Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.

Slides:



Advertisements
Similar presentations
Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
Advertisements

PEP II Transverse Feedback System Ron Akre Anatoly Krasnykh Uli Wienands MAC April 15, 2004.
Feedback on phase adjustment with BPTX Using scope and LHCb BPIM boards to readout BPTX signal BPIM only used for triggering, phase measurements (BPTX1-BC1,
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
The TIMING System … …as used in the PS accelerators.
RF Commitments and Major Issues E. Ciapala Input from: P. Baudrenghien, O. Brunner, T. Bohl, A. Butterworth, W. Höfle, T. Linnecar, E. Shaposhnikova, J.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
SB-N : Technical Workshop 1. General Presentation QUICK and EASY settings Alignment feedback Buzzer and Leds indication One person to set-up the columns.
Hydrogen Recombination Time (µs) RF Envelope (V) Here So We get Calculated from # of protons per bunch Calculated from energy loss (voltage drop) in the.
RF Systems Commissioning O. Brunner AB/RF on behalf of the RF group (LTC – March ’08) Many thanks to L. Arnaudon, Ph. Baudrenghien, W. Hofle, D. Valuch,
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006.
ADT re-commissioning after LS1 A. Butterworth, W. Höfle, F. Killing, G. Kotzian, T. Levens, D. Valuch with many thanks to BE/OP LBOC, ADT re-commissioning.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Requirements for the PS/PSB TFB board 1 Alfred Blas Working group meeting - 07 December Sampling frequency 2.Required Delayed Clocks.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Run 10 Start-up Status
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
Diamond LLRF Activities Pengda Gu For DLS RF Group.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
ApEx needs for CeC PoP Experiment December 11, 2015.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Operation Status of the RF Systems and Taiwan Photon Source
Cost Optimization Models for SRF Linacs
RF acceleration and transverse damper systems
Digitizers in CCR for transverse wide-band pick-ups
Focus Coil Quench Detector
RF and Sequences Andy Butterworth BE/RF
BEPCII RF POWER SOURCE AND INPUT COUPLER
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
LLRF and Beam-based Longitudinal Feedback Readiness
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
SPS Transverse Damper System
Synchronization Process PSB example
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Beam dynamics requirements after LS2
LHC Fast Timing Commissioning
Operational Experience with LCLS RF systems
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
LHC Morning Meeting - G. Arduini
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Tuesday 20 September 2011.
Wednesday morning Waiting for PS – problem on RF cavity.
Saturday 26 November 2011.
Presentation transcript:

Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2 lines somewhat unstable at 2MV more measurements needed this week – reliability tests ongoing all cavities were run overnight at 2MV with Q=60000, Klystron power ~185kW some cavities tripped due to He pressure spike (magnet quench), 1 trip due to bad contact Cavity phasing – “quick” procedure established, avoids 16x access in RF zone – cable measurements done last week & phase offsets calculated – assume cable lengths inside modules are equal (~1mm)

RF Low-Level system layout (simplified)

Readiness for RF capture Beam control – Beginning of next week, BC equipment (phase and synchro loops) will be installed and commissioned in SR4 priority for this week is cavity optimisation – Radial loop not needed for first beam (used during ramp) Diagnostics – Injection mountain range available via OASIS – Initial commissioning done in SR4 using analogue signals frequency slip delays setup for beam phase sampling, etc. trigger initially on beam then on frev + delay – Video connection to CCC for longitudinal pickup from scope in SR4 – Additional signals (peak detected pickup) via OASIS or 2 nd video channel