The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.

Slides:



Advertisements
Similar presentations
QUARKNET 2011 SESSION 1 1. Abstract Week One Hardware Performance Plateauing Flux Shower Lifetime Purpose, Research Question, Hypothesis Experimental.
Advertisements

CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
D0 Calorimeter Meeting 11 Feb 2003 Lee Sawyer Louisiana Tech University ICD Update: January Shutdown Work Lee Sawyer On behalf of Andy White, Mark Sosebee,
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
Far Detector Data Quality Andy Blake Cambridge University.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
1 TPC online  offline calibration November 2002.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
12 February 2002 Cal Mtg - D0 Collaboration Alan L. Stone Louisiana Tech University ICD LED Run Status Purpose ADC to GeV Conversion Basics of ICD LED.
Feb 10, 2005 S. Kahn -- Pid Detectors in G4MicePage 1 Pid Detector Implementation in G4Mice Steve Kahn Brookhaven National Lab 10 Feb 2005.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Problems with Muon System N. Bondar O.Maev
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
Jan, 2001CMS Tracker Electronics1 Hybrid stability studies Multi – chip hybrid stability problem when more then ~ 2 chips powered up -> common mode oscillation.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig FAR DETECTOR: 99.7% live time (wall clock) 99.9% (pot weighted) Annual hoist inspection.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb, Water, Helium.
Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
June 30th 2008Jacques Lefrancois1 CW base studies Last week June 24th at calo meeting : news that preliminary test done by Yuri Gilitski indicated that.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
Results with the RPC system of OPERA and perspectives
Weekly PDL report (Jul 7-14)
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016

Data Live Time – Jan 28- Feb 3, ×10 19 POT MINERvA 96.6% MINERvA*MINOS 96.2% 2

Data We are still getting DAQ errors 1-2 times a day. The errors are communication errors in the daisy chains which reads out the FEBs. These errors cause the DAQ to stop or skip subruns. –A chain reads out 5-10 FEBs. There are 59 chains. –Virtually all the DAQ errors occur on 2 chains, & is crate #, 6 is croc #, & 0 is readout cable connector # in croce. This # shows up in the logs and nearline plots. –These errors cause a live time loss of a couple %. Jan 29 – 96.0%, DAQ error on chain Jan 31 – 94.5%, DAQ error on chain Feb 1– 96.7%, DAQ error on chain

Feb 2-4 Beam Downtime Chain has 5 FEBs. We replaced of the 3 FEBs. We got an DAQ error, so we replaced the other 2 FEBs. We have not gotten a DAQ error on it since then. –One of the replaced FEBs has a TriP chip with high cross talk. This was seen after the beam came back. We will replace this FEB. We didn’t work on the chain during the beam downtime. –It didn’t give a DAQ error during the beam down time while did. 4

Feb 2-4 Beam Downtime We replaced a PMT which has some high voltage (HV) variation. The Cockcroft-Walton (CW) frequency for this tube was high. This meant the CW was working hard to keep the tube on the correct HV. –This required removing the roof We replaced a FEB which had a dead channel. We replace a FEB for PMT box with occasional HV spikes. Although the PMT box is usually the problem, first we usually replace the FEB. We haven’t seen the spike since then, but the spike is rare enough that we would not expect it after ½ week. Often, these spikes go away. 5

Rock Muons/POT 6 POT/Pulse Rock Muons/POT The higher proton power from 4+6 slipstacking beam causes ~ 2% decrease in rock muon tracking efficiency

Event Display 7 Tracker DIS X ViewV View U View

NuMI Beam Plots Feb 1-7, Phil made some changes: increased beam power axis to 700 MW & the grey average is now the best 2015 running. NuMI was running ~ 520 KW was the last 2 ½ days, breaking records on POT Congratulation to AD on this record.

Protons for the Week 9 xx 0.92×10 19 POT Feb 1-7, 2016

Protons for ME Run ×10 19 POT - Sep 6, 2013 – Feb 7, 2016 xx