CERN Converter Control Electronics Strategy for LHC Machine Electronics : Limitations & Risks

Slides:



Advertisements
Similar presentations
Chapter 27 Software Change.
Advertisements

ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Developed by Reneta Barneva, SUNY Fredonia
MIS 2000 Class 20 System Development Process Updated 2014.
Software Modeling SWE5441 Lecture 3 Eng. Mohammed Timraz
Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
, a rad-tol FPGA-based WorldFIP agent E. Gousiou, P.Alvarez, E.van der Bij, G.Penacoba, J. Serrano | CERN TWEPP 2011 nan FIP.
1 / 24 CS 425/625 Software Engineering Software Evolution Based on Chapter 21 of the textbook [SE-8] Ian Sommerville, Software Engineering, 8 th Ed., Addison-Wesley,
Software Evolution Managing the processes of software system change
Dr Kettani, Spring 2002 Software Engineering IIFrom Sommerville, 6th edition Software change l Managing the processes of software system change.
Modified from Sommerville’s originalsSoftware Engineering, 7th edition. Chapter 21 Slide 1 Software evolution.
Software evolution.
Predictive Maintenance: Condition monitoring Tools and Systems for asset management September 19, 2007.
Innovation in operations and processes Lesson 6 Chapter 8 + slides.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
WorldFIP optical repeaters 1 | status Feb 2013: 66 repeaters ordered to HLP; never delivered Feb 2014: HLP announced eminent closure Jun 2014: 40 of the.
©Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 27Slide 1 Chapter 27 Software Change.
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
SCADA and Telemetry Presented By:.
System Development Life Cycle
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
SPS Beam Position Monitors: MOPOS Front-End Electronics Jose Luis Gonzalez BE/BI 22/11/2013.
Software evolution. Objectives l To explain why change is inevitable if software systems are to remain useful l To discuss software maintenance and maintenance.
Software change  Managing the processes of software system change.
Topic (1)Software Engineering (601321)1 Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution.
©Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 27Slide 1 Software change l Managing the processes of software system change.
SOURCING MODELS: WHAT AND WHEN TO OUTSOURCE/OFFSHORE IS SOURCING UNIT 2 1.
B. Todd et al. 25 th August 2009 Observations Since v1.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
1 LHC Project Seminar - 06/05/99Raymond RAUSCH - SLRAD-WG Radiation Tests on Electronics for the LHC Machine u Presentation - Objectives of the Radiation.
Lecture 14 Maintaining the System and Managing Software Change SFDV Principles of Information Systems.
NanoFIP Progress Report Eva. Gousiou BE/CO-HT & the nanoFIP team RadWG 23Nov11.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 21 Slide 1 Software evolution 1.
Software Evolution Program evolution dynamics Software maintenance Complexity and Process metrics Evolution processes 1.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
The FGClite Project Status Update and Requirements R2E Extended Project meeting TE-EPC-CC R2E Team.
Chapter 2: Software Maintenance Omar Meqdadi SE 3860 Lecture 2 Department of Computer Science and Software Engineering University of Wisconsin-Platteville.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 21 Slide 1 Software evolution.
Chapter 9 – Software Evolution 1Chapter 9 Software evolution.
CERN Converter Control Electronics Setting the Scene
Goal: in view of LS2/LS3/HL-LHC – evaluate possible life-time constraints in IR3/7 radiation levels equipment damage and respective lifetime considerations.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
WorldFIP Infrastructure E.Gousou | BE-CO |15 Oct 2014 | R2E | Maintenance | Availability.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
CERN Availability Working Group & Accelerator Fault Tracker Availability Working Group & Accelerator Fault Tracker - Where do we.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 21 Slide 1 Software evolution.
Software change Software change is inevitable –New requirements emerge when the software is used –The business environment changes –Errors must be repaired.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
1 Radiation worries in the cavern L.Jirdén
Monitoring and Diagnostics infrastructure & SW for LHC QPS WorldFIP first analysis Michel Arruat, Frank Locci, Julien Palluel BE/CO1.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
RADWG Meeting April 2015 Salvatore Danzeca EN/STI/ECE.
Computer Systems Architecture Edited by Original lecture by Ian Sunley Areas: Computer users Basic topics What is a computer?
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
B. Todd, A. Apollonio, S. Gabourin, S. Uznanski Principles and Experience in the 1v2 Design & Operation of Dependable Systems.
Mar 26, 2014 FGClite Power Control TE-EPC-CCE.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
13 th September 2012 – 0v6 Radiation Tolerant Power Converter Controls thanks to: TE/EPC/CC, Y. Thurel, A. Masi, M. Brugger, G. Spiezia.
JTAG feature nan FIP Stephen Page TE/EPC-CC
CONS and HL-LHC day Analysis of needs from BE-CO
nan FIP The project April Eva. Gousiou BE/CO-HT
R2E impact of TCL settings: input for 2017 operation
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
6th WorldFIP Insourcing Meeting
CS 425/625 Software Engineering Software Evolution
Chapter 27 Software Change.
Radiation Working Group RADWG
Presentation transcript:

CERN Converter Control Electronics Strategy for LHC Machine Electronics : Limitations & Risks

CERN Converter Control Electronics Introduction 3 I am assuming that HL-LHC engineering implies all topics are open to discussion. This talk focusses on observations about our machine electronics strategy questions arise which need to be answered for the HL-LHC… ….this talk does not attempt to provide answers!

CERN Converter Control Electronics WorldFIP

CERN Converter Control Electronics Machine Control System 5 Industrial Computer Custom Hardware

CERN Converter Control Electronics What this means… 6 optical fibre cable “WorldFIP” is a combination of field-bus related parts

CERN Converter Control Electronics Re-engineering the fieldbus 7 BE/CO insourcing of Alstom industrial Products WorldFIP  cernFIP nanoFIPslave IP core [2012] goFIP repeater [2014] masterFIP [2015] approach is to re-engineer parts as they become obsolete ALSTOM repeater – sources owned… nanoFIPdiag – sources owned… E. Gousiou [BE/CO]

CERN Converter Control Electronics Bandwidth and Impact 8 no access needed to repair Commercial solution very high performance access to repair commercial solution considerable performance significant intelligence in the custom hardware Severe bandwidth limitation! BE/CO  best case is only doubling to 5Mbps using worldFIP/cernFIP means complex electronics will always be next to the machine

CERN Converter Control Electronics Radiation Level Predictions

CERN Converter Control Electronics Surface Buildings machine electronics are installed in one of five areas with machine radiation risks: none Perpendicular galleriesnone - low Parallel gallerieslow Alcovesmedium - high LHC Tunnel high 10

CERN Converter Control Electronics In the Tunnel - FGClite If HL-LHC radiation levels are below predictions the correct strategy depends on the predicted radiation level 11 Dispersion Suppressor = 5% Arc = 60% (+10) <1 2   32 Dose per Year [Gy] <1 <6 <4 ≈18 <9 ≈42 ≈30-50 ≈ Cumulative Dose [Gy] OK low end of predictionrotate 10% every LS high end of predictionrotate 10% every year, 20% spares above predictionsno solution Cumulative Dose 150Gy = limit for FPGA reprogramming

CERN Converter Control Electronics Single-Source COTS in Radiation

CERN Converter Control Electronics The FGClite FGClite – S. Uznanski et al. Processing Data Storage Analogue Digital Differential Current Loop Onewire Input/Output Field-Bus 13 WorldFIP / cernFIP

CERN Converter Control Electronics COTS Processing Analogue Actel ProASIC 3 FPGA Texas Instruments ADCs These exact same parts are used in a lot of systems (QPS, RadMON, FGC…) some commercial parts are single-source solutions for electronics in radiation the Actel proASIC3 FPGA is the only viable solution for FPGAs in radiation 14 Above 150GY the FPGA cannot be re-programmed Alstom FielDrive & FieldTR Field-Bus the Alstom circuits are the only viable solution for the fieldbus electrical level the Texas ADCs are the only solution for ADCs in several systems

CERN Converter Control Electronics PH/ESE Solutions for Machine Electronics

CERN Converter Control Electronics Recipe for Electronic Systems processing data storage analogue digital differential current loop onewire Input/Output almost every machine electronic system I have seen at CERN… Configuration Program Variables µC / µP FPGA / CPLD DSP powering 16

CERN Converter Control Electronics Recipe for Electronic Systems powering A very interesting example … when EPC/CCE began FGClite we spent a lot of time and effort qualifying regulators… initially settled on the MIC37302 Criticality + Testing + Long-Term Availability + Batch Variation + Process Variation + … = very high risk to our product Turned out to be justified, unusual failure mode observed in radiation  this part is not suitable for FGClite. 17 around one year, several radiation campaigns.

CERN Converter Control Electronics Recipe for Electronic Systems powering A very interesting example … We finally chose LHC4913PDU Designed by PH/ESE  in the CERN stores SCEM Criticality + Testing + Long-Term Availability + Batch Variation + Process Variation + … = risk minimised cost for risk mitigation… MIC37302 = 3 CHF  LHC4913PDU = 16 CHF 18 x6000 = 80kCHF PH/ESE solutions/approaches applied to machine electronics can give significant risk reduction

CERN Converter Control Electronics Organisational Strategy

CERN Converter Control Electronics A Very Personal Opinion 20 I would argue: We all have more to do with less …. * under-resourcing eventually means we need to be organised differenty * Knowledge management is becoming critical Maintenance must be easy to do, despite the changing workforce * Having fewer, common, more simple front-end electronic units would help in several ways * Electronics projects traversing the organisation An example which works extremely well – ex. TS/DEM “Outsourcing” electronics implementation and production to a centralised team of experts Coordinated by leaders within each equipment group/section Fewer staff, more students, more fellows, less long-term presence In addition, skill needs are evolving * Skill level needed in each electronics domain means one person can no longer master the whole common approaches are becoming strategically important

CERN Converter Control Electronics Fundamental Questions for (HL-)LHC

CERN Converter Control Electronics Observations  Questions using worldFIP means complex electronics will always be next to the machine 3. some critical COTS components in radiation are single source 2. machine electronics strategy has a high sensitivity to radiation predictions 4. PH/ESE solutions / approaches applied to machine electronics can give significant risk reduction What does this mean for critical systems? Arguably risk varies from negligible to severe each shared COTS part presents a risk, the sum of these risks should not be ignored Session 1? what should we do to address this? Profit from this knowledge and help knowledge transfer? What does that mean for the infrastructure? 5. Common approaches are becoming strategically important

CERN Converter Control Electronics Asking a Fundamental Question…

CERN Converter Control Electronics FGClite – Hypothetical Evolutions 24 I asked S. Uznanski what would FGClite have looked like if we had no initial constraints FGC2 FGClite

CERN Converter Control Electronics FGClite – Hypothetical Evolutions 25 analogue digital differential current loop onewire Input / Output almost every machine electronic system I have seen at CERN…