(c) IRD 2002 Power System Restoration (Black Start) Black Start Panel Session IEEE PES Summer Meeting Chicago, Illinois July 23, 2002 M. M. Adibi IRD Corp.,

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Advertisements

POWER FACTOR IN ELECTRICAL ENERGY MANAGEMENT
RES-E Impact on Transmission Grid and Power System Reserves
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Electric Rates and Standby Charges Presented by: Cheryl Eakle – KPPC Jason Volz – Harshaw Trane August 13, 2014.
Combined Cycle Theory Dalton Plant Ouachita Plant.
Mechanical Engineering Department ME 322 Operation and Management of Power Plants Prof. Osama A El Masry Prof. Osama El Masry Load Curves.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
1 Logistics Measures and Considerations IEGR 459: Intro to Logistics Management and Supply Chain Sept. 19, 2011 Fall 2011 Maintainability System Effectiveness.
1 DISTRIBUTION SERVICE PROVIDER BLACK START TRAINING 2015.
The Integration of Renewable Energy onto the Existing Grid Dr Norman MacLeod Technical Director, HVDC.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
Active Power and Frequency Control
Inst. of Advanced Energy, Kyoto Univ. 1 Impact of Fusion Reactor on Electricity Grids Yasushi Yamamoto, Satoshi Konishi Institute of Advanced Energy, Kyoto.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
LINKS SURVIVAL POWER AUX POWER VOLTAGE LIMITS LINE CHARGE MVAR LINE
Distributed Power Systems ELCT 908
Plant Utility System (TKK-2210)
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
1 Training Session on Energy Equipment Electrical Systems Presentation to Energy Efficiency Guide for Industry in Asia Chapter 1 © UNEP GERIAP Electrical.
Texas Pipeline Association
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
 UK Power Networks. All rights reserved Demonstrating the benefits of energy storage on an 11 kV Distribution Network Matthieu Michel – Technology.
Tubas ELECTRICAL NETWORK STUDY Prepared by : Omar Abu-Omar Ahmad Nerat Sameed banifadel PRESENTATION TO: Dr.MAHER KHAMASH.
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
Estimados Expositores del II Seminario de Electricidad Consequences of increasing penetration of distributed generation on transmission and distribution.
Introduction to Electricity PART 1
Frankfurt (Germany), 6-9 June 2011 Presenter: Mahdi Kiaee Supervisors: Dr. Andrew Cruden and Professor David Infield The University of Strathclyde, Glasgow.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Lyndonville Electric Department Feasibility Analysis Review December 2,
Electricity Research Centre, University College Dublin Wind turbine modelling for grid code analysis Alan Mullane & Mark O’Malley Electricity Research.
Demand Response Products. Discussion Points 1.Setting the scene….. 2.Virtual Power Station 3.Reserves deployment order 4.Demand Response Products.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Overview What's is micro grid Over view of electric grid
1 August 14, 2003 Blackout MAC Meeting October 8, 2003 Paul Murphy IMO.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
AN- NAJAH NATIONAL UNIVERSITY OPTIMUM DESIGN AND PERFORMANCE FOR NABLUS NETWORK Submitted To : Dr. Maher Khammash Prepared By : Haitham Sharaf Ahmad Odeh.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
Renewables and System Services Ann Scully.
ERCOT Wind Survey Leo Villanueva. Abilene Mc Camey Big Spring.
SRLDC BANGALORE 20 th March This Presentation Covers … … … Definitions Emphasis of Black Start Restoration in IEGC Causes of Blackouts Restoration.
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
MIGRATING TOWARDS A SMART DISTRIBUTION GRID Authors: Prashanth DUVOOR Ulrike SACHS Satish NATTI Siemens PTI.
Steady State Analysis Of A Microgrid Connected To A Power System
PRACTICAL ELECTRICAL ENGINEERING BASICS
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
Variable Load on Power Stations
FRCC System Restoration 2016 FRCC System Operator Seminar.
Application & Design Introduction for Forced Circulation Steam Generators and Electric Boilers.
SLIDE 1 VICTORIA REGION RESTART July 2013 PRESENTED BY PETER BIDDLE.
1 8. OPERATING, REACTIVE AND BLACK START RESERVES Asko Vuorinen.
SLIDE 1 SOUTH AUSTRALIA REGION RESTART July 2013 PRESENTED BY PETER BIDDLE.
SLIDE 1 SRAS REVIEW QUEENSLAND REGION July 2013 PRESENTED BY PETER BIDDLE.
SLIDE 1 SRAS REVIEW TASMANIA REGION July 2013 PRESENTED BY PETER BIDDLE.
Presented By : SONU DEEP ELECTRICAL ENGINEERING.
SEMINAR ON ISLANDING BY PAWAN. What is islanding? Normally all Power generators are interconnected to form a network called ‘GRID’. Some times it so happens.
SLIDE 1 SRAS REVIEW NEW SOUTH WALES REGION July 2013 PRESENTED BY PETER BIDDLE.
POWER FACTOR CORRECTION
Economic Operation of Power Systems
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Energy storage in Renewable Energy
Solar City: Effect of Solar Technologies on Network Performance
DEC System Voltage Planning - June 2018
Tubas ELECTRICAL NETWORK STUDY
Components inverters Except where otherwise noted these materials are licensed Creative Commons Attribution 4.0 (CC BY)
Presentation transcript:

(c) IRD 2002 Power System Restoration (Black Start) Black Start Panel Session IEEE PES Summer Meeting Chicago, Illinois July 23, 2002 M. M. Adibi IRD Corp., P.O. Box Bethesda, MD

(c) IRD 2002 Pre-disturbance Conditions Peak load, low voltage, large network loads Light load, high voltage, no cycling units Long weekends (Labor Day) Scheduled maintenance

(c) IRD 2002 Post-disturbance Status Complete collapse with no interconnection assistance Partial collapse with interconnection assistance Power system beak-up (System Islands)

(c) IRD 2002 The Three Restoration Stages Preparation stage, actions are time critical (1-2 hours) System integration, achieving post- restoration target system (3-4 hours) Load restoration, minimizing MWH (8-10 hours)

(c) IRD 2002 Initial Sources of Power Combustion Turbines, Start-up in 5-15 min., probability of success 30 –50%, limited under-excitation, use low voltage links Run-of-the-River Hydro, Pumped- Storage, Start-up 5-10 min., probability of success is high, can use HV links

(c) IRD 2002 Once-through Units with full-load rejection, probability of success 20-80%, maximum elapsed time to min. loading 30 minutes, coordinated loading problem to min. gen. Low Frequency Isolation Scheme (LFIS) and Controlled Islanding, probability of success is low. Initial Sources of Power (cont.)

(c) IRD 2002 Initial Critical Loads Cranking drum-type units, high priority Pipe-type cable pumping plants, high priority Transmission and distribution stations, high to medium priority depending on locations Industrial load, medium to low priority

(c) IRD 2002 Black Start Steam Electric Units (Drum Type Boilers) Are base load units, supply large portions of demand Max. elapsed time for hot re-start is minutes Min. elapsed time for cold start-up is 3-4 hours Are remote from the load centers Need cranking power 5-7% of their ratings Min. generation 25 to 30 %

(c) IRD 2002 One-Line diagram of a SE Unit GSU XFMR SE Gen. AUX XFMR Standby XFMR GSU Taps (5 no-load) AUX Taps (5 no-load) Standby Taps (5 on-load) System Bus (345 kV) Large Induction Motors (350 to 6000 Horse Power) AUX Load Bus (4.16 kV) AUX Load Bus (4.16 V) Generator Bus (18.0 kV) Generator: Max 185 MW Min 90 MW Normally Open

(c) IRD 2002 Combustion Turbine Units (cranking source) Are peaking units, supply daily peak load Cold start up within 5 – 10 minutes Possibility of successful start up is 1 in 3 Are close to the load centers Need small local cranking for start ups Hot restart within 2 – 3 hours

(c) IRD 2002 One-Line diagram of the CT Unit GSU XFMR CT Gen AUX XFMR Local XFMR GSU Taps (6 no-load) AUX Taps (5 no-load) XFMR Taps (5 on-load) System Bus (115 kV) Local Load (7.5 MW) AUX Load (150 kW) Local Load Bus (34.5 kV) AUX Load Bus (480 V) Generator Bus (13.8 kV) Twin Generators (42 MVA, 85% PF)

(c) IRD 2002 A Typical Black Start System

(c) IRD 2002 Cumulative Starting & Running Auxiliaries

(c) IRD 2002 Conclusions Characteristics of steam units dictate parallel start ups (45 to 60 minutes) SE units should be individually matched with black start CT units Systems are sectionalized into subsystems, each at least having one SES & one CTS Cranking operation uses generation, transmission and distribution facilities

(c) IRD 2002 Recommendations CT units should be able to absorb line & cable charging currents CT units should be able to supply reactive power required for the start ups of large induction motors Each black start operation should be planned, analyzed/simulated, field tested and then operators trained and exercised in its implementations