ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.

Slides:



Advertisements
Similar presentations
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Oversight Committee Meeting.
Advertisements

LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Councillor Egli Ward 9 Knoxdale- Merivale June 5, 2014.
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
ALICE Trigger System Features Overall layout Central Trigger Processor Local Trigger Unit Software Current status On behalf of ALICE collaboration:D. Evans,
1 Overview of DAQ system DAQ PC LDA ODR Detector Unit DIF CCC Detector Unit DIF Detector Unit DIF Detector Unit DIF Storage Control PC (DOOCS) DAQ PC ODR.
Bill White Laser Installation and April 20, Laser Installation and Commissioning April 20, 2006 Procedures.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
AGATA Pre-processing team report AGATA Week, July 2008.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 1 Calorimeter Trigger Schedule M. Bachtis, A. Belknap, M. Cepeda, S. Dasu, E.
CCM Resources 1. Project Cost Overview (1) Boards 1&5 (spares) [completed/to be done] – Eng. time to recover layout files. – Designer time for minor layout.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Section Events IES Annual Planning/Reporting District Events July New Officers and Board of Managers Aug President to Schedule Section BOM Yearly Meeting.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
The SaTH Foundation Trust Programme Deborah Shaw March 29th 2007.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
M. TYNDEL 1 LHCC Interactions May 2003 ATLAS SCT SCT Production Status ‘Snap-shot’ of the status of the SCT production (May 2003) 1. Barrel Modules 2.
PACMAN : technical objectives Hélène Mainaud Durand.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
Overview B A B AR L1 DCT Upgrade FDR Masahiro Morii Harvard University Scope of the Project Current Status Schedule  Commissioning.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
ELENA installation progress F. Butin / ELENA collaboration.
Chris Booth Sheffield 29th March 2006
N_TOF CERN Enrico Chiaveri Spokesperson of n_TOF Collaboration
Status and Performance of the ALICE Trigger Electronics
ALICE Muon Tracking Upgrade
TDAQ Phase-II kick-off CERN background information
WP8 – Improvement and equipment of irradiation beam lines
T1 Electronic status Conclusions Electronics Cards:
LHCb electronics, 12th June 2014
ALICE Trigger Upgrade CTP and LTU PRR
XFEL Clock and control system in-kind proposal
Current Status Future Progress Monitoring
10/month is the present production rate 2 FTE + sporadic contributions

Status of CO2 Cooling tests at CERN for Pixel phase 1
M. Krivda for the ALICE trigger project, University of Birmingham, UK
CMX scope and functionalities
PBIS Update December 2005.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
TSF Upgrade Project Overview Resources Plans and Timetable
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)

Agricultural Marketing
Imaging & Engineering STAP Meeting 12th-13th of April 2018
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.

2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
PBIS Update January 2006.
XRN 4927 – MiR Drop 4 - Status Update
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David Evans

Budget UK research Council (STFC) awarded about £1.3 million over 5 years (January 2015 to December 2019) for trigger upgrade. Most of this is for manpower of course. Plus travel to keep Marian Krivda at CERN and allow the rest of us regular trips to CERN The £1.3 million includes £223,400 for hardware (capital) i.e. for CTP and LTU A sizable fraction of this will be spent of technical effort from RAL for Board Layout.

UK Manpower UK manpower (1/1/15 to 31/12/19) Marian Krivda (electronics 50% = 2.5 FTE Anton Jusko (software 20% = 1 FTE Roman Lietava (physicist – trigger upgrade coordination and 100% = 5 FTE David Evans (Group Leader and Project Leader) Plus students

Other Manpower Other manpower Jozef Spalek (Kosice) -> CTP octopus cable + debugging of LM0 board + design proposal for Fan-out board Jan Pospisil (Prague) -> design of Low Latency Interface (2015) Luis Alberto Perez Moreno (Autonomous University of Puebla -> implementation of GBT firmware + CTP emulator (work ongoing) ( )

2016 Milestones DateLTU MilestoneCTP MilestoneComments Sept 2015LTU pre-prototype delivered CTP prototype delivered Delivered end of March 2015 Dec 2015LTU specifications finished Finish subject to Design Review Jan 2016CTP and LTU Design Review Feb 2016Schematic capture of LTU board March 2016Electronics Design Review March 2016LTU design completed May 2016PCB layout completed (RAL) Subject to RAL TD availability July 2016LTU prototypes finished July 2016 Basic FW & SW functions and emulator completed Nov 2016LTU prototypes tested CTP specifications finished Dec 2016LTU Production Readiness Review

2017 Milestones DateLTU MilestoneCTP MilestoneComments March % of LTUs produced March 2017 Fully functional FW and SW completed May 2017 LTU Production finished May 2017 CTP design completed May 2017 Schematic capture of CTP board May 2017 CTP Electronics Design Review June 2017 PCB layout completed (RAL) Subject to RAL TD availability Aug 2017 CTP prototype finished Oct 2017 Basic FW and SW complete Dec 2017 Testing of CTP finished

Milestones DateLTU MilestoneCTP MilestoneComments Feb 2018 CTP pre-series production finished Feb 2018 CTP Production Readiness Review June 2018 Integration tests of trigger system with DAQ (in CERN lab) completed Aug 2018 CTP Production Finished March 2019 Installation and testing of trigger system in ALICE cavern completed Aug 2020Commissioning of trigger system with all ALICE detectors and systems completed

Summary Finances – should be enough for not much contingency Manpower – tight (extra effort would be useful) Schedule – on schedule but tight in 2016 and approximately six months contingency built in at the moment