February 21, 2012. General Information Utility staff is not aware of any mandate from city ordinance or state statute to provide water and sewer services.

Slides:



Advertisements
Similar presentations
Agreement between the Village of Owego and Inflection Energy.
Advertisements

Report to Council, November 3, Sewer User Rate Increase October 6, 2008 City council set a public hearing to consider adopting a resolution amending.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
SANITARY SEWER ACCESS POLICY, 2007 AN OVERVIEW CITY OF TUSCALOOSA SANITARY SEWER ACCESS POLICY, 2007 AN OVERVIEW.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Wastewater Fund. Wastewater Revenue $296,
BOARD OF COUNTY COMMISSIONERS DECEMBER 11, 2012 CELEBRATION POINTE COMMUNITY DEVELOPMENT DISTRICTS.
Public Hearing FY 2011 Budget 1. City Council Goals FY 2011 Flood Recovery and Protection –Identify Funding and Sources for Flood –Restore Affordable.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Photos by Susie Fitzhugh Building Excellence Presentation Community Engagement April 2012.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
1 Department Department of of Public Utilities Presentation of Study Results August 2006.
Utility Extension Project
Fairview Township, York County May 28, 2015
ORANGE COUNTY FY COUNTY MANAGER RECOMMENDED BUDGET 8/15/2015 ORANGE COUNTY BUDGET 1.
June 17, 2008 Fresno County Board of Supervisors First Public Hearing / First Reading of Ordinance Public Facilities Impact Fees and Capital Improvement.
Texas Constitution and Limited Government. State of Texas Constitution of 1876 Republicanism – a belief that government should be based on the consent.
2014 Budget Department Presentations Infrastructure Funding Options.
CITY OF MERIDIAN FY07 BUDGET HEARING Mayor – Tammy de Weerd Council President – Shaun Wardle Council Vice President – Joe Borton Council – Keith Bird Council.
How do local governments get their money and what is it used for?
Limited Proceedings Water & Wastewater Reference Manual1.
Old Corvallis Road Urban Renewal Program An Overview May 4 th, 2009.
TOWN OF TYNGSBOROUGH Article 6 Capital Exclusion Overview.
January 6,  INTRODUCTION  BACKGROUND  SUMMARY  QUESTIONS  SUPPLEMENTAL INFORMATION ◦ PROPOSED BUDGETS, LEVIES AND CIRCUIT BREAKER 2.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
Annexation Issues in Eden A History of Annexation in Eden Since 1968 NC Annexation History Current Annexation Issues in Eden January 2010.
Annexation 480 CHELSEA ROSE ANNEXATION PUBLIC INFORMATION MEETING AUGUST 11 TH, 2015.
January 6,  INTRODUCTION  OVERVIEW OF FUNDS  SUMMARY  QUESTIONS  SUPPLEMENTAL INFORMATION ◦ Background Information and Capital Projects ◦
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
What’s In Your Wallet? How Redevelopment Agencies Divert Millions From Public Safety Fire Chief Steve Foster, Cosumnes FD Business Officer John Ebner,
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
1 Construction Assessment Hearing May 23, 2001 Shawnee Middle School Cafeteria.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
Pasadena Water and Power Public Hearing Water Capital Improvement Charge Pasadena City Council Meeting January 11, 2016 Item #12.
FEBRUARY 22, 2016 FY 2017 County Administrator’s Recommended Budget.
Welcome Bexar County WCID #10 Informational Meeting.
BUDGET 101. Learning Objectives Better understand the budget process Become familiar with the roles of staff, the City Manager, and City Council.
City Council Meeting Presentations.  Part I – Regulations and Terminology May 17, 2011  Part II – Revenues June 7, 2011  Part III – Fund Descriptions.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
WELCOME OPEN HOUSE POSSIBLE ANNEXATION JULY 23, 2015 RECREATION CENTER AND NATATORIUM PEARLAND.
Division of Utilities and Solid Waste Management Pre-Construction and Benefit Assessments for Lake Linganore Board of County Commissioners Public Hearing.
True-Up Service Fee Adjustment with OMI/Thames January 10, 2006.
City of Twin Falls 2015 Fiscal Year City Manager’s Recommended Budget July 28, 2014.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
U TILITIES 2013 BUDGET OVERVIEW Electric Department – Fund 520 Water Department – Fund 525.
Texas Constitution and Limited Government
Fiscal Year 2017 Joint Hearing – Board of Selectmen and Advisory Board Budget Presentation Tuesday March 29, 2016.
Global Service Provider Buildings Energy Environment Transportation Water Water and Wastewater Rate Study Village of Villa Park, Illinois Presented to.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Lake Ashton and Lake Ashton II Community Development Districts CDD ORIENTATION CLASS February 28, 2011.
BUDGET PROCESS & REVENUE & EXPENSE INFORMATION For FISCAL YEAR 2011.
CSA 7 – Boulder Creek. YOUR SANITATION FACILITY Facility Includes the Following Five Pump Stations –Total of 10 pumps 16,553 feet of collection lines.
Jefferson County Planning Commissioners Hearing June 26, 2013
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
Land Use Urban Service Boundary is the framework for managing growth.
Fund Accounting Overview
City of Johnston East of Merle Hay Road Infrastructure Improvements
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Sewer User Rate Increase PUBLIC HEARING
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Vital services provided by LCU
City of Saginaw Curb Side Leaf Collection Update
City of Fernley City Council Meeting
FAQ on Local Government in Washington Township and the Town of Avon
SEWER DEPARTMENT BUDGET WORKSHOP
Presentation transcript:

February 21, 2012

General Information Utility staff is not aware of any mandate from city ordinance or state statute to provide water and sewer services following an annexation. During former annexations, citizens have been advised that water and sewer services might not be available. In the last twenty four years, no potential customers have been promised or led to believe that such services would be made available specifically because of annexation by Utility staff. Some Arkansas residents seem to confuse Texas statutes (which do provide services following annexations) with Arkansas rules and statutes. Almost all residents want sewer services but a great many are satisfied with their wells and do not want City water or solid waste services. Arkansas regulations from the Department of Health and the ADEQ mandate that certain standards be maintained where water and sanitary sewer services are provided. Texarkana, Arkansas ordinances require any structure within 300 feet of a water or sanitary sewer main to be connected.( Sec )

General Sewer Service Plan: Texarkana, Arkansas Long Term Plan - 20 to 30 years Very Expensive Current sewer system must be maintained Any plan is unlikely to please everyone Population density is the problem

Overall Cost Estimate Current Dollars

Cost Projection by Area Area II $23,598,750 Area III $19,575,300 Area IV $12,773,450 __________ $55,947,500 Average cost per structure to provide sewer service to these areas is $30,589. IV III II

How to Progress?? Any number of plans can be formulated but all will require a long period of time and hard choices. Annual projects can be adopted at budget time with new main extension projects funded through the Capital Improvement Fund and old infrastructure replaced through the Infrastructure Fund based on condition and growth. Expansion of the North Texarkana WWTP, construction of a new East WWTP and upgrade of the South Regional WWTP* may require bond issues. Connection and/or use of available sewer, water and solid waste services needs to be strictly enforced. Cooperation of Public Works, TWU and the City Attorney can put such a program in place.

How to progress? (continued) The Board of Directors may want to determine if pro rata connection to services will be a part of the program to extend services to their customers as currently provided by ordinance. The Board of Directors may want to decide if a low- interest loan, to be repaid monthly on the water bill, should be a part of the overall program to provide water and sewer services, especially to low income families who own the homes.

Current Projects for Consideration 1. Broadmoor/Pinson Area Sewer Rehabilitation 2. University of Arkansas Way/Clay Pit Road Sewer Extension. Part A and Part B 3. Clay Pit Road/East 50 th /East Broad Water Extension. Part A and Part B PLEASE NOTE: Utility staff does not necessarily recommend all of these projects. These three projects can be funded from the Capital Improvement and Infrastructure Funds in addition to the specific projects already listed in these funds. Engineering will be done by the TWU Engineering Division.

Broadmoor/Pinson Sewer Rehabilitation

Broadmoor/Pinson Cost Estimate Estimates are very conservative (worst case scenario) and bids may come in 5% to 20% less than shown for these projects. All projects would be bid and come back to the Board for final approval. This project could be designed, bid and returned to the Board for review by the first meeting in May. If approved, construction could begin in June and completed in four months.

University of Arkansas Way/ Clay Pit Road Sewer Extension Part A (Green) Part B (Green) Part A Estimate - $197,533 Four current potential customers Part B Estimate - $142,532 Six potential customers Total Project - $340,065

University of Arkansas Way and East Broad Water Extension Part A and Part B Part A Blue green Part B (Purple) A. Part A Estimate $55,000 B. Part B Estimate $48,950 Total Project $103,950 Note 1: Part A. will serve three customers for $55,000. Note2: Part B will complete another water loop for fire protection to the Fair Grounds and U of A as well as eliminates a dead end water main.

Locations Bearing Some Resemblance to the East 50 th Request for Water There are 12 locations that bear some resemblance to the East 50 th request for water, i. e. not served by a water main but within 300 feet of where a water main could be constructed. The cost to extend water mains to these twelve locations is estimated to be $120,375 plus customer costs of approximately $1000 per customer for meter taps and sets.

Residences Currently Not Connected to Water and Often Not Paying Solid Waste Two weeks ago,the Utility sent out letters to connect to water service within one year to 96 residents currently not connected to water service but who are within 300 feet of a water main per the current ordinance. There is some strong resistance to connect to water service and many of these individuals are not paying solid waste fees but their solid waste is being collected. Another 39 residences are currently vacant and not connected to available water service. Condemned buildings have been excluded.

Unusual Circumstances There are other circumstances under which residences are not known to be connected to water. 1. Residences within 300 feet of water main but “landlocked” by other property owners.(approximately 32) 2. Long side, major highway connections (24 known locations) These residents will receive a letter to connect unless the Board directs otherwise. This circumstance increases the cost from approximately $ plumber to $ plumber. 3. Residences more than 300 feet from water main (approximately 43). 4. Multiple residences connected to a single meter ( unknown number of locations) 5. Illegal connections (unknown number of locations)

Possible Actions 1. A consensus of the Board to proceed with design and bidding of the three projects or portions of these projects that the Board wishes returned to it for final consideration. 2. A consensus for the Utility to work with the City Attorney and Public Works Department to structure a program to notify and work with citizens to connect and/or use required water, sewer and solid waste services as per ordinance and to provide such a draft program to the City Manager. 3. A consensus to provide the City Manager’s office with a draft budget amendment for the Utility to fund an existing low interest loan fund for low income citizens. 4. A consensus of whether to implement a pro rata program as a part of providing water and sewer services..