Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.

Slides:



Advertisements
Similar presentations
FGT installation disks … viewed from the back (From West end looking in towards vertex). SSD cables go in the spaces above and below the rails on the left.
Advertisements

Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
Kwikset Rekey Ultramax Rekeying the Ultramax by Kwikset this presentation is designed for beginners.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
August 8, 2007 Flange Options for the Antineutrino Detectors Kirk McDonald Princeton University (August 8, 2007)
Installation. Indoor Unit Installation Typical Installation.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
GERDA collaborationmeeting, Ringberg castle Béla MajorovitsTG5 Review: Infrastructure on top of the tank1.
J-FRM-0101 Revision with Reason No.DateInitials Drawing No. D’Vinyl Inc. Descriptive Part Name Designed byChecked by Engineer Drawing Type Foot Plate Date.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Installation. Indoor Unit Installation Typical Installation.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
General Instructions for “KidWind Light” wind tunnel.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
New design With fewer parts and easier manufacture degrees 20mm 245.
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
C1 inspection results T. Meighan. C1 Lead Block Area Upper chill plates bowed upwards from side pressure (?) Top fingers pulled away from winding pack.
Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Learning Objectives • Create sweep features. • Create lofted features.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
DUNE APA Overview for SBND Synergy Discussion Lee Greenler University of Wisconsin Physical Sciences Lab September 2, 2015.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
Feedthroughs & HV supplies Sven Vahsen 4/1/2015. HV supplies: quotes KV CAEN HV supplies are to pricey (~$25k for 8 channels of 15kV) So, I want.
4/22/20131BEAST MEETING Reminder of BEAST TDR schedule (expected deliverables in red) April 19 th: – Draft specifications for each beast subsystem We need.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
4/22/20131BEAST MEETING Draft Specifications of Micro-TPC System red: to be determined/checked who will provide it, install it, operate it: U. Hawaii group;
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Correspondence with HuntVac. Jan 13 Sven, Thanks for the call. Just to recap (and so I don’t lose my notes): · Redesign AL box vessels. · QTY.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
3/9/20131BEAST KEK CAD style figures needed For NIM paper: 1.Dcube-micro sideview (Marc) 1. for BEAST.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Correspondence with HuntVac
Florian Buchsteiner (HEPHY Vienna)
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
Pointers for putting things in payload boxes
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
SBN Far Detector Installation & Integration
GLAST Large Area Telescope:
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
TPC Support and Constraint TPC Support
Test box for ProtoDUNE SP – Integration Test
Design of Distribution Feedbox at LHC P7
2.2 Gallon TourTank Installation
Info. For CEAF Heated Breather Tube Change Engines: QSB4. 5/6
NISSAN Z31 & Z32 OIL PUMP DIFFERENCES
Bunker Wall Design Wall ESS
Presentation transcript:

Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides (p2-12) that I plan to discuss with him. I would like to suggest the following for phase 2, and welcome feedback from the BEAST group –we mount TPC and He-3 tubes separately, I think this will make it easier for us to freeze the designs in a timely manner –University of Victoria designs the He-3 tube mounts –we use the free SVD dock positions for the TPCs, and the free VXD positions for the He-3 tubes –we mount the TPCs with small brackets, similarly to the dock boxes. This way we don't need to remake our TPC vessels in case there is a change in the CDC cover design or mounting holes, or even just in case there is a communication problem between the groups in involved. See p 7 for conceptual design. –the TPCs will have all services except one HV cable coming out at the end facing the CDC. The HV cable comes out the side. This way we keep to outer/inner r regions free, as Tscharlie preferred for allowing cable/tube routing across detectors in phase 3. –for TPCs we are planning to stay below 41 cm total in z (see page 14). That includes everything, bracket, vessel, cables Main question to Alex and Tscharlie: is 41cm OK for both forward and backward? How much extra space is there? 1 Sven Jan 13 th BEAST Meeting

Planned Changes to TPC 1.remove KF feed-throughs & claw clamps from side A and B, replace with custom feedthrough plate on side A 2.add sixteen bolt holes for vessel mounting 3.modify lids for slight overpressure, in addition to vacuum, operation  Thicker lid and/or additional lid bolts 4.minor dimensional changes (length) – reduce length – move EDM slot positions. Could now be milled for cost savings, OK if they don’t extend to bottom of vessel. 5.all vessel and thread dimensions metric 6.titanium inserts for all threads 7.[tbd] add one KF-16 feedthrough for HV on long end Open questions 1.8kV feedthrough position and mounting

Current design Documentation at 3 Side A Side B 31 cm outsize length in z

Current feed-throughs on endplates 13.0 cm 10.4 cm 2.16” HV:< 5kV 4 pins) LV: <=5 V (<=50 pins) KF40 to vacuum pump Pressure relief gas in gas out UHV: 20 kV (1 pin) KF-40 KF ” Side B Side A

REQUESTED CHANGES 5

1. remove KF feed-throughs & claw clamps from side A and B, replace with custom feedthrough plate on side A We need to fit this vessel in a tight space, and need to reduce length. The current clamps are also a bit fiddly. We will replace the fittings with a single, custom feedthrough plate, similar to the one shown below. This plate should become a small lid, attached with bolts, sealed with o-ring. Questions: Can HuntVac machine the lid, and we get feedthrough vendor to weld in feedthroughs? Alternatively, could HuntVac also do this welding? December 2, 2014Rosen/Vahsen TPC corner concept6 Side A

2. Additional bolt holes for vessel mounting Top view/no scale Internal corners require fillets Mounting bracket to CDC end ring M6 w/ Ti insert 4 (?) mm Clearance Mounting holes: M4 blind, TI insert Vessels will be mounted on an “end plate”, similar to photo below, right. Vessels will be mounted with side A facing the end plate To avoid interference between mounting and the new feedthrough plate/lid, we’d like to add four mounting holes (as shown in sketch below), near each corner of vessel, i.e. eight holes total near side A + another eight near side B. (sketch shows two holes, but there should be another two below) Corbin, what bolt sizes do you recommend (M4/M6 are guesstimates) end plate vacuum vessel custom feed-through lid

December 2, 2014Rosen/Vahsen TPC corner concept8

December 2, 2014Rosen/Vahsen TPC corner concept9

3. Improved lids, suitable for slight overpressure, in addition to vacuum  Thicker lid and/or additional lid bolts We want to operate without leaks in any of the following three scenarios a)vacuum in vessel (i.e. -15 psig) b)same pressure inside and outside (0 psig) c)slight overpressure in vessel (~ +5 psig) We have severe space constraints. Two options –Thicker lid in middle only (cannot extend corners due to lack of space) –Thicker vessel wall to accommodate two extra bolts in lid? December 2, 2014Rosen/Vahsen TPC corner concept10

4. minor dimensional changes (length) –reduce length by ~5cm, for 26 cm outside length –move EDM slot positions. Both to start 5cm from inner wall. Slots can now be milled for cost savings, OK if they don’t extend to bottom of vessel. 11 ~31 cm  26 cm 5cm

Other Requests & Open Questions all vessel and thread dimensions metric titanium inserts for all threads Open questions 1.Vessel length could change one more time 2.8kV feedthrough position and mounting add KF-16 feedthrough to long side of vessel? Or permanently weld in the feedthrough? December 2, 2014Rosen/Vahsen TPC corner concept12

BACKUP SLIDES 13

Z-length of TPC Need Total length <= 41 cm December 2, 2014Rosen/Vahsen TPC corner concept14 vessel lidlid Plug Cable bend radius bracket <=15cm <=26cm outside vessel, z cm of z-space inside vessel 5cm 8kV feedthrough (KF16)

December 2, 2014Rosen/Vahsen TPC corner concept15