1 CF lab review ; September 16-19, 2013, H.Weerts Budget and Activity Summary Slides with budget numbers and FTE summaries/activity for FY14 through FY16.
CF lab review ; September 16-19, 2013, H.Weerts 2 Main theme for Argonne HEP 2 ENABLE Approach for Argonne HEP in short: Actions and activities are driven by “ enabling ” future of HEP Enable : Enabling US participation in ATLAS/LHC Developing new “ technologies ” for accelerators & detectors to enable experiments Interact with & use material science, photon science, computing, nano scale, accelerator expertise at Argonne to do this ( interact with other sciences); enable new technologies Transfer HEP expertise to other fields ( detector & accelerator expertise for example) Direction for future of field ( theory & roles in Snowmass 2013) Connections & collaboration with/resource for universities Connections to industry with new technologies Uniqueness: Basic development of new tools like: sensors, detectors, acceleration methods, computing …… driven by HEP needs & use non-HEP expertise at Argonne UNIQUE future HEP and do it in a way that is Reach out to expertise and technologies that other divisions at Argonne have; do it so both benefit and at some point pay for it
CF lab review ; September 16-19, 2013, H.Weerts 3 Budget & people in group Year/k$FY11FY12FY13FY14FY15FY16 KA231,2001,3901,4251,400 Early Career500 For beyond FY14 assume for each year ( Scenario A) For this budget: Get this
CF lab review ; September 16-19, 2013, H.Weerts 4 Evolution of program for different funding scenarios FY13 projected to end of the year; copy of spreadsheet that you have FY13 support (Actual)Cosmic Frontier - experimental research funding (KA230102) Personnel Support from DOE/HEP (in FTEs) Select Activity:SPTDESVERITASCTASelect TOTAL Permanent Ph.D Temporary Ph.D Graduate Students Engineer / Computing Professional Administrative / Technician Other DOE/HEP Funding including overhead (per activity): SWF(Actual, in $) 610, , ,899 29, ,647,303 M&S (Actual, in $) 153,500 16,000 5, ,500 Travel (actual, in $) 12,000 25,000 35, ,000 TOTAL 775, , ,899 29, ,893,803 Just for information. Show same numbers but in slightly different arrangement Note: Funding for FY13 was 1, = 1,925k$ Number in spreadsheets: 1,894k$ was estimated actual in August 2013
CF lab review ; September 16-19, 2013, H.Weerts 5 Scenario C -- wish list Evolution of program for different funding scenarios Contains Early Career Assumes SPT-3G will be next ANL investment thru LDRD (FY13- FY15); $3.6M Support for Computational Cosmology at ~50% level of group. Other sources for funding: Theory, ASCR, Computing, etc Assume VERITAS program transitions into CTA & CTA will be part of US HEP program DES analysis & development of OH suppression and LSST New group for DOE HEP CF
CF lab review ; September 16-19, 2013, H.Weerts 6 Scenario C -- wish list Evolution of program for different funding scenarios Summary of Scenario C Evolution of total request
CF lab review ; September 16-19, 2013, H.Weerts 7 Evolution of program for different funding scenarios Scenario A Phase out VERITAS/CTA program FY14= FY13-2% FY16=FY15=FY14= $1.9M/yr including Early Career How did we arrive at choices that we made? Need to make choices/priorities Assume an outcome of P5/where program is going –- our best guess Fold in what we think is best for US HEP & Argonne Where will Argonne contribution have largest impact Do not simply spread pain i.e. do not reduce every program Keep programs at sustainable level Take into account Early Career award –- enable it However: We are a national lab Need to support national program Feedback from this review Support HEP direction from P5 roadmap
CF lab review ; September 16-19, 2013, H.Weerts 8 Evolution of program for different funding scenarios Scenario A Phase out VERITAS/CTA FY14= FY13-2% FY16=FY15=FY14= $1.9M/yr including Early Career Assume SPT-3G Reduce funding from Scenario C. More other sources for funding: Theory, ASCR, Computing, etc DES analysis & development of OH suppression and LSST
CF lab review ; September 16-19, 2013, H.Weerts 9 Evolution of program for different funding scenarios Scenario A FY14= FY13-2% FY16=FY15=FY14= $1.9M/yr including Early Career Summary all years:
CF lab review ; September 16-19, 2013, H.Weerts 10 Questions & Comments….. Postdocs -- numbers Students Staff
CF lab review ; September 16-19, 2013, H.Weerts 11 THE END
CF lab review ; September 16-19, 2013, H.Weerts 12 Backup Slides
CF lab review ; September 16-19, 2013, H.Weerts 13 Facilities ( within division) 13 Electronics: Mechanical: All groups are in the HEP division Group Resources (14 people, 12.5 FTEs) : –( engineers to techs) –ASICS at Fermilab Serves several divisions; In FY12: ~50% work for HEP Group Resources (7 people) : –Engineers to techs ( From Nova, telescopes to DES support) Unique capabilities HEP only Division expanded into more space; added all of Building 360 ( 2 floors, labs, conference rooms + offices) Space: 23K sq ft buildings + labs Close interactions: science engineering 2007 2009 Upgrade of lab 2011 2012 AWA extension
Vision for Argonne HEP: We think investments in building strong connections both inside and outside HEP will have the strongest impact in revitalizing HEP. More efficient research –Increase collaboration with and among universities Universities take better advantage of the lab infrastructure (beyond HEP!) Lab gains collaboration and broadens their portfolio of expertise Better serve the young people in HEP –Give opportunities to students of gaining experience in Hardware, computing Other Frontier areas –Opportunities to connect with industry HEP should better integrate into other scientific/technical community as well as industry. –Work across disciplines -- multidisciplinary. –Leads to better understanding and support for HEP Promoting more collaboration in diverse areas: this will lead, ultimately, to better communication and coherence in the HEP and the science community. CF lab review ; September 16-19, 2013, H.Weerts 14
CF lab review ; September 16-19, 2013, H.Weerts 15 Scenario C -- wish list Evolution of program for different funding scenarios FY14 - Scenario CCosmic Frontier - experimental research funding (KA230102) (FY14=FY13 + new requests prioritized) Personnel Support from DOE/HEP (in FTEs) Select Activity:SPTDESVERITAS Computational CosmologyCTATOTAL Permanent Ph.D Temporary Ph.D Graduate Students Engineer / Computing Professional Administrative / Technician Other DOE/HEP Funding including overhead (per activity): SWF(Actual, in $)564,357587,619392,210330,23930,7661,905,190 M&S (Actual, in $)297,00020, ,000 Travel (actual, in $)40,00030,00060,00025, ,000 TOTAL901,357637,619452,210355,23930,7662,377,190 FY15 - Scenario CCosmic Frontier - experimental research funding (KA230102) (FY14=FY13 + new requests prioritized) Personnel Support from DOE/HEP (in FTEs) Activity:SPTDESVERITAS Computational CosmologyCTATOTAL Permanent Ph.D Temporary Ph.D Graduate Students Engineer / Computing Professional Administrative / Technician Other DOE/HEP Funding including overhead (per activity): SWF(Planned, in $)579,594603,485371,203649,08563,1932,266,559 M&S (Planned, in $)292,00020, ,000 Travel (Planned, in $)40,00030,00060,00025, ,000 TOTAL911,594653,485431,203674,08563,1932,733,559
CF lab review ; September 16-19, 2013, H.Weerts 16 Evolution of program for different funding scenarios Scenario A All reduction taken in VERITAS/CTA FY14 - Scenario ACosmic Frontier - experimental research funding (KA230102) (FY13-2%) Personnel Support from DOE/HEP (in FTEs) Select Activity:SPTDESVERITAS Computational CosmologyCTATOTAL Permanent Ph.D Temporary Ph.D Graduate Students Engineer / Computing Professional Administrative / Technician Other DOE/HEP Funding including overhead (per activity): SWF(Actual, in $) 504, , , ,542 30,766 1,518,533 M&S (Actual, in $) 282,000 10, ,000 Travel (actual, in $) 35,000 15,000 25, ,000 TOTAL 821, , , ,542 30,766 1,900,533 FY15 - Scenario ACosmic Frontier - experimental research funding (KA230102) (FY15=FY14) Personnel Support from DOE/HEP (in FTEs) Activity:SPTDESVERITAS Computational CosmologyCTATOTAL Permanent Ph.D Temporary Ph.D Graduate Students Engineer / Computing Professional Administrative / Technician Other DOE/HEP Funding including overhead (per activity): SWF(Planned, in $) 518, , ,268 31,596 1,488,595 M&S (Planned, in $) 292,000 20, ,000 Travel (Planned, in $) 40,000 30,000 25, ,000 TOTAL 850, , ,268 31,596 1,895,595 Fix budget: FY14= FY13-2% FY16=FY15=FY14
CF lab review ; September 16-19, 2013, H.Weerts 17