WG 2/3 Splinter meeting Dec. 6, 2010 ESOC Darmstadt for WG2 & WG3: D. Bockelée-Morvan C. Engrand E. Grün H. Krueger.

Slides:



Advertisements
Similar presentations
June 26, 2002; Page: 1 ESOC (TOS-OGR) European Space Operations Centre Manfred Warhaut Ground Segment Manager TOS-OGR ROSETTA Ground Segment.
Advertisements

Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.
POD/Geoid splinter March 14, 2007 J.P. Berthias Ocean Topography Science Team Meeting - Hobart, Australia – March 2007.
Philae Science Team Meeting Venice, 30 Mar. – 1 Apr Rita Schulz - Rosetta - Mission Status.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
Valeriy Tenishev, Dmitriy Borovikov, Nicolas Fougere, Yuni Lee, Michael R. Combi, Tamas Gombosi, Martin Rubin.
Minor bodies observation from Earth and space: asteroid (2867)Steins A. Coradini, M.T. Capria, F. Capaccioni, and the VIRTIS International Team.
PHILAE Science Team, Venice LTS phase: the LS standpoint prepared by HBO LTS phase: from end of FSS (mid Nov. 2014) to end of Rosetta mission (31.
USGS Realignment, Science Planning, and FY 2012 Budget Matthew C. Larsen Associate Director Climate and Land Use Change U.S. Department of the Interior.
Mission Operations in Small Satellite Projects Making Mission Operations Effective J. Burkert Colorado Space Grant Consortium.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
The flight dynamics standpoint Alejandro Blazquez (CNES)‏ LSWT Venice, 30/03-01/04/2009.
WGClimate Work Plan for John Bates, Chair WGClimate 4th Working Group on Climate Meeting.
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
CEOS-CGMS Working Group on Climate John Bates, NOAA SIT-30 Agenda Item #11 Climate Monitoring, Research, and Services 30 th CEOS SIT Meeting CNES Headquarters,
Solar Orbiter. Contents The mission The mission The orbit The orbit The instruments The instruments VIM: Visible-light Imager and Magnetograph VIM: Visible-light.
28 th CEOS Plenary Session John Bates NOAA CEOS Plenary, Agenda Item 13 Tromsø, Norway October 2014.
Solar System Missions Division Solar Orbiter Next major Solar and Heliospheric mission ESA ILWS flagship Now with the Inner Heliospheric Sentinels.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
CEOS VC/WG working day – Report on the integrated ocean surface products discussion Julia Figa-Saldaña, Hans Bonekamp EUMETSAT SIT Workshop Agenda Item.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Deep Impact Continued Investigations (DI3) Tony Farnham.
Bone Trajectories and Model Simulations Kathleen Mandt, Ray Goldstein, Christoph Koenders May 29, 2013 IES Team Meeting – San Antonio.
PHILAE Science Team, Venice Philae On-Comet Science Objectives prepared by HBO Document name = Scientific Objectives of the PHILAE Mission (RO-LAN-LI-1000),
Southend Together Secretariat 21 st February Developing Southend Together’s Sustainable Community Strategy
GLAST Science Support Center June 21, 2007 Getting Involved with GLAST GLAST Guest Investigator Program David Band, GSSC CRESST/GSFC/UMBC.
1 Transiting Exoplanet Survey Satellite Daryl Swade Archive Team Meeting June 16, 2014.
Dokumentname > Dokumentname > B Recent Results of Comet Activity Modeling as input for RPC Plasma Simulations Recent Results of Comet.
Paul Alexander 2 nd SKADS Workshop October 2007 SKA and SKADS Costing The Future Paul Alexander Andrew Faulkner, Rosie Bolton.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC
1/106 December 2001Rosetta SOWG Status of the Rosetta Project TestBed (PTB) P. van der Plas Modelling and Simulation Section ESA/ESTEC ESA/Estec 6 December.
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
Background  EM16 SGS+TEC met with FD 1 year ago  Both sides agreed that there was a “performance gap:  SGS prepared a TN with 2 main options to bridge.
Dean C. Hines Space Telescope Science Institute Precision Imaging Polarimetry with ACS.
Second GOES Users Conference, Boulder October 1-3, Issue B Page 1 ACTIVITIES TOWARDS USER REQUIREMENTS FOR POST-MSG by R. Stuhlmann GOES Users.
The International Ocean Colour Coordinating Group International Network for Sensor Inter- comparison and Uncertainty assessment for Ocean Color Radiometry.
Workshop proposal to the Science Committee Solar Wind – Comet Surface Interaction.
Mark Beckman NASA/GSFC Code 595 August 16-17, 2005
Mission Planning Concepts
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
The road to the first E2E tests
Rosetta Science Working Team Meeting #26 Working Group #1
19 May 2010, ESOC Eberhard Grün and Harald Krüger
RSOC Overview at SWT #26, 11/12 June 2009
OSIRIS Solar System Simulator
OSIRIS operation summary
ROSETTA SWT 27th ESOC, 2-4 December 2009
Max-Planck-Institut für Sonnensystemforschung
WG1 Report Osiris Lander delivery Support and Science activities during Comet approach.
Pre-landing Orbiter Observations
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Defining the Preferred case
Rosetta Science Ground Segment Overview
Summary of the science planned per mission phase
OSIRIS operation summary
Mars Swingby (MSB) information
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
OSIRIS Full Team Meeting
WG – Chemistry – mineralogy elemental
The RSP Archive System RSP Archive Concept Review 28 September 2017
Philae status 21st Rosetta Science Team meeting
Flight Dynamics Michael Mesarch Frank Vaughn Marco Concha 08/19/99
The GEO AquaWatch Initiative CEOS “Freshwater from Space” Workshop
Workshop on Gap Analysis and Prioritization
Recent activities of the OSVW-VC
Titan Flyby Altitude – Tour Updates Upcoming Observations in 2006
Presentation transcript:

WG 2/3 Splinter meeting Dec. 6, 2010 ESOC Darmstadt for WG2 & WG3: D. Bockelée-Morvan C. Engrand E. Grün H. Krueger

Agenda Presentation by Liaison Scientists from ESAC (NA, MK, CV) of Preliminary Skeleton Science Operations Plan –Phase A.1 : First 30 days after lander delivery Presentation by WG3 Chair (EG) : Tentative Primary Science Goals –First 30 days after lander delivery –Pre-escort phase Presentation of GD PST (Performance Simulation Tool) (Elena Mazzotta-Epifani) Splinter meeting : in situ / remote sensing instruments Action Items Open questions

SRE-OS Rosetta SWT #29, ESOC, 6 December 2010 Introduction (Presentation by ESAC Liaison Scientists NA, MK, CV) Project Scientist Recommendation (SWT #28): 1.Science Planning of comet phase should result from combined WGs and SGS efforts 2.Parallel activities were foreseen: Development of Science Planning System to implement, schedule, adapt, optimize and book-keeping of the skeleton plan (responsibility of development team in ESAC, ‘team visits’ last Summer/Fall were related to this activity) Feasibility Study of Science Objectives within realistic Science Operations assumptions : skeleton plan (responsibility of Working Groups/Liaison Scientists)

SRE-OS Rosetta SWT #29, ESOC, 6 December 2010 Demonstrate feasibility of Instrument/Mission Science Objectives within realistic operations assumptions Identify early the resource ‘Bottlenecks’ Understand if and when prioritization is unavoidable Exercise ourselves with some (high-level) science planning Rosetta (early) Comet Phase: Toward a Skeleton Plan (Presentation by ESAC Liaison Scientists NA, MK, CV) => one possible solution… => Future planning system will propose optimized solution(s) (resource minimization by proper scheduling)…

SRE-OS Rosetta SWT #29, ESOC, 6 December 2010 Operational Assumptions TWO MAIN PHASES FOR THE WHOLE MISSION : Phase A: a ‘pseudo-bound’ non-Keplerian orbit Nearly Terminator with stepwise radius increment ~ 30 days from 20 km to 50 km [A.1, A.2, A.3, A.4] (From Mid November 2014 till ~ end of March 2015, 2.9 AU to 2 AU) Phase B: Series of ‘flybys’ (~15) and Parking positions (April 2015 until end of mission) SWT29: SKELETON PLAN FOR PHASE A.1 : 30 DAYS November 15, December 15, 2014, Rh = AU Nearly Terminator orbit with radius 20 Km, S/C orbital period 8 days, => ~ 52 nucleus rotations over whole phase A.1 (Comet spin period 12.7 h) Resources One antenna pass per day (35 m New Norcia, ~ 2GB total DV for 30 days) Power : 460 W (RO-SGS-TN-0029 ‘Comet Phase Resources’)

SRE-OS Rosetta SWT #29, ESOC, 6 December 2010 General Assumptions on Planning of Observations ALL INSTRUMENTS SHOULD GET DURING THESE 30 DAYS OPPORTUNITY FOR THEIR HIGHEST PRIORITY SCIENCE The skeleton plan must use only a fraction of total DV (~ 80% ? ) Justification : leave margin for planning system to handle short term scheduling of ‘Target of Interest’ Pointing: defined by remote-sensing obs, with in-situ instruments co-riders Justification : remote-sensing request most constraining BUT will stay most of the time within 6 deg to Nadir NOTE: in-situ instruments can also define pointing on specific requests (dust ram,…) In-situ instruments are ON all the time Justification : flux derivations and high-sensitivity to temporal variability

Phase A.1 - Science Goals provisionnally included in Skeleton Plan Global nucleus maps at highest possible resolution for comparisons with later observation (SR, MR, VR, AL) Nucleus interior structure (CN) Characterize the nucleus environment (coma, dust, plasma properties) (VR, MR, AL, RPC, GD) In situ analysis of cometary material (CS, GD, MD, RN) Connect Orbiter Observations to Lander measurements (e.g. Philae landmark) (complementary instr. TBD) Identify & study active areas and specific landmarks (Most instruments) Allow for the unexpected… Adapted from WG3 presentation

Example of segmentation of orbit (LS – PIs): in progress (example of first 2 orbits)  To be checked and completed in agreement w/ PIs (e.g. repartition of resources to be checked and discussed, RSI to be implemented…)  Resource bottlenecks w/ only ONE Antenna : Data Volume (DV)  Operational bottleneck : CN cannot operate w/ all monitoring instruments (GD, RN, RPC)

Conclusions of joint WG2/3 and in situ/remote sensing splinter meetings Skeleton Plan for Terminator Orbit Phase A1 : –List of observations still incomplete. Examples : RSI missing (need Earth based station), calibration observations (Remote Sensing instruments)… –Resource requirements to be completed for each individual observation. –link observation to science (Science Themes, Science Objectives, Detailed Science Objectives). Terminator orbit is not optimum for several Science Objectives (nucleus mapping, in situ dust and gas characterization…) Study resources needed and science objectives for : –a circular non-Terminator orbit rotated ~ 30 deg. around North pole –a close fly-by  Feasibility study from FD needed! Request for pre-escort science (if allowed by Lander safety) –Examples : SR (distant observations of big particles environment), RPC, RN (solar wind comet interface), CS & MD (dust collection and analysis)

Action Items Pre-Escort phase: Observation requests with Science Objectives and measurement details to be provided by PI teams to WG2/3 & WG1 Chairs and LS Phase A.1: Observation requests with Science Objectives and measurement details to be provided by PI teams to WG2/3 Chairs and LS for : –Terminator orbit (in progress) –Precessed orbit by ~ 30° –Flyby trajectory  Interaction WG – LS to optimize science and sequence of operation  Input from FD needed

Open questions Organisation LS - WG2/3? –Now : implementation of operation sequence design by direct interaction between LS and PI teams –Later : use of planning system (SGS) => when&how to incorporate science? Science prioritization ? (DV bottlenecks) –Needed? (additional antenna requests?) –How to do it? Definition of the role of WG 2&3 in the future? –Coordination of science during operation sequence Input from FD needed!