TRAFF-20 Development Author: Nick Rubbi Prepared: March 2015.

Slides:



Advertisements
Similar presentations
Training Course: Task List. Agenda Overview of the Task List Screen Icons across the top Making Appointments Viewing Appointments & Filters Working Your.
Advertisements

TRAFF-20 Development Author: Nick Rubbi Prepared: December 2011.
Practice Insight Instructional Webinar Series Eligibility Manager
Protocol Configuration in Horner OCS
Polycom Quotes on Demand Tool Partner User Guide Version 1.1
2009 MUTCD (Final Rule) Revisions Incorporated into the 2009 MUTCD CA MUTCD 2012 Revisions to Part 4 – Highway Traffic Signals.
SCATS Release Review SMUG, March 2013 Sydney.
Coordinate Based Tracking System
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
Gursharan Singh Tatla Transport Layer 16-May
2015 Traffic Signals 101 Topic 7 Field Operations.
RT-TRACS A daptive Control Algorithms VFC-OPAC Farhad Pooran PB Farradyne Inc. TRB A3A18 Mid-Year Meeting and Adaptive Control Workshop July 12-14, 1998.
Mapping Internet Addresses to Physical Addresses (ARP)
Applied Transportation Analysis ITS Application SCATS.
FireRMS SQL Audit, Archiving & Purging Presented by Laura Small FireRMS Quality Assurance.
What is Sure BDCs? BDC stands for Batch Data Communication and is also known as Batch Input. It is a technique for mass input of data into SAP by simulating.
DWINSA 2007 Website. Website Purpose Allow states to track status of questionnaires Allow systems >100K or states to upload project data.
Chapter 6 Control Using Wireless Throttling Valves.
Associate ® Typist – Transcription Module Starting Associate Transcription: To start Associate typist module, double click the Associate dictation icon.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Tuen Mun – Yuen Long LRT Traffic Control System 20 th April 2007 Prepared by Michael Chiu P26180/PS/PS PPT/LLH/13APR05.
Network Management Tool Amy Auburger. 2 Product Overview Made by Ipswitch Affordable alternative to expensive & complicated Network Management Systems.
MyFloridaMarketPlace MyFloridaMarketPlace Change Request Board August 30, 2007.
Cisco S2 C4 Router Components. Configure a Router You can configure a router from –from the console terminal (a computer connected to the router –through.
2 Session 26 EDExpress Pell Update: What’s New in EDExpress 9.1 Pell for 2003–2004.
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
Greta Robertson Kathy Hoffman /11/2011 SCEIS Finance Automated Interfaces.
(Business) Process Centric Exchanges
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
WEIGH STAR A Software for Weighing Systems. Features Weigh STAR is a S/W that is designed for weighing systems. It reads the weight (both Gross Weight.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
1 Supporting materials for RMS Recommendations for improvements from EDIM team (ESI ID Data Integrity Management team)
Controller Timers or timing processes Minimum green Maximum green Vehicle extension/passage time/gap time The minimum green timer becomes active.
1 PanelView ™ 300 Micro & MicroLogix ™ Lab 1. 2 Today you will receive training on the NEW PanelView 300 Micro operator terminal and the NEW version of.
T Project Review Sotanorsu I3 Iteration
Overview of MSWS Control of 212-LC July 15, 2006.
1 ARM University Program Copyright © ARM Ltd 2013 Using Direct Memory Access to Improve Performance.
Human Resources 1 G-Top Global Workflow Employee View September 2014.
SCATS Release Review SMUG, March 2013 Sydney.
Intel 8051 Another family of microcontroller is the Intel 8051 family. The basic 8051 microcontroller has four parallel input/output ports, port 0, 1,
Remote Data Entry Updates Lori Wangsness Kim Gallimore Lori Wangsness Kim Gallimore.
Post-Newsweek Training: WebScan March Training Agenda Order Entry Best practices New Features Upcoming Features.
Configuration Mapper Sonja Vrcic Socorro,
SCATS 6.10 Release Review SMUG, March 2013 Sydney.
LECTURE 18 16/11/15. MAKING THE INTERFACE CONSISTENT Consistency is one way to develop and reinforce the users conceptual model of applications and give.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Proposal for an Open Source Flash Failure Analysis Platform (FLAP) By Michael Tomer, Cory Shirts, SzeHsiang Harper, Jake Johns
1 eCoRepair New Release Slide Expanded view of Circuit Details Change to Circuit Looping text4 View of closed faults up to 30 days old5 - 7 Minor.
Extracting Information from an Excel List The purpose of creating a database, or list in Excel, is to be able to manipulate the data elements in ways that.
Starting Associate Dictation: To start the Associate Dictation double click the Associate dictation icon on your desktop or from the preferred link set.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
SPEAKER: MUHAMMAD REZA ZULMAN DATE: NOVEMBER 17, 2014 OPENFLOW SPECIFICATION.
Field Programmable Port Extender (FPX) 1 Remote Management of the Field Programmable Port Extender (FPX) Todd Sproull Washington University, Applied Research.
DSRC and SPaT, SSM, SRM & MAP
Zones 1 to 8 Siren Keypad Power 12V Data and clock By default: Zone 1 Entry Exit 2 Follower 3 Instant 4 Instant 5 Instant 6 Instant 7 Instant 8 Panic.
Active-HDL Server Farm Course 11. All materials updated on: September 30, 2004 Outline 1.Introduction 2.Advantages 3.Requirements 4.Installation 5.Architecture.
Orders and Invoices Supply Chain Platform: Rolls-Royce Training for Indirect Suppliers March 2016.
Windows Vista Configuration MCTS : Internet Explorer 7.0.
Use Cases & User Mocks Customer Call – Users and Objects.
WEC meeting TED status and WEC timing.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
Traffic Control & Coordination
Archiving and Document Transfer Utilities
SNUG, February 2017 Tauranga
* Topic 7 Field Operations
“What do I do ?”, “How do I do it ?”, What do I do it with ?
Use Cases & User Mocks Customer Call –
Implementing an OpenFlow Switch on the NetFPGA platform
Digital Chart Recorder Operation
Presentation transcript:

TRAFF-20 Development Author: Nick Rubbi Prepared: March 2015

Agenda Current status of work; Current status of work; Traff-20 VC=5; Traff-20 VC=5; Traff-20 VC=5, Revision 1; Traff-20 VC=5, Revision 1; Traff-20, VC=6, Revision 1; Traff-20, VC=6, Revision 1; Traff-20 VC=6, Revision ??   VC=7; Traff-20 VC=6, Revision ??   VC=7;

Traff-20 VC5 – Current Status Traff Software description CnnV5R20:Traff Software description CnnV5R20: –nn Controller Id (18 – QTC; 24 – Eclipse; 29 - ATSC/4); –V5 SCATS VC5; –R20 Indicates Traff-20; No change since 26 th April 2012; Latest Release Traff Build 29;No change since 26 th April 2012; Latest Release Traff Build 29;

Traff-20 VC5.1 – Current Status Work started on VC5.1 i.e. VC5 revision 1; in January 2014.Work started on VC5.1 i.e. VC5 revision 1; in January Work is in final stages of testing;Work is in final stages of testing; Traff Software description CnnV5.1R20, Traff build 1;Traff Software description CnnV5.1R20, Traff build 1; Changes will be ported to VC6 after testing;Changes will be ported to VC6 after testing; Changes were made to satisfy some long standing customer requests;Changes were made to satisfy some long standing customer requests;

Traff-20 VC5.1 - Changes Implemented Traff sends SG colours to SCATS;Traff sends SG colours to SCATS; –FRYG bits sent to SCATS each SG; SCATS can request SG colours:SCATS can request SG colours: –For all SGs – one off request; –Colour updates for all SGs (times out in 12 seconds); –Colour for a specific SG – one off request;

Traff-20 VC5.1 - Changes Implemented Traff filters flashing groups to prevent too many comms messages;Traff filters flashing groups to prevent too many comms messages; –Only the first two flash colours are sent back for flashing groups;

Traff-20 VC5.1 - Changes Implemented Colours reported for a monitored Pedestrian Group: WalkClearance Don’t Walk G FRFRFRFR FNFNFNFN R

Traff-20 VC5.1 - Changes Implemented Colours reported for a Flashing Group (where the SG colour is stable for less than 1 second): Flashing Yellow and Red (Wig Wag) OffOff Y FRFRFRFR FYFYFYFY N

Traff-20 VC5.1 - Changes Implemented SCATS users can operate logical detectors:SCATS users can operate logical detectors: –Pulse detector on for 4 secs; –‘Permanent’ on; (SCATS needs to reset the detector 60 sec ‘on’ timer) The simulated detector will affect: phase demands, extension, five minute counts, volume and non-occupancy data.The simulated detector will affect: phase demands, extension, five minute counts, volume and non-occupancy data.

Traff-20 VC5.1 - Changes Implemented SCATS can demand a phase option;SCATS can demand a phase option; The Call Phase (CLP) message has been extended to include a phase option:The Call Phase (CLP) message has been extended to include a phase option: –Zero – no phase option (default); –1-255 – option as programmed by personality; eg Option 2 to run diamond phase E2 option;

Traff-20 VC5.1 - Changes Implemented The Call Phase message has been extended to include the next phase time to termination (TTT);The Call Phase message has been extended to include the next phase time to termination (TTT); –Seconds up to 255;

Traff-20 VC5.1 - Changes Implemented The Next Phase (NXP) message has been extended to include:The Next Phase (NXP) message has been extended to include: –TTT (0-255 secs) for the next phase; –TTT updates for the running phase; –The phase option (0-255) for the next phase;

Traff-20 VC5.1 - Changes Implemented Advantages of TTT data:Advantages of TTT data: –Immunity to longer breaks in SCATS communications (without fallback and breaking marriage chains); –Allow personality to introduce features late in the phase (similar principle to Z5); –SPaT (Signal Group Phase and Timing) data (eg predict end of phase);

Traff-20 VC5.1 - Changes Implemented Advantages of TTT data:Advantages of TTT data: B Phase MinMin C Phase Comms Break NXP C B TTT C TTT C Option Fallback from Masterlink Mode B TTT C TTT Controller Moves to C if Demanded

Traff-20 VC5.1 - Changes Implemented If there is a Comms Break the controller will :If there is a Comms Break the controller will : –Prevent fallback as long as possible; –Hold Masterlink Mode during Intergreen and Minimum Green intervals; –Terminate Pedestrian movements when the controller’s comms timer would have expired; –Move to the last reported NXP if it is demanded (i.e. based on TTT time or Gap if allowed);

Traff-20 VC5.1 - Changes Implemented More information in the Pedestrian Status Message (PED):More information in the Pedestrian Status Message (PED): –Now sends Pedestrian clearance 1 and 2 status; –Still sends Walk and Demand status; –Delay and Walk2 status are sent in another message; Walk 1 Clearance 1 Don’t Walk Delay 1 Delay 2 Walk 2 Clearance 2

Traff-20 VC5.1 - Changes Implemented VC5.1 Region will work with Traff-20 VC5;VC5.1 Region will work with Traff-20 VC5; VC5 Region will work with Traff-20 VC5.1;VC5 Region will work with Traff-20 VC5.1;

VC6.1 - Current Status Traff-20 VC6 Rev 1 Test Release – Build 107 (released 18 th Dec 2014).Traff-20 VC6 Rev 1 Test Release – Build 107 (released 18 th Dec 2014). Still targeting release Traff-20 VC6 Traff Build 1;Still targeting release Traff-20 VC6 Traff Build 1; Testing of ATSC/4 Controller almost complete (some minor bugs to correct & conflict monitor testing);Testing of ATSC/4 Controller almost complete (some minor bugs to correct & conflict monitor testing);

VC6.1 Current Status - ATSC/4 Controller VC6 testing is going well with the ATSC/4 controller but suffers interruptions;VC6 testing is going well with the ATSC/4 controller but suffers interruptions; Testing is approximately 90+% complete;Testing is approximately 90+% complete; Latest software supplied by ATC is version 1.6; supplied on 12 th February 2015;Latest software supplied by ATC is version 1.6; supplied on 12 th February 2015;

VC6.1 Current Status - QTC Controller QTC provided hardware and software for the test controller on 3 rd February 2011;QTC provided hardware and software for the test controller on 3 rd February 2011; Software fails to run;Software fails to run; No current estimated software delivery date;No current estimated software delivery date;

VC6.1 Current Status - Eclipse Controller Tyco provided hardware updates to the test controller on 9 th November 2012;Tyco provided hardware updates to the test controller on 9 th November 2012; No current estimated software delivery date;No current estimated software delivery date;

VC6.?? - Current Status A the last SMUG meeting I discussed proposed changes for VC7;A the last SMUG meeting I discussed proposed changes for VC7; VC6.?? is an interim version leading to VC7;VC6.?? is an interim version leading to VC7; The VC6 protocol will be extended to fast track the delivery of a 16 phase controller;The VC6 protocol will be extended to fast track the delivery of a 16 phase controller;

VC6.?? - Changes Implemented Traff work to commenced in November 2014; - A, B, C, D, E, F, G, H, I, J, K, L, M, N, O, P16 Phases - A, B, C, D, E, F, G, H, I, J, K, L, M, N, O, P 16 Pedestrian movements;

VC6.?? - Changes Implemented 64 Vehicle detectors (TSC/4 requirement); IMAP one section – 96 entries; –64 Vehicle Detectors –16 Push Buttons; –16 Spare entries (for diode simulation etc); –One Physical input driving many logical inputs; –One Logical input driven by many physical inputs;

VC6.?? - Changes Implemented IMAP support for additional Physical Inputs: –External Inputs (Contacts) 1-64; –Internal Inputs (Loops) 1-64; –Two new Input types eg Serial 1-64;

VC6.?? - Changes Implemented New Personality Format (caters for future expansion); New Traff RAM layout (caters for future expansion);

VC6.?? - Changes Implemented Change Personality Phase test conditions to Phase test operators with operands eg: – TTOAB >>>TTO, AB – INDEF>>>IN,DEF – INAFG,TOAFG>>>IN,AFG,TO,AFG New Personality DDEF table to support this;

VC6.?? - Changes Implemented More personality flags (0-127);

VC6.?? Out Standing Work - TIME SETTINGS Increase in number of Time settings; Time settings for the 8 Approach Timers; Time settings for additional Phases, Pedestrian movements and Detectors (presence times);

VC6.?? Out Standing Work - TIME SETTINGS Increase General Purpose Time Settings (96 total); Spare ‘holes’ in memory for future expansion; 16 bit CRC Protection; (Time Settings and Flexilink Data)

VC6.?? Out Standing Work - FLEXILINK Changes to Flexilink; –Quickest way to getting 16 phases to the field; –SCATS Plan Based operation will add substantial delays; Do you want more Plans and Schedules ??? (Currently has Plans 0-10 & Schedules 1-20)

VC6.?? Out Standing Work - FLEXILINK (Remove Personality sequence restriction)Phase Sequence Based on Call Pulse order; (Remove Personality sequence restriction) (Remove Personality Release Table restrictions)Each Phase to have Release or NG (on/off) specified in the Plan data; (Remove Personality Release Table restrictions) (Remove Personality Look-ahead Table restrictions)Each Phase to have Look-ahead phases specified in the Plan data; (Remove Personality Look-ahead Table restrictions)

VC6.?? Out Standing Work - FLEXILINK (Remove Personality Sequence Pivot Phase restrictions)Plan Data to allow Pivot (i.e. arterial) to be specified; (Remove Personality Sequence Pivot Phase restrictions) Plan Data to allow PD to be specified for each phase; Each Plan to have 8 general purpose Special Facility Flags ;

VC6.?? Out Standing Work - FLEXILINK Each Plan to have 32 XSF Flags; CT increase to 300 CG steps; (Allow 1 and 2 seconds CG steps) Transaction based changing of Plan and Schedule data;

VC6.?? Out Standing Work - FLEXILINK The Flexilink changes are a step towards SCATS Plans in the controller!! Note: NO Pedestrian Plan data!!!

VC6.?? Out Standing Work Approx 2.3kBytes – Times Settings (with spare data); Approx 1.8kBytes – Flexilink Data (with spare data);

VC6.?? - Out Standing Work Extend SCATS VC6.1 Protocol – new VC6.?? Messsages; Port VC5.1 changes; Update Dictionary; Update HHT; Log changes to dimming;

VC7 - Proposed Changes SCATS Plan Based operation; (including Pedestrian control) Note: SCATS Plan based operation adds immunity to unreliable communications;

VC7 - Proposed Changes Personality to store item descriptions to send to SCATS eg: –Site Location eg: –Site Location eg: “OXFORD ST, LIVERPOOL ST & WENTWORTH AV, SYDNEY” –Plan, Sheet, Issue eg: –Plan, Sheet, Issue eg: “VV.0681,18,A” –Map Reference: –Vehicle Group Name eg: –Vehicle Group Name eg: "V1 = A/B/F1 O/L" or "Unused“ –Pedestrian Group Name eg: –Pedestrian Group Name eg: "P2 = D/E WALK" or "Unused“ –Detector Name eg: –Detector Name eg: "D1 = A-B L" or "Unused“ –Pushbutton Name eg: –Pushbutton Name eg: "PB2 = C PB"or "Unused"; –Special Signals eg: –Special Signals eg: “XSF1 used to control B RT filtering";

VC7 Proposed Changes Flash Operators in Personality;

Changes Since Last SMUG Meeting NGEN: Latest Version – dated 11 th July 2014;Latest Version – dated 11 th July 2014; EULA Updated;EULA Updated; Correct bug in VC6 Vehicle Group vs Vehicle Group conflict dialog box display window selection;Correct bug in VC6 Vehicle Group vs Vehicle Group conflict dialog box display window selection; Improved the “Show Conflict Table Data” display when there are many conflicts to show;Improved the “Show Conflict Table Data” display when there are many conflicts to show;

Changes Pending NGEN: Changes needed to support VC6.??:Changes needed to support VC6.??: –16 phases and 16 pedestrian movements; –New Personality Format; –New Dictionary;

Changes Since Last SMUG Meeting (March 2014) Wintraff Applications: Now managed by Kevin Chen;Now managed by Kevin Chen; Need to validate Traff-20 VC6.1 before releasing;Need to validate Traff-20 VC6.1 before releasing;

Changes Since Last SMUG Meeting (March 2014) WintraffSingle: VC5 Version (Traff Bld 28) – 11 th Jan 2012;VC5 Version (Traff Bld 28) – 11 th Jan 2012; VC6.1 ready for release after Traff validated;VC6.1 ready for release after Traff validated; Displays Logical and Physical groups as requested by John Buckland (SMUG 2014);Displays Logical and Physical groups as requested by John Buckland (SMUG 2014); VC6.?? (16 phases and 16 peds) is work in progress;VC6.?? (16 phases and 16 peds) is work in progress;

Changes Since Last SMUG Meeting (March 2014) WintraffSimulation: VC5 Version (Traff Bld 29) – 25 th May 2012;VC5 Version (Traff Bld 29) – 25 th May 2012; VC6.1 close to release - more testing required;VC6.1 close to release - more testing required; VC6.?? (16 phases and 16 peds) – work not started;VC6.?? (16 phases and 16 peds) – work not started;

Changes Since Last SMUG Meeting (March 2014) WintraffTest: VC5 Version (Traff Bld 29) – 25 th May 2012;VC5 Version (Traff Bld 29) – 25 th May 2012; VC6.1 – work not started;VC6.1 – work not started; VC6.?? (16 phases and 16 peds) – work not started;VC6.?? (16 phases and 16 peds) – work not started;

VC6 Changes Since Last SMUG Meeting (March 2014) HHT Manual (VC6): (No Changes) RTA-TC-301-K Hand-held terminal operator's manual.pdf - Dated 4 th March 2014

Feedback No Feedback received from SMUG members since last meeting;No Feedback received from SMUG members since last meeting; Feedback is encouraged to help determine work priorities and for proposal of new features ;Feedback is encouraged to help determine work priorities and for proposal of new features