Doubling the Target Insertion Rate P J Smith for MICE VC 163.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
Muons going through MICE should –Have ISIS proton timing structure –Generate TOF signals –Satisfy ISIS and TOF trigger requirements MICE tracker DAQ will.
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
The MICE Target Lara Howlett University of Sheffield.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
ISIS Related Issues for MICE Adam Dobbs Proton Accelerator Development Meeting, RAL 24 th March /03/20111A. Dobbs.
9 March 2005Edda Gschwendtner1 DAQ Terminology ISIS Terminology MICE Terminology Parameter Definitions.
MICE Target Electronics & DAQ Update P J Smith University of Sheffield 2 nd December 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
Target Test Report Given permission for a maximum of 5000 actuations. Performed 3679 actuations, 3654 with the gate valve open. Ran target at 0.4 Hz to.
Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Target Online Software J. Leaver 01/12/ /06/2015Imperial College 2 Target Controller Software Software for Stage 1 upgrade nearing completion –Hardware.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
ISIS Beam Protection System and MICE operation. Dean Adams 29 Nov 07 Presented by Chris Rogers.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
CMPB Alain Blondel 14 April STATUS OF MICE.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
14/1/20097 January 2009MICE CM23 - Harbin - Beamline Session1 MICE Beamloss Data Adam Dobbs.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
MICE MICE Target Mechanism CM38 – Napa Valley P J Smith on behalf of the MICE target team.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Target material and thickness considerations Alain Blondel, with thanks to Dean Adams and Dan Kaplan Priority for rebuild is to have a target mechanism.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
‘Dude where's my muon?’ Trigger Efficiency of the Single Station. Edward Overton 1.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Timing and synchronisation to ISIS RF Edward Overton 1.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
P. J. Smith on behalf of the MICE target team.
Modifications to the DRS4’s code
Luminosity Monitor Status
Muon Recording Studies and Progress for the MICE Tracker
Presentation transcript:

Doubling the Target Insertion Rate P J Smith for MICE VC 163

1) Motivation: ISIS At 4V of beam loss at the MICE target we are creating 10 V of loss in super period one which is the max measurement level of the system. We can further increase the muon rate by increasing the dip rate without saturating the super period 1 loss monitors. Note losses around the ring appear ~linear >1V loss so there is no loss advantage to be gained from running at lower losses. 2) Motivation: Tracker The dead time issue in the tracker. After a particle hits a detector there is some dead time, this means a second particle coming in after the first and within the dead time cannot be digitised. In the trackers the dead time is caused by the readout, an ADC has to cycle through a large number of channels and digitise each one, a process which takes 5.7us, during which any new particles are ignored. By reducing the rate of particles per spill, you increase the mean time between particles, meaning you get more digital muons per Vms beamloss. There was mention of resuming the work to shorten the dead time by modifying the AFE firmware. 12/12/20132

3) Motivation: MICE Doubling the running rate could increase the rate at which MICE can take data. Of course this requires that this can be demonstrated for the whole chain. Target, DAQ, Online reconstruction. This could have a positive impact upon the shift taking schedule. Consequently if we can prove that operating at 50/64 Hz is possible there is also a desire to do an activation study at a double insertion rate asap. 12/12/20133 Intention: We initially plan on running the target on ISIS at a double rate on Tuesday the 17 th December. The primary motivation is to prove that the target can be setup, synchronised and run with ISIS at the double rate. It will also give an opportunity to alter any target/beam-bump settings that are required to optimise the target’s operation.

Background: Target Target on ISIS (T2.9) has operated in R78 at ~0.83Hz for an extended period. Standard running in R78 is ~0.83 Hz with 49mm travel (20 mm BCD). Test T2.8 ran for 3.3 million actuations at this rate. T2.9 currently has ~0.5 million actuations on the clock. In principle there should be no problem with the target running on ISIS at a rate of 50/64 Hz. (0.78 Hz) It is just a case of changing internal delay timings on the target system to match the quicker trigger rate. The target will run hotter. In R78 it would typically sit at degrees C. It maybe slightly different in ISIS due to use of different chiller, longer length of pipes, etc. Target GUI warns if temperature exceeds 70 degrees C and switches the PSU off at 80 degrees C. The target will run at a reduced acceleration because it is running hotter -> Increased coil resistance reduces current. Voltage is kept constant to ensure we don’t get a thermal runaway. Level of effect is: Typical Target Acceleration (October ISIS) 33.2mm BCD~740 ms-2 Target Acceleration Deep Insertion 50/64 Hz R78 20mm BCD~690 ms-2 Worse Case is 7% difference. Typically much less. 12/12/20134

The different operating characteristics may require that the target operating parameters need optimising to prevent beam scraping on target insertion/extraction. This will likely need doing with the assistance of the beam-bump experts as the beam bump settings may also need optimising. Ed Overton has had a look at the Target BPS system to ascertain whether any parameters need changing to prevent accidental tripping. We believe that there is enough overhead in the BPS system that we shouldn’t be false tripping due to the increased operating rate. “I used the BPS code to generate a new set of working limits with a temperature range from 15-57C (instead of 15-75C) for all the actuations recorded on T29 since 14/7/13. I then checked that the recorded values for those actuations fell within the limits. The answer is that there were no new BPS 'errors/trips', indicating that we have a good ~18C of headroom on the BPS as stands.” 12/12/20135

Target GUI: The Target GUI software has been updated to give a faster update rate. We would like to deploy this before running the target at this faster rate. These tests don’t require the MICE DAQ and so can be done independently of the rest of MICE if necessary. MICE DAQ: Yordan does not believe that there will be any problems with the MICE DAQ being able to take data at the increased rate however it would be good to test this. It is not necessary to have the MICE DAQ functional to test the target and recalibrate the beam bump setup, however if it is possible to test the MICE DAQ at the same time then this is welcome. I don’t know if this can be done with the rest of the beam-line out of use? In either case firmly establishing that the target can operate at the increased rate is still desirable. 12/12/20136

Operational Constraints in the MICE Hall: We would like to do the target double dip rate test asap but the MICE hall is currently being occupied by the RF group for the TIARA testing. A muon beam line permit can be obtained without the PPS system – the RF crew do not need to use the PPS system to control access to the MICE hall during the TIARA testing. Running without the PPS has been approved in principle with John Thomason and Paul Wright but with a couple of caveats: Initial running needs to be with no-one in the hall – observe the rate monitor for change. A limit of 2 (or 4?) hours of running. Of course there will be no magnets. The RF group expects to be working until 19:00 hours in the evening. I understand that all the paperwork is now in place for a run between Monday 16 th and Wednesday 18 th December. 12/12/20137

Beyond the immediate test we need to determine when the ‘Activation Study’ can take place. If it is in February will this conflict with other work? 12/12/20138