Rural Water Programme 2006 Evaluation of Progress John Fitzgerald John Fitzgerald Engineering Inspector Rural Water Programme 2006 Evaluation of Progress.

Slides:



Advertisements
Similar presentations
The view of a CIBSE President. Rob Manning. SalesBriefing Concept Design Production Design Drawing and Manufacture Construction Commissioning and Handover.
Advertisements

Tendering Yuck!.
Bid Negotiation using the Competitive Dialogue
Enable Procurement Agencies to Fulfill their Roles Push Smooth Implementation of Project Procurement Foreign Debts Management Center, Hebei Provincial.
Rural Water Programme 2006 Evaluation of Progress Block Grants : Allocation / Drawdown Carthage Cusack – Water Services Section.
Budget vs. Design Trevor Hipkins Davis Langdon John Cameron GHD LAPA Annual Conference 2013.
In association with From Decent Homes to Sustainable Communities The National Change Agent for Capital Works in Social Housing January 2007 John Connaughton.
Project Control System Follow up Workshops. 2 Agenda Introduction Discussion Worked Example Close User Feedback Page Amendments to the PCS Discussion.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Chapter 1 Introduction to Cost Estimates What is an Estimate? An estimate is an evaluation of a future cost. A building cost estimate is an attempt to.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
ACTION PLAN LIN ASSISTANT ENGINEER KUNMING-CHINA.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
National Federation of Group Water Schemes Water Services National Training Group 5 th Annual Rural Water Services Conference 13 th September 2006.
Member of: Austrian Showcase Sarajevo
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
 Manager of public procurement is not the final consumer  Number of people participating in taking decision  Volume of trade  Formalized process of.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
Results achieved under IFAD VII and directions for results measurement under IFAD VIII Edward Heinemann Programme Manager, Action Plan Secretariat, Office.
Environmental Impact Assessment in the Slovak republic.
SLIGO COUNTY COUNCIL RURAL WATER PROGRAMME. BACKGROUND Devolution of Responsibility for Group Water Schemes to Local AuthoritiesDevolution of Responsibility.
©2002 Gammon Construction Limited. All Rights Reserved Low Carbon Construction – A Contractor’s Perspective and Experience 21 September 2010 Hong Kong.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
MGT 575 Summer 2008 Purchasing. MGT 575 Summer 2008 Steps in the Purchasing Process Accurate description of desired commodity or service Selection of.
Presentation to Grangegorman Project Team Environmental Health Sciences Institute Update (14 th Nov 2012)
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
Rural Water Programme 2006 Evaluation of Progress Jim Ganley Jim Ganley Water Services Water Services.
Water Services National Training Group and National Federation of Group Water Schemes 7 th Annual Rural Water Services Conference 18 th September 2008.
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: Nov. 30, 2009 EN 15459: Energy performance of buildings – Economic evaluation.
Extra Care Housing The Next Generation 16 September 2015.
S&E and BMW Regional Operational Programmes 14 – 20 Training for Local Authorities involved in DUCGS projects, 21st April 2016 Procurement Vincent Dunphy.
Open Interchange Consortium XZIG /11/12 1 XML & E-COMMERCE SPECIAL INTEREST GROUP (XZIG) 18: :00 Tue 12/11/2002 Stream: E-commerce Tenders.
Amendments to the Public Works Contracts
ORIO Project Plan Procurement Bas Schilperoort Opening slide.
Content of Tender Dossier - Instructions to Tenderers - Tenders
National Report to EU Commission on measures to achieve compliance with the EU Drinking Water Directive Presentation to: Seminar on Progress of Rural.
Contract Award Procedures
Preliminary guidelines for review and assessment of progress under the Protocol on Water and Health Dr. Rainer E. Enderlein, Consultant.
Particular Conditions of Contract & Appendix to Tender
Drawings Introduction to FIDIC - Drawings -.
Administration of a FIDIC Contract - Financial Management
Qualification Criteria and Available Tender Capacity
Revisions to the Administrative Code
International Open Procedure (1) – PRAG 4.3
International Open Tender
PSAA – Update for Society of District Council Treasurers
Particular Conditions of Contract & Appendix to Tender
Project Development and Managing your Build Agenda
Pre-contract Planning and Practice
Introduction to building contract
DTF implementation Roles and responsibilities
Bulgaria – Country Report
Construction Programs Bureau
Chapter Seven Constructions and Scale Drawings
Chapter Seven Construction and Scale Drawings
Identification, traceability and serialisation
Prices in Civil Engineering
Presentation transcript:

Rural Water Programme 2006 Evaluation of Progress John Fitzgerald John Fitzgerald Engineering Inspector Rural Water Programme 2006 Evaluation of Progress John Fitzgerald John Fitzgerald Engineering Inspector

Procurement Guidance Documents Part A:Rural Water Modulw (DBO) Part B:Small Wastewater Projects Part C:Small Water Supply Projects Part A:Rural Water Modulw (DBO) Part B:Small Wastewater Projects Part C:Small Water Supply Projects

Chapter 12: Conventional Procurement for GWSS

Prior to Group employing Consulting Engineer Local Authority will (a)Prepare Brief (b)Determine indicative scale of fee acceptable for grant purposes – if scheme advances to construction. Prior to Group employing Consulting Engineer Local Authority will (a)Prepare Brief (b)Determine indicative scale of fee acceptable for grant purposes – if scheme advances to construction.

Scale of fees: (a)Fee per member for preparation of design drawings and calculations still valid. (b)Scale of fees based on Circ. 11/87 Preliminary Report 0 – 20% Design and Tender Drawings. Up to 30% Conditions of Contract / Specifications. 0 – 20% Construction Stage. 0 – 30% (c)PSDS accures separate fee. (ACEI scale of fee dated 9/2/96) Scale of fees: (a)Fee per member for preparation of design drawings and calculations still valid. (b)Scale of fees based on Circ. 11/87 Preliminary Report 0 – 20% Design and Tender Drawings. Up to 30% Conditions of Contract / Specifications. 0 – 20% Construction Stage. 0 – 30% (c)PSDS accures separate fee. (ACEI scale of fee dated 9/2/96)

L. Doyle One Price Three Prices National Newspapers OJEU The Procurement “Goalposts” OJEU National Newspapers Three Prices One Price Waste Water Directive 04/18/EC Waste Water Directive 04/18/EC Water Directive 04/17/EC Water Directive 04/17/EC

L. Doyle One Price Three Prices National Newspapers OJEU The Procurement “Goalposts” Waste Water Directive 04/18/EC Waste Water Directive 04/18/EC Water Directive 04/17/EC Water Directive 04/17/EC

Water Quality Water Conservation Water Quality Water Conservation

New & Upgrade(85%) Takeover(100%) New & Upgrade(85%) Takeover(100%)

DBO Civil (85%) M&E(100%) DBO Civil (85%) M&E(100%)

Metering grants for DBO only. Universal Metering Domestic (85% grant subject to max €300) Non-domestic (85%) grant subject to max €250) Additional CLAR funding Metering grants for DBO only. Universal Metering Domestic (85% grant subject to max €300) Non-domestic (85%) grant subject to max €250) Additional CLAR funding