23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.

Slides:



Advertisements
Similar presentations
16JAN08CaloECSMeeting - Xvc1 Calo ECS meeting DCS and PS/SPD temperature monitoring Xavier Vilasis-Cardona.
Advertisements

S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)Overview of the system. 2)Discriminating errors. 3)Tricks. RUNNING PRS AND SPD – FIRST DRAFT TUTORIAL.
The ATLAS/TILECAL Detector Control System Helena Santos (LIP − Lisbon) on behalf of the Tile Calorimeter Group EBC LBC LBA EBC TILECAL is the hadronic.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The procedure to replace CALO rectifier (AC/DC converter) 1.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
The High Voltage, Monitoring and Control systems of the Hadronic and Electromagnetic calorimeters are essentially slow control based, and therefore are.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
CALO News Pascal Perret LPC Clermont 26 November 2014.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
26JUN08Calo Piquet Training Session - Xvc1 DCS and DSS Xavier Vilasis.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Calorimeter Performance Paper Xavier Vilasís-Cardona Calo Meeting - Xvc1.
SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
Upgrade Infrastructure Workshop Calorimeter upgrade Infrastructure Cooling – piping Frédéric Machefert Laboratoire de l'Accélérateur Linéaire.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
Ken Wyllie, CERN LHCb power supplies, 19th May Does each sub-detector have enough power supplies for the upgrade???? If not, do they need: More.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
Upgrade: Calo Trigger Calorimeter detector 20 Link = 4 copper wire Serial LVDS 280Mhz 32
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
CALO News Pascal Perret LPC Clermont 22 January 2012.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Presentation transcript:

23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc

23MAY07Xvc - Calo ECS Working Group2 Calorimeter Control Structure DAQ –SPECS –CCPCs – TELL1 DAI –Crate LVPS DCS –LVPS – Wiener Maraton –CAN – Temperature –Cooling HV –SPECS – LED system

23MAY07Xvc - Calo ECS Working Group3 Calorimeter Control Structure SPECS –Radiative Source CAN bus –1 PC Power Supply Control –1 PC BusesMasters PCs CACA CA HV+LEDCrateHV+LEDCrate HCAL ECAL PRS-SPD Total

23MAY07Xvc - Calo ECS Working Group4 LVPS – Wiener RCM distribution A-side Rack B1B01 Crate B1B01F05 SlotNameIP addressSystemRack 1Crate 1Rack 2Crate 2 1psmatn04.lbdaq.cern.ch PRS/SPDL3B11PRS4L3B12PRS5 2psmatn05.lbdaq.cern.ch PRS/SPDL3B13PRS6L3B14PRS7 3ecmatn05.lbdaq.cern.ch ECALL3B11ECAL15L3B11ECAL16 4ecmatn06.lbdaq.cern.ch ECALL3B12ECAL17L3B12ECAL18 5ecmatn07.lbdaq.cern.ch ECALL3B13ECAL19[not connected] 18ecmatn08.lbdaq.cern.ch ECALL3B14ECAL20L3B14ECAL21 19hcmatn03.lbdaq.cern.ch HCALL3A13HCAL24L3A13HCAL25 20hcmatn04.lbdaq.cern.ch HV/LEDL3B11 HV/LED ECAL AL3A13HV/LED HCAL A 21psmatn06.lbdaq.cern.ch PRS/ SPD VFEL3B13 PS/SPD VFE AL3B13PS/SPD VFE A

23MAY07Xvc - Calo ECS Working Group5 LVPS – Wiener RCM distribution C-side Rack B1B01 Crate B1B01F33 SlotNameIP addressSystemRack 1Crate 1Rack 2Crate 2 1 psmatn01.lbdaq.cern.ch PRS/SPDL3B04PRS0L3B03PRS1 2psmatn02.lbdaq.cern.ch PRS/SPDL3B02PRS2L3B01PRS3 3ecmatn02.lbdaq.cern.ch ECALL3B04ECAL8L3B04ECAL9 4ecmatn03.lbdaq.cern.ch ECALL3B03ECAL10 5ecmatn04.lbdaq.cern.ch ECALL3B02ECAL11L3B02ECAL12 17ecmatn01.lbdaq.cern.ch ECALL3B01ECAL13L3B01ECAL14 18hcmatn02.lbdaq.cern.ch HCALL3A03HCAL22L3A03HCAL23 19hcmatn01.lbdaq.cern.ch HV/LEDL3A03 ECAL HV/LED CL3B01 HCAL HV/LED C 20psmatn03.lbdaq.cern.ch PRS /SPD VFEL3B03PS/SPD VFE CL3B03PS/SPD VFE C 21SPARE

23MAY07Xvc - Calo ECS Working Group6 Agilent Power Supplies Rack D3B04 SystemNameIP address ECAL four units PS (100V, 30V,100V, 30V for A and C sides);hcagil01.lbdaq.cern.ch HCAL four units PS (100V, 30V,100V, 30V for A and C sides);ecagil01.lbdaq.cern.ch PS/SPD one unit PS (150V for side A);psagil01.lbdaq.cern.ch PS/SPD one unit PS (150V for side C);psagil02.lbdaq.cern.ch PS/SPD two units PS (18V, 18V for side A and C);psagil03.lbdaq.cern.ch

23MAY07Xvc - Calo ECS Working Group7 Top Calorimeter Hierarchy

23MAY07Xvc - Calo ECS Working Group8 TOP PreShower Hierarchy

23MAY07Xvc - Calo ECS Working Group9 PRS_DAQ

23MAY07Xvc - Calo ECS Working Group10 XCAL_DAQ

23MAY07Xvc - Calo ECS Working Group11 Comments No Side Partition Crates can be individually selected Subdetector projects will run on SPECS PCs (either A or C side) HCAL_DCS shall include the radiative source Global calorimeter control units will run –HCAL SPECS PC –CALO DCS PC –Whichever is less loaded Groups should deliver device units Hierarchy is centrally set up