LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.

Slides:



Advertisements
Similar presentations
Software change management
Advertisements

7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
July 2010 D2.1 Upgrading strategy Javier Soto Catalog Release 3. Communities.
ITIL: Service Transition
Your Project Proposal.
SE 555 Software Requirements & Specification Requirements Management.
CS Integration Management (Part 6) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent University,
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Configuration Management
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
ShelterPoint™ Data-Entry Workflows. ShelterPoint v5.2.3.
Using Task Manager to Work EDI/ERA Posting Lori Phillips CHUG at Centricity Live April 29 – May 2,2015.
This chapter is extracted from Sommerville’s slides. Text book chapter
Overview of Mini-Edit and other Tools Access DB Oracle DB You Need to Send Entries From Your Std To the Registry You Need to Get Back Updated Entries From.
Software Engineering Modern Approaches
Managing the development and purchase of information systems (Part 1)
360 Panoramic Photographs Capture, Processing, Layout Database T. Birtwistle EN-MEF-DC.
Mail merge I: Use mail merge for mass mailings Perform a complete mail merge Now you’ll walk through the process of performing a mail merge by using the.
Requirements Verification & Validation Requirements Engineering & Project Management.
Configuration Management (CM)
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
1 ADVANCED MICROSOFT WORD Lesson 14 – Editing in Workgroups Microsoft Office 2003: Advanced.
© Mahindra Satyam 2009 Configuration Management QMS Training.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
Copyright © 2006 Pilothouse Consulting Inc. All rights reserved. Office Server Specific Web content management –Page structure, layouts, and controls –Publishing.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
Topic 5 Initiating a project
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
Configuration Management
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
University Retention Schedule Training. Introduction to the University Retention Schedule.
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
Collaborate. Coordinate. Evaluate. Connecting Communities > Demonstrating Outcomes ™ / I&R Housing Youth & Family Services Older Adult Services ShelterPoint™
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Project management Topic 8 Configuration Management.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Database - How to keep BI information up to date? Samy Chemli on behalf of EN-MEF-DC.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
JIRA in BE-CO for Exploitation Marine BI Seminar 20 November
Project Codes/Coding Pierre Bonnal Project Codes/Coding — P. Bonnal2 Three to tango Agenda “as-is” “should-be” “to-be”
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Perform a complete mail merge Lesson 14 By the end of this lesson you will be able to complete the following: Use the Mail Merge Wizard to perform a basic.
Introduction to the Change Process
Software Configuration Management
Software Configuration Management
Software Project Configuration Management
Equipment simplified model SMR UR safety
Testing Process Roman Yagodka ISS Test Leader.
Configuration Management and Layout Database ELENA Project
LINAC4 50 MeV phase BIS STATUS
Unifying for all accelerators and projects
The COSMO Coding Standards Some Highlights
Template for methodological application
HL-LHC Quality management
Presentation transcript:

LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014 Thomas Birtwistle EN-MEF-DC

Content Documentation in EDMS Layout Database Engineering Change Requests (ECRs) T. Birtwistle EN-MEF-DC

Content Documentation in EDMS Layout Database Engineering Change Requests (ECRs) T. Birtwistle EN-MEF-DC

Documentation in EDMS Pilot project in LIU-PSB for documentation handling. In the past, project documents have used a specific code prefix like PBU, PSU, SPU. All references should use the machine code; PS, PSB, SPS, as project documents will be relevant to the machine in the future. Example: PSB-T-ES-0001 Dual codes for existing files (PBU and PSB) to match file references, and for accurate EDMS searches. EDMS ‘release procedures’ reviewed and modified to match standard procedures for existing hardware baselines… T. Birtwistle EN-MEF-DC

LIU-PSB Pilot Project Documentation Project structures available with access rights for all project members (already in place). Hardware baseline is a long term ‘archive’ for documentation relevant to a machine. It has been then split into current machine nodes and LIU nodes. If an LIU document is considered ‘long term’ (i.e. it is still applicable after the project finishes), it will be stored in the appropriate LIU Hardware Baseline Node. For LIU-PSB we have a dedicated person from the management team for this. These nodes are the same T. Birtwistle EN-MEF-DC

Each project member can create their own documents as normal: Create a document in the appropriate EDMS node of the LIU Project structure LIU-PSB Pilot Project Documentation Select the correct document type from the list T. Birtwistle EN-MEF-DC

LIU-PSB Pilot Project Documentation 0.1 The first version should always be 0.1 (not the default value!) Future draft versions: 0.2, 0.3, 0.4 etc. First released version: 1.0 See A&T Seminar from P. Bonnal on 15 th May 2014 – Indico Select an appropriate equipment code. If a suitable code doesn’t exist, cancel the registration and contact: All equipment codes are stored herehere T. Birtwistle EN-MEF-DC

LIU-PSB Pilot Project Documentation Each project member can create their own documents as normal: Create a document in the appropriate EDMS node of the LIU Project structure Project members can put documents through an ‘engineering check’ process T. Birtwistle EN-MEF-DC In order to add any comments into the document file, following the engineering check, a new version should be created, taking note of the versioning rules described previously… Cancel the current version, then click ‘New Version’

LIU-PSB Pilot Project Documentation Each project member can create their own documents as normal: Create a document in the appropriate EDMS node of the LIU Project structure Project members can put documents through an ‘engineering check’ process All long term documents (e.g. engineering specifications, reports etc.) must undergo a formal approval (‘under approval’) before ‘release’. The approval process is handled by a restricted group. First point of contact is the project document handler, then Configuration Management (EN-MEF-DC). T. Birtwistle EN-MEF-DC

Project Documentation There is a contact point in the LIU-PSB project management team for documentation handling. For the other projects, the discussion is open Beneficial to have a person from the project as the first point of contact, as they can better understand which documents are long- term/short-term. The Configuration Management (MEF-DC) team could also handle these documents. T. Birtwistle EN-MEF-DC

Content Documentation in EDMS Layout Database Engineering Change Requests (ECRs) T. Birtwistle EN-MEF-DC

Layout Database (LIU-PSB) The current machines and transfer lines are available in the layout database: A parallel study version for the future PSB and transfer lines (and also HL-LHC) is being developed (BE-CO), and will be available ~end November. Data entry is planned to be completed for LIU-PSB ~end January At the moment it is foreseen only to contain the main optics information in the future study version More detailed information could be added as the project develops. See next slide T. Birtwistle EN-MEF-DC

Layout Database Versioning (LIU-PSB) Current machine versionDate2GeV ‘upgraded’ machine version Situation after the upgrade Post LS1 After Technical Stop 2014 LS2 Changes ECRs! Upgrade Complete Optics Changes Design Changes Project Changes Final change will come from only one side T. Birtwistle EN-MEF-DC

Other Projects – PS, SPS, Ions(?) T. Birtwistle EN-MEF-DC14 Need to analyse the need for parallel database versioning for the other projects (PS, SPS) Depends on the complexity and number of foreseen changes. Project management team offline decision (discussion with MEF-DC). Ions scope - the required machines/lines (if any) for parallel layout database versions is not clear.

Content Documentation in EDMS Layout Database Engineering Change Requests (ECRs) T. Birtwistle EN-MEF-DC

ECRs – Machine and Project Important tool to ensure that all changes are captured and the impact properly assessed in advance All changes to the machine (and project) that will impact the beam should be documented by ECRs Includes: powering, vacuum, re-naming… Templates available on MS Word, ‘New’, ‘My Templates’ Send to From HL-LHC; there is also the possibility of using ‘Space Reservation’ documents (essentially a simple ECR). T. Birtwistle EN-MEF-DC

Conclusions T. Birtwistle EN-MEF-DC17 Pilot project for PSB, to ensure that information is captured and the machine correctly documented and represented. Extend the presented points to the other LIU Projects Dividing hardware baselines (operational and upgrade nodes). Open point - Parallel layout database machine versions. ECR scope (operational machine and project) In line with HL-LHC Consistent approach across all machines for configuration, integration, layout.

Thank you for your attention Questions? T. Birtwistle EN-MEF-DC