Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.

Slides:



Advertisements
Similar presentations
Progress Report Günther RosnerNuPECC, Milano, 9/3/121.
Advertisements

FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
The Facility for Antiproton and Ion Research Günther RosnerNuPECC, FZ Jülich, 15/3/131.
TENCompetence Management Issues: WP1 Eric Kluijfhout.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt EU FP7 FAIR pp - 1st Reporting meeting March 6, 2009 J. Eschke, GSI EU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
Management’s preliminary comments to the ERC Report.
Peter Spiller, IHEP, Protvino GSI, Peter Spiller IHEP FAIR in kind Contributions.
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
FAIR GmbH and FAIR Project History, Status and Outlook
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR – Facility for Antiproton and Ion Research
FAIR – Status Report Walter F. Henning.
The Preparatory Phase Proposal a first draft to be discussed.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study Annual Report meeting December 7, 2006 J. Eschke,
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Geographical Enlargement of CERN Associate membership Principles and criteria S. Intoudi / 8 July
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
Chinese Contributions to FAIR Hushan Xu Institute of Modern Physics, CAS, Lanzhou
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
HL-LHC Organization: Now and post HiLumi
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Delivery of FAIR In-kind items (feedback from India) Subhasis Chattopadhyay VECC-Kolkata & BI-Kolkata.
LEB Meeting Status of the LEB (J. Gerl) Physics opportunities at the LEB (D. Ackermann) Latest news on the layout of the buncher/spectrometer (J. Winfield)
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany PANDA Collaboration, Giessen – 18 March 2014 Status and News from FAIR.
Peter Spiller, November 2012, Structure and Tasks of the Project Division Primary Beams Peter Spiller Machine Advisory Committee Meeting.
O. Kester, 6 th MAC meeting, Darmstadt, 10/10/2011 FAIR ACC planning and schedule O. Kester 6th FAIR - Machine Advisory Committee Meeting
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
Preparation Phase of the FAIR Project
Status of the FAIR Project
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
Concluding remarks E. Migneco
Status of LEB J. Gerl GSI – Darmstadt, Germany NUSTAR Week 2011
WP1 - Consortium coordination and management
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
(Procurement, testing of magnets)
REPORTS BY NEW PROJECT DIVISION HEADS: “Rare Isotope Beams”
Ways to industry participation in CLIC 24th October, 2017
Preliminary Project Execution Plan
Presentation transcript:

Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121

FAIR GmbH OrgChart Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/122 BFC FAIR Council Management Board Research APPA CBM NuSTAR PANDA Expert C‘ttee Experiments Project Office Experiments Technical Division Technical Services In-Kind Coordination Technical Follow-up Project Office Techn. Division Site & Buildings M&E Eng. Automation, IT M&E Eng. Power, Mat. M&E Eng. Thermo, Refrig. M&E Eng. Liqu., Gases Constr. Eng. Building, Geo. Constr. Managem. Eng. Reporting Project Office Site & Buildings Project Office Site & Buildings M&E Advisor Civil Eng. Advisor Admin. Internal Services Controlling Finance Purchasing Personnel Staff Office Legal Advisor Council Issues Secretariat Internal Auditing AFC Scientific Council IKRB MAC

OrgChart FAIR-GSI Collaboration Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/123

Modularised Start Version Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/124 APPA CBM/HADES NuSTAR PANDA Experiments M1: APPA M1: CBM/HADES M2: NuSTAR M3: PANDA M0 M1 M2 M3

Timeline Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/ Building permits Site preparation Civil construction contracts Building of accelerator & detector components Completion of civil construction work Installation & commissioning of accelerators and detectors Start Data taking

Civil Construction Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/126

First Post Drilling 31/8/2011 Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/127

Permits 09 / 1110 / 1111 / 1112 / 1101 / 12 Clearing permit Building application Application for afforestation Permit for site roads Application for water rights /23.11 Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/128

Clearing Construction Site 6/12/2011 Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/129

Further Preparatory Work 01 / 1202 / 1203 / 1204 / 12 Stripping of topsoil (area tree felling) Site roads (Messeler Parkstr.) Site roads (southern traffic link) Site roads (northern traffic link) Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/1210

Planning Activities 01 / 1202 / 1203 / 1204 / 12 Checking and approval of Lph 3 Checking of cost calculations (analysis of differences to ZBau) Technical route planning (Lph 5) Statics / layout drawings (Lph 5) Announcement of logistics Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/1211

Compact & cost effective Fast cycling superconducting magnets dB/dt ~ 4T/s Accelerators Ordered for SIS100 from Babcock Noell in Jan (German in-kind contribution, BMBF grant to GSI) Many other parts of SIS100 and CR in preparation (in- kind or tender) HESR ready to go out for tender (BMBF grant offered to FZJ) IKRB meeting at FAIR on 28/3/12 MAC meeting at FZJ on 2/4/12 Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/1212

MSV Experiments APPA SPARCHEDgeHOBWDMBIOMAT CBM HADES NuSTAR LEB Super-FRS HISPEC/ DESPEC MATSLASPECR3BR3BILIMA PANDA Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/1213

APPA Board of APPA Collaborations established Spokesman and Deputy elected Layout of APPA hall finalised Options explored for experiments at – HESR – ESR Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/1214 APPA

CBM HADES detector upgraded Collaboration with Dubna (Nica) being considered Finishing R&D work Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/1215 CBM

NuSTAR Cf. this meeting Hall LEB being considered by Collaboration – caveat: no funds available in MSV budget HESR being considered Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/1216 NuSTAR Super- FRS

PANDA R&D being finished Remaining TDRs being finalised FZJ being prepared Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/1217 PANDA

Costs MSV Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/1218 Accelerators and personnel (including Super-FRS)502 M€ Civil construction (excluding site related costs)400 M€ FAIR contribution to experimental end stations *78 M€ FAIR GmbH personnel & running until 2018 (>8 years)47 M€ Grand Total MSV, Modules M€ in 2005 € (inflation escalation until 2018: ca. +50%) * Total experimental end stations (excluding Super-FRS): ca. 210 M€ (2005) = 315 M€ (2018)

Tasks 2012/13 Collaborations finish R&D phase – Deliver prototypes of essential parts of detectors Collaborations submit TDRs – Take decisions on alternative technical solutions FAIR Research Division initiates and monitors procedures through – Project Office – Technical and Resource Co-ordinators FAIR establishes Expert Committee Experiments, ECE – Nominations by Collaborations – Co-ordination with FAIR Council Chair – Negotiations with nominees – Approval by FAIR Council FAIR establishes TDR Review Panels: ECE members (+ external experts) FAIR organises/monitors the co-ordination of experiments with – Civil construction – Accelerators/storage rings Collaborations identify, in collaboration with FAIR, critical pathways regarding – Timelines, milestones, deliverables Collaborations submit risk management plans – To be assessed by FAIR and – integrated into Risk Reports to AFC and Council Funding Issues – FAIR organises Resource Review Boards in collaboration with each Collaborations, which report to participating funding agencies Each Collaboration, their Funding Agencies and FAIR negotiate Construction MoU Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/1219

Thank you very much Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/1220