horn in K2K 250 kA in 2.5 msec, 2.2 sec cycle Aluminum alloy conductor   30mm Al target embedded Thermal load  14.4 kJ/pulse (Joule heat 12 kJ/pulse) on 1st horn Successful operation over 1 year (>10 7 pulses)

Solenoid in mu-e conversion exp. collect backward soft pions 5T at solid target Proton beam dump located forward Solenoid for NF could be used with low energy proton beam COMET MECO/mu2e

Tracks in Solenoid Backward pions collected 6T  1T in 2.5m 50 % of pions decay at 5 meter

Solenoid in Neutrino Factory 20T at target, bore = 15 cm P t max =0.3BR/2 matching to decay solenoid with 1.75T, bore = 60 cm tapered in 6 meter

Horn in Neutrino Factory 50 Hz pulsed current of 300kA (internal horn), 600kA (external horn) inner bore = 8 cm

Yield estimate 300kA Horn (?) 400kA Horn (?) Solenoid (?) ISS report CERN NF note 42 Thinner conductor is better  strength?

Proton beam dump No way to extract protons off solenoid All the beam energy should be dumped in Solenoid Circulated mercury pool, provided from jet target Radiation in solenoid should be an issue US Study-II z=4m

Radiation dose 70% of beam power is deposited in target cell 40kW in Coaxial shield around target  peak ~ 10 W/g  Gy/yr 589kW in Surrounding Shield US Study-II

Life time solenoid  DC operation  Radiation dose on superconducting coil should be < 100MGy insert heavy material shield into solenoid bore Horn  vibration by pulsed current 10 9 pulses/yr at 50 Hz MiniBOONE horn: 170 kA, 5 Hz for 8 GeV T2K horn: 320 kA, <0.6Hz, for 30-50GeV  Radiation No shield around target US study-II

Possible staged approach Upgrade scenario from Super Beam to Neutrino Factory  Horn + DecayVolume low freqency off axis  Horn + DecaySolenoid Low frequency  Solenoid + DecayVolume High frequency on axis  Solenoid + DecaySolenoid High frequency Upgrade scenario from muon exp. to Neutrino Factory  Solenoid + DecaySolenoid (+bent solenoid) backward capture momentum selection Low energy + SolidTarget  Solenoid + DecaySolenoid forward High energy + MercuryJet    

Superconducting Coil COMET case  5T  1m bore  10W (peak: 0.02W/kg)  0.4 MGy/yr for 0.1MW beam  Detector thin solenoid technique  Indirect cooling  Al-stabilized cable (NbTi)  Well-established technology ATLAS, BESS, CMS, …  6cm thick  80A/mm2 (566A/mm2 in NbTi)  1ton coil mass  12MJ 0.02W/kg 2kW 10W 7kW

Superconducting Coil US Study-II case  14T  1.3 m bore  ~0.3W/kg  3MGy/10 7 s for 1MW beam  Fusion reactor technique  Direct cooling  Cable in Conduit  64cm thick  20A/mm2 (234A/mm2) R&D  Radiation insulation with organic material up to 10 MGy change Jc, resistivity

Summary Solenoid option is straightforward to collect soft pions and then obtain muons in decay solenoid  R&D on radiation damage of insulator up to 10 MGy Horn can capture, focus pions to parallel  Need to match to decay solenoid in Neutrino Factory scheme to obtain muons  Need to overcome ~10 9 pulses/yr at 50 Hz Beam dump and radiation dose in target station is an issue  Maintenance scenario